Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband.
Advertisements

Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
LHC Status Fri Morning 3-June
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
LHC Status Tue Morning 22-Aug
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Saturday 24 March 2012.
Friday 15th June 01:11 Injection.
Wednesday September 14th
Wednesday 21 March 2012.
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Luminosity lifetime – fill 2932
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Tuesday Nov 16th Fill 1492 into physics around 07.30
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Thursday morning 09:30 Dump of pPb fill.
Bernhard Holzer, Joerg Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 20 March 2012.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Chromaticity can make a difference…
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 14:00 beam dump Access:
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 24 September 2011.
Wednesday h18: 228b fill lost just before start of ramp.
LHC Morning Meeting - G. Arduini
Tuesday – Morning and Evening
Another Immortal Fill….
Monday 27th August & night
Wednesday morning Waiting for PS – problem on RF cavity.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
31/3/2010 Difficult day… but at the end stable beams.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Wednesday 8th August & night 01:25 Stable Beams fill #2927, 1374 bunches (vertical instability end of squeeze) 09:31 Operator dump. Int. lumi 103 pb-1 12:10 Stable beam fill #2928, still vertical instability end of squeeze. Initial lumi 6.2e33 cm-2s-1 14:28 Beams dumped by QPS trigger on RQSX3.R1. Probably SEU. Int. lum 45 pb-1. 20:03 Stable Beams Fill #2929. Init lumi 6.3e33 cm-2s-1, still some instability squeeze B2V at ~1.5m beta star, but starts to look better. 01:48 Beams dumped. RB energy check went false, SMP energy glitch? Integrated lumi 94 pb-1 05:35 Stable beams Fill #2932. Initial lumis 6.5e33 cm-2s-1 09/08/2012 LHC 8:30 meeting

Fill #2928 (stable beams 12:10) As the previous fill Tuesday – Wednesday had instabilities in the squeeze for this fill Increase octupoles to 475 A end of ramp (from 417 A) Increase vertical chromaticity in squeeze to around 7 Again stable in the ramp, but unstable in squeeze Some small losses right in the beginning of squeeze, 1 % level, when tunes get moved. These bunches also blow-up vertical plane More instabilities around beta of 1.2 m After squeeze: Q’v by +3 units and Q’h by two units, both beams, beams more stable Collision process fine 09/08/2012 LHC 8:30 meeting

Fill #2928 losses during squeeze Still, initial lumi around 6.3e33 cm-2s-1 09/08/2012 LHC 8:30 meeting

During and after this fill After lumi optimisation, ATLAS and CMS lumi no equal within 1 % A. Masi called to warn us that the TDI.4R8 has not reached its nominal position on the right jaw. This looks like the same problem we had before. The worrying thing is that we do not get any warning or error signal! Later that evening: Tolerance for TDI position in the new check tasks (CHECK INJ-PROT OUT) increased to 300um 14:28, after about 2 h of stable beam, beams dumped by QPS trigger on RQSX3.R1. Probably SEU. Turn around to next fill slowed down because QPS reset needed on RB.A12 and on RCD.A78 and RCS.A78 Needs additional precycle after reset ADT module V2B2 tripped, low voltage pc problem, solved after about 2 h During next fill, at end of squeeze, the ADT module V2B2 again tripped No beam from PS for about 30 minutes 09/08/2012 LHC 8:30 meeting

Tobias Persson, Rogelio In the mean time.... Coupling measurement check at injection with probes ‘We performed a test to use the injection oscillations to measure the coupling. The idea is to provide an automatic way to correct the coupling after a pilot is injected. We introduced some extra coupling which we measured and corrected using the new software. Were able to "on-line" calculate a good correction that decreased the coupling significantly. The test was only performed for beam2.’ Tobias Persson, Rogelio 09/08/2012 LHC 8:30 meeting

Next fill (#2929) To try to get the beam stable in squeeze, changed: Octupoles end of ramp up to 510 A – down to 400 A in physics Chromaticity up +2 H and +3 V end of ramp Instability occurred on B2V at ~1.5m beta star, like previous fill ... the instability disappeared by itself So some improvement relative to previous fill For the next fill we will raise the chroma in the squeeze B2V 09/08/2012 LHC 8:30 meeting

Losses less important this fill 20:03 Stable beams 09/08/2012 LHC 8:30 meeting

During the fill, end of the fill 20:58 trip RCBH18.L1B Messy orbit can be corrected Only had current of about 1 A 01:48 Beams dumped. RB energy check went false, SMP energy glitch? Nothing found in the logging Integrated lumi 94 pb-1 09/08/2012 LHC 8:30 meeting

Fill #2932 Quite some injection steering SPS in MD mode affecting the LHC cycle At the end of the ramp trimmed the tune H (+0.001 for beam 1 and + 0.002 for beam 2) During the squeeze unstable in B2 H Octupoles end of ramp up to 510 A – down to 400 A in physics Chromaticity up +2 H and +3 V end of ramp relative to prev. fill Add end of squeeze manually trim up chroma H by + 2 units both beams B2H 09/08/2012 LHC 8:30 meeting

BSRT scans before going to collision 09/08/2012 LHC 8:30 meeting

However, poor lifetime. Optimise with tune, chroma, octupole strength Good initial lumi’s However, poor lifetime. Optimise with tune, chroma, octupole strength 09/08/2012 LHC 8:30 meeting

Various SPS intervention (EDF) Thursday 10:00 for 2-3 hours TOTEM – move in half way through a fill to take data... LHCb polarity change (Friday) Octupole polarity check with beam Further tests of tune measurements with damper At injection and some time during fill (use LHCb test ramp?) Access list developing ATLAS Xenon leak – semi urgent 2 h access, preferably today Markus Z. – point 4 – di/dt N. Magnin – LBDS RP – RAMSES reset Ralph S. – UA47 and tunnel 09/08/2012 LHC 8:30 meeting