Juan, Emanuele, Natalia, Yngve, Sofia

Slides:



Advertisements
Similar presentations
XAL Recent Development
Advertisements

Functions.
Cooling channel issues U. Bravar Univ. of Oxford 31-Mar-2004.
Mi-Joung choi, Hong-Taek Ju, Hyun-Jun Cha, Sook-Hyang Kim and J
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
CONTINUOUS INTEGRATION, DELIVERY & DEPLOYMENT ONE CLICK DELIVERY.
Introduction Status of SC simulations at CERN
Planning for Divisions. Meeting Goals  Provide Baseline Overview of Divisions  Review Divisions Plan & Testing To Date.
ESS DTL beam commissioning
SciDAC Accelerator Simulation project: FNAL Booster modeling, status and plans Robert D. Ryne, P. Spentzouris.
Presentation on SubmissionTrackingTool: by Anjan Sharma.
BROOKHAVEN SCIENCE ASSOCIATES High level applications and EPICS control GUOBAO SHEN NSLS-II, Control Group May 4 th, 2009.
COMMITMENT CONTROL IN ADVANTAGE PLEX for DB2/400 Yolanda Scholtz 18 November 2002 Session - 4E 15: :00 EDGE EMEA Conference
12/3/2015J-PARC1 High Level Physics Applications XAL – An Accelerator Hierarchy Day 1: Accelerator View from the Physicist.
Paul Chu SLAC App. 10/14/ SLAC (LCLS) Application Plans P. Chu for SLAC High-Level Application Team.
Managed by UT-Battelle for the Department of Energy Using Online Single Particle Model for SNS Accelerator Tuning Andrei Shishlo, Alexander Aleksandrov.
J-PARC Trace3D Upgrades Christopher K. Allen Los Alamos National Laboratory.
August 2003 At A Glance The IRC is a platform independent, extensible, and adaptive framework that provides robust, interactive, and distributed control.
Particle Production with Carbon Target and IDS120j Configuration at 3 GeV (update) X. Ding, UCLA Target Studies Nov. 14, /14/13.
Paul Chu XAL for 10/14/ XAL for SLAC/LCLS Paul Chu.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
“WISE” Simulation of optical imperfections in LHC P. Hagen AT/MCS Acknowledgements: Colleagues in AT/MAS, AT/MEL, AT/MTM, AB/ABP CERN, October 2006.
Bug Elimination Ghislain Roy MAD-X Meeting 09 May 2014.
SLAC LET Meeting Global Design Effort 1 CHEF: Recent Activity + Observations about Dispersion in Linacs Jean-Francois Ostiguy FNAL.
ESS Integrated Control System Software Core Components S.Gysin
Development of Commissioning Software for CSNS Weibin Liu on behalf of CSNS AP Group Yuwen An, Mingyang Huang, Mingtao Li, Yong Li, Zhiping Li, Yudong.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
XAL Applications Development in CSNS Weibin Liu for AP Group of CSNS Yuwen An, Mingyang Huang, Mingtao Li, Yong Li, Zhiping Li, Yudong Liu, Jun Peng, Jing.
S7-1 ADM730, Section 7, September 2005 Copyright  2005 MSC.Software Corporation SECTION 7 ADVANCED TOPICS.
Authors: Dmitrii Pereima, ITEP; Dmitry Golubkov, ITEP; Iouri Gouz, IHEP; Victor Egorychev, ITEP. Visualization of HCAL 137 Cs calibration data 1 CALO +
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
LCLS Commissioning & Operations High Level Software
Business rules.
Do-more Technical Training
Maven 04 March
© 2002, Cisco Systems, Inc. All rights reserved.
Self Healing and Dynamic Construction Framework:
Indexing Innovations 14.2 Seminar 14.1 Seminar - Filing Procedures.
Ben Cerio Office of Science, SULI Program 2006
Overview – SOE PatchTT December 2013.
Transfer line test: Beam stability measurements
Releases and developments
LCLS Commissioning & Operations High Level Software
Pass Oracle 1Z0-499 Exam with Valid 1Z0-499 Exam Question Answers - Dumps4download
Microsoft Ignite NZ October 2016 SKYCITY, Auckland.
Following Initial Design Review
Work Update J. Rzepiela 8/17/10.
Single-bunch instability preliminary studies ongoing.
Use of Mathematics using Technology (Maltlab)
SIGNIFICANT PHYSICS CHANGES
Emanuele, Juan, Natalia and Yngve
Helping a friend out Guidelines for better software
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Beam-Based Alignment Results
A Virtual Implementation of VELA (CLARA)
Summary & Concluding remarks
High Level Physics Applications for LCLS Commissioning
Studies on orbit corrections
IR Lattice with Detector Solenoid
VISUAL COMMUNICATION USING ADOBE PHOTOSHOP CREATIVE SUITE 5
Linac Diagnostics Commissioning Experience
Safety Readiness Review (SRR) Thomas Hansson, ESH
Progress Update on the Electron Polarization Study in the JLEIC
LHC An LHC OP guide… under construction J. Wenninger
Lessons Learned: Software and Machine Studies, AD perspective
High Level Physics Applications Lehman Review February 7 - 9, 2006
Update on Software Scope Control System Software
Presentation transcript:

Juan, Emanuele, Natalia, Yngve, Sofia OpenXAL status at ESS Juan, Emanuele, Natalia, Yngve, Sofia www.europeanspallationsource.se 25 December, 2018

Framework ESS OpenXAL version now 1.1.0 (and 1.1.1-SNAPSHOT) Build & test system has been upgraded, using Jenkins pipelines now. Deployment strategy changed, will make one big tarball for deployment (rather than a shell script which runs many commands) LEBT section added to the ESS model

Update on ESS Model (JELS) JELS was doing calculations in the beam frame of reference instead of the lab frame (Open XAL default) All transfer maps were updated to use the lab frame and be consistent with Open XAL convention (including space-charge) RF Fieldmap – integrator optimized and corrected for LIVE simulations (broken) New elements: ESS DTLTank class, using our RFGap implementation Solenoid fieldmap for the LEBT All unit tests redone and benchmarked against TraceWin

Applications update Removed Modelmanager, will reuse parts of the logic in other applications Application in beta, Trajectory Correction (replacing Orbit Correction) Application in alpha, LEBT Application Application in alpha version, Scanner (replacing Scan1D, Scan2D) Application in development, Configurator (replacing some logic in MM, optics switcher, tracewin importer and more)

Trajectory Correction JavaFX One-to-one works SVD correction also working Ability to define any set of BPM+steerers for correction (no sequence boundaries) Support Applications: Trajectory Display (displays the bare trajectory and/or trajectory difference to a reference)

LEBT Application JavaFX Solenoid field as maps Corrector superimposed to solenoids Center of mass and envelope calculations Some PVs from the ion source implemented Idea: quick modeling and display of the LEBT main features and diagnostics. Supposed to aid during commissioning.

Scanner JavaFX Scan N variables, read M variables (plus the scan ones) Can limit scan by functions Select a PV from multiple elements at once (e.g. xAvg from all BPM) Borrowed code from Model Browser Basic plotting, no analysis

Configurator JavaFX Import from TraceWin (formerly in model manager), both from files or git repository Replace Optics Switcher RBAC enable switch

Discussion Topics Java9? IPAC and other conferences next year?