Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando 407.380.4685 December 2008.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

AIM Enterprise Central Site Planning
Configuration management
Software change management
Configuration Management
Review of AIM I/II Change Requests (ACRs) 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
YES New Mexico Enterprise Eligibility System
MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
DRM P-CM Roadmap V5_MCS Change Control: Rolling updates for Taxonomy, Adjusting Training, Technology, DRM Process, Facilities 5. Design Change Controls.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
Authoring Instructional Materials (AIM)
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
AIM Toolset Interfaces with Authoritative Technical Data
Authoring Instructional Materials (AIM)
Authoring Instructional Materials (AIM) Roadmap
NSW AIM FRB Utilization Discussion Karen Pohl Curriculum Systems Director Naval Special Warfare Center 4-6 November, 2009 Orlando, FL 1.
AIM FRB Briefing NAVSEA 07TR3 Sandra Wiegmann Submarine Training Systems Division NAVSEA 07TR3 4 Nov 2008.
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM – CeTARS Web Service Interface: Course Master Schedule and Other Possibilities November 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
AIM Program Software Status
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
1. Report status of traditional and modernized AIM
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
AIM Virtual FRB Meetings Sep, & 1400 Both Days.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
IT Briefing March IT Briefing Agenda 3/16/06 Security Announcements eResearch Overview Housing Overview & Demo Update on current performance problems.
Upgrading to IBM Cognos 10
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
NETPDTC AIM Central Site and CPM Hosting 4-6 May 2010 Bruce Bare, NETC, CIO Denise Green, CNATT, N6 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.
Center for Personal and Professional Development Harrison-Youngs/ Bartholomew ISD CPPD 4 November 2008.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM ACR Prioritization AIM ACR Prioritization 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Ron Zinnato, AIM Lead Engineer Jamie Stewart, AIM Lead ISD.
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Linking Blended Learning to Navy Fleet Performance Requirements, REAL-TIME Jake Aplanalp Naval Air Warfare Center, Training Systems Division.
1 AIM FRB Briefing Karen Pohl Curriculum Systems Director Naval Special Warfare Center 3 Nov 08.
1 NETC N7 Status Update to AIM FRB 4 November 2009 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Chapter 11: Software Configuration Management
Chapter 11: Software Configuration Management
Presentation transcript:

Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008

Focus of Presentation AIM Background & History AIM & Current Navy Standards AIM Software Status AIM & Future Navy Standards Questions

Authoring Instructional Materials (AIM): Government-owned & managed system used by the Navy to design, develop, update, manage, and integrate training content Provides automated conformance to standards (NAVEDTRA 130A/131A, ILE) resulting in efficient, cost effective development & maintenance of learning content Links learning requirements to performance standards Links learning content to Interactive Electronic Tech Manuals (IETMs) (**S1000D & other formats) Automates identification and notification of potential learning content update requirements based on performance standard & tech data changes Streamlines integration of changes into previous learning content baseline with minimum impact (because built on relational database) Supports multiple output methods (paper, PDF, HTML, & SCORM conformant XML formats) AIM is a mature application & service provider supporting the development & sustainment of 300,000+ instructional hours of formal Navy training content

CNET drafts Operational Requirement (OR)1981 NPRDC Conducts R&D NPRDC Awards R&D Contract1987 CNO Establish Project Manager 1989 AIM MNS/Milestone 0 Approved1990 Milestone I/II approved1992 Initial version of AIM (UNIX) distributed1993 Milestone III approved (Implementation)1994 AIM System Support Office (SSO) at NAWCTSD Established1994 AIM II Implementation1996 AIM I Implementation1997 Program Management Shift to NAWCTSD1997 IETM Interface1998 SCORM Output Utility2001 SQL Server2002 Word as editor; IMI Library2003 AIM first GOTS SCORM Adopter2004 Prototype LO Module; NMCI certification**2005 Navy ILE ILT authoring/maintenance tool**2006 Prototype Content Planning Module (CPM)**2007 NMCI Certification & Distribution of AIM LO Module**2008 CPM Operational**2008 AIM Historical Perspective Program of Record with history of continuous improvement and successful adaptability in meeting the users changing requirements and technology advances **Key Components of Modernized AIM

AIM-based Learning Content Usage* Big 3 Example Others include: SWS NSWC SPAWAR NMPT&E NSTEP CPPD CNE CID CEODD CSS *Data captured in 4 th Quarter of FY07

AIM Management Organization System Support Office (SSO) NAWCTSD Orlando System Support Office (SSO) NAWCTSD Orlando Program Manager OPNAV N75 Program Manager OPNAV N75 Program Manager NAWCTSD Orlando Program Manager NAWCTSD Orlando Configuration Control Board (CCB)/ Resource Sponsorship: Surface/Air/Sub/NETC Configuration Control Board (CCB)/ Resource Sponsorship: Surface/Air/Sub/NETC Functional Area Manager OPNAV – N00T Functional Area Manager OPNAV – N00T Executive Steering Committee (ESC) Functional Requirements Board (FRB) Executive Steering Committee (ESC) Functional Requirements Board (FRB) Functional Area Manager OPNAV – N12 (proposed) Functional Area Manager OPNAV – N12 (proposed) Functional Area Manager OPNAV – N79 Functional Area Manager OPNAV – N79 Functional Area Manager OPNAV Functional Area Manager OPNAV Prime Support Contractor- Columbus Technologies Prime Support Contractor- Columbus Technologies

AIM & Navy Training Standards AIM follows ISD rules of the PADDIE model AIM I built on NAVEDTRA 131A Personnel Performance Profile (PPP) based curriculum model AIM II built on NAVEDTRA 130A Task based curriculum model Traditional AIM links content to CTTL / PPP tables AIM continues support for traditional 130/131 content formats as well as ILE content rules per evolving NETC & Navy Standards AIM outputs Printable Material (PDF), SCORM-compliant XML Files ( LMS, electronic classrooms, repositories), CeTARS CMS Web service, & Database export for use in other AIM systems or content authoring tools

Why Modernized AIM? Modernized AIM Can Tie This Entire Content Lifecycle Process Together!

AIM Modernization Timeline

ILE Architecture – 1 Start with Validated Requirements (Competencies) Competencies/ JTA

ILE Architecture – 2 Plan Learning Development by linking to Competencies and Derived JTA Data Stored in Repository Learning Objective Statements Course Planning Competencies/ JTA

ILE Architecture – 3 Use Learning Plan Data Linked to Competencies and Derived JTA Data to Build Learning Objects Competencies /JTA Learning Objective Statements Course Planning Course Development

ILE Architecture – 4 Deploy/Manage Learning Objects Competencies /JTA Learning Objective Statements Course Planning Course Development Competency Delivery

ILE Architecture – 5 Use Links to Competencies, Derived JTA Data and Technical Data for Surveillance/Maintenance of Learning Objects Competencies /JTA Learning Objective Statements Course Planning Course Development Course Maintenance

AIM Considerations History of AIM – consistent success in past, updated over time, now extending to ILE-based learning – leveraging historical ROI and TOC reduction One GOTS tool supporting: –Traditional content development/maintenance –Migration of traditional to new (ILE) –New development (ILE) Gaps in current Navy Training Environment: –ILT in ILE suite –JTI/NJA/NLOS links to learning content –Integrated, performance-based design, development, and maintenance of both ILT and self-paced learning content –Automated surveillance capability to drive down significant total ownership cost of learning content Modernized AIM can fill those gaps

Summary What can AIM do for Centers/SYSCOMS? –Leverage historical strengths in standardized content design, development, surveillance, maintenance, production, management, and user support Future –Be used for Traditional (130/131) & Future (ILE- based) training content –Provide strong support for RIT II themes – especially Tie Learning to Navy Work & Navy Learning Continuums –Leverage AIM team, contract, and user community infrastructure that is in place to support users

Summary (Continued) What AIM program needs from Centers/SYSCOMS? –Active AIM Users: Participate in the FRB and supporting IPTs Provide input to improve the toolset –Non-AIM users: Try AIM on a small scale (traditional/modernized) –Get training and assistance to support trial efforts

Upcoming AIM Training Schedule DateTopic 12-Nov-08Overview of AIM Program & Software: Schedule of Upcoming Web meetings 10-Dec-08AIM: Training Project Plan (TPP) 7-Jan-09AIM: Course Training Task List (CTTL) 21-Jan-09AIM: Learning Objectives 4-Feb-09AIM: Course Outline of Instruction (COI) 4-Mar-09AIM: Course Master Schedule (CMS) 18-Mar-09AIM: Training Course Control Document (TCCD) 1-Apr-09AIM: Learning Content Overview 15-Apr-09AIM: CPM Overview of TPP & TCCD Functionality 29-Apr-09AIM: CPM Project Development 13-May-09AIM: Overview of LO Module ** All Training at 1500 EST w/ Webmeeting & Phone info posted at AIM website

Points of Contact, Website Program ManagerProgram Manager Jake Aplanalp Asst Program ManagerAsst Program Manager Patti Eder Software Engineering/Help DeskSoftware Engineering/Help Desk Ron Zinnato ISD LeadISD Lead Paul Graf