Week 36 plan Todo’s: And also: 12+b injection.

Slides:



Advertisements
Similar presentations
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Advertisements

Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:30 meetingEBH 1  4:14 lost cryo conditions in Sector 34/45 due to communication problem  6:30 Faulty IT network switch identified  access.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ion Commissioning: Thursday & Friday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 11/07: Recovery Plenty of accesses.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
LHC Morning Meeting - G. Arduini
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Monday – recovery from MKI flashover
Summary week 30 Week 30 R. Bailey & J. Wenninger
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
Mike Lamont, Jorg Wenninger
Saturday 2/4/ :00-09:00 Problems with SPS:
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Plan for 1 m b* J. Uythoven & J. Wenninger
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
LHC Status Fro Morning 9-Sep
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Tuesday – Morning and Evening
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Monday 10th December - morning
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

Week 36 plan Todo’s: And also: 12+b injection. Special fill 84b for LR BB. Loss maps ‘a gogo’. Intensity ramp up. And also: Define ALFA and TOTEM RP settings, prepare them in LSA. 12/25/2018 LHC 8:30 meeting

Part1: work with 50 ns Injection of 50 ns. Injection of 12b, steering if needed. Injection of 36,72,144 to checkout injection. Special fill for LR beam-beam. 12 + 2x36 bunches, Scheme 50ns_84b_36_36_36_BBMD3. Ramp, squeeze, collide: stability, lifetime. In collisions for ~1 hour. Done Done – to be checked 12/25/2018 LHC 8:30 meeting

Part 2: validation / loss maps Loss maps injection. Betatron H + V, off-momentum +/-, asynch dump. Fresh beams for each test. Swap H and V tunes for H loss map. Loss maps at flat top (unsqueezed) – 1 fill. Betatron H + V, asynch dump. Loss maps end of squeeze to 1m (separated !) – 1 fill. Loss maps with collisions – 1 fill. ALFA and TOTEM RPs in beam. ALFA and TOTEM RPs in beam –1-2 hours (data taking test) Off-momentum test dp/p + (RF frequency trim -500 Hz). Almost done ½ Done Done 12/25/2018 LHC 8:30 meeting

Part 3: intensity ramp up Ramp up for stable beams: 264 – few hours 480 – short fill 912 – long fill 1380 – finally !! 12/25/2018 LMC - beta* 1 m

Monday 10:30 Fill for loss map with TCTs @ 14 sigma (end of squeeze, separated) lost just before starting the loss maps. Sector 56 tripped – network communication was cut by accident during an intervention… Retry… 14:30 Loss map and asynch. dump test with TCTs @ 14 sigma (end of squeeze, separated). Good results – confirm that triplet in shadow with 14 sigma. 12/25/2018 LHC 8:30 meeting

Validations with TCTs at 14 sigma Asynch. dump test OK (C. Bracco). Collimation - preliminary analysis (D. Wollmann): All loss maps look ok: Leakage into the TCTs below 1e-3. Leakage into cold magnets in IR1/IR5 ~ 1 order of magnitude below the corresponding TCT. No un-expected losses into cold magnets. Couldn't reproduce the leakage into the Q10R1 (as reported Saturday night). Highest leakage into cold magnets found in Q8 of IR7: - B1-H: ~3.5e-4 - B1-V: ~2.5e-4 - B2-H: ~5e-4 - B2-V: ~2.5e-4 12/25/2018 LHC 8:30 meeting

B1 H 12/25/2018 LHC 8:30 meeting

B1 V 12/25/2018 LHC 8:30 meeting

B2 H 12/25/2018 LHC 8:30 meeting

B2 V 12/25/2018 LHC 8:30 meeting

Asynch dump, TCTs @ 14 sigma. No losses visible in triplets. 12/25/2018 LHC 8:30 meeting

Monday continued 16:00 Injection setup. 17:00 Injection check 12b. Verification of the magnet synchronization of B1 (E. Carlier) Kick delay - MAIN-D : no change (reference magnet for synchronisation) - MAIN-C : -75ns (old delay: 1100ns - new delay: 1025ns) - MAIN-B : +10ns (old delay: 1140ns - new delay: 1150ns) - MAIN-A : no change Kick length - DUMP-D : no change - DUMP-C : +95ns (old delay: 1000ns - new delay: 1095ns) - DUMP-B : +50ns (old delay: 1090ns - new delay: 1140ns) - DUMP-A : +100ns (old delay: 1000ns - new delay: 1100ns) 17:00 Injection check 12b. OK – no problems. 12/25/2018 LHC 8:30 meeting

Monday continued 18:15 Lost the cryogenics conditions for MSL2 and ITL2. Worldfip communication problem. 18:50 Vacuum valves in LSS2. Gauge switched off. 21:00 Back to injection. Injection of up to 144b – worked but not at its best. Losses from circulating beam (tbc), and some injection oscillations. 00:00 Loss maps at injection. Injection protection out. H and V were not done with separate beams  repeat. 12/25/2018 LHC 8:30 meeting

Off-momentum loss map at injection. HV problem? Re-cabled BLM? 12/25/2018 LHC 8:30 meeting

Night 00:20 Loss maps at flat top. Betatron H + V. B1 lost before asynch. dump test by spurious SIS interlock. Asynch. dump to be repeated. Lot’s of CMW errors… including SIS interlock. 05:30 Loss maps at end of squeeze. Betatron H+V ansd asynch dump test. 12/25/2018 LHC 8:30 meeting

Validation matrix Injection to be done also with injection protection (betatron) Condition Betatron H Betatron V Dp/p + Dp/p - Dump Injection DONE REPEAT Flat top --- Squeezed Collisions OK X 12/25/2018 LMC - beta* 1 m

Today Finishing injection loss maps now. Long range BB test with 84b. Injection checkout to 144b. Continue loss maps / repeat if not good. IR3 R-side BLMs. Collision maps with RPs. 12/25/2018 LHC 8:30 meeting

Accelerator Mode Particle Type Name in the database & over DIP  PROTON-NUCLEUS PHYSICS Name in the timing telegram = AMODE  Line = PAPHYS, value=16 Particle Type New groups! With name in the timing telegram  PARTY1 (= particle type for B1) PARTY2 (= particle type for B2) PARTY1(2) is group number=23(24) Lines  Over DIP you see them under RunControl/RunConfiguration: PARTICLE_TYPE_B1 & PARTICLE_TYPE_B2 Proton (Proton), value=1 Pb82 (Lead 82+), value=2 Ar18 (Argon 18+), value=3 D (Deuteron), value=4 Xe54 (Xenon 54+), value=5 The bold names are used in the database (what you see over DIP)

The following telegram groups have been suppressed 23 C1BNCH Circulating number of bunches - Ring 1 24 C1BSP Circulating bunch spacing - Ring 1 25 C1BIN Circulating bunch intensity - Ring 1 26 CPTY Circulating particle type - Ring 1 and 2 27 C2BNCH Circulating number of bunches - Ring 2 28 C2BSP Circulating bunch spacing - Ring 2 29 C2BIN Circulating bunch intensity - Ring 2