Implementing CMMI® for Development Version 1.3

Slides:



Advertisements
Similar presentations
CMMI Arnon Rotem-Gal-Oz. The kings Ship Wasa No Specification No Specification No Architecture description No Architecture description Changes.
Advertisements

INCOSE Presentation San Francisco Chapter 13 October 2009 Mapping CMMI to Systems Engineering Adrienne Friedman.
Presented by: Bruce Boyd 28 January 2004
Copyright © 2003 by Cooliemon TM, LLC 1 Causal Analysis & Resolution (CAR) at Level 1 Presenter: Ralph Williams, President SEI Authorized CBA IPI Lead.
SPIN-BG Seminar 1.Overview of CMMI Model changes 3.SCAMPI method changes 4.Training changes 5.CMMI Architecture Author: Kiril Karaatanasov
Kai H. Chang COMP 6710 Course NotesSlide CMMI-1 Auburn University Computer Science and Software Engineering Capability Maturity Model Integration - CMMI.
Angus MacIntyre Software Engineering Institute Lead Appraiser
National Cheng-Kung University
Overview of Changes Introduced in CMMI ® v1.3 ASEE Annual Meeting February 19, 2011 Dr. Richard Waina Multi-Dimensional Maturity Based on presentations.
Capability Maturity Model Integration CMMI®
SCAMPI Sampling Rules 1 Sampling the SCAMPI Sampling Rules or Trying to Explain the Unexplainable Pat O’Toole, PACT May,
1 Software Process Models Lawrence ChungSoftware Engineering.
Copyright 2005 CMMI and ITIL Alison Adams & Kieran Doyle.
Copyright 2003 CMMI: Executive Briefing Presented by Kieran Doyle
Sarbanes Oxley & CMMI Mazars / Lamri
1 Intro to the CMMI (Capability Maturity Model Integration) Management Overview.
SM CMM Integration, SCAMPI, SCAMPI Lead Assessor, SCAMPI Lead Appraiser, and SEI are service marks of Carnegie Mellon University.  CMM and CMMI are registered.
CMMI Overview Satish Mishra
© SPI PARTNERS, 2003, 1 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro How Competitive Engineering (Tom Gilb) Supports.
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
Software Quality Processes – Part II CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology March 19, 2007.
Lecture 11 CMM CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
CMMI December 3rd 2014.
CS 577b Software Engineering II -- Introduction
CS 577b Software Engineering II -- Introduction
CMMI Course Summary CMMI course Module 9..
Capability Maturity Model Integration
Copyright © 2009, Systems and Software Consortium, Inc. Introduction to an Integrated Lean Thinking, Six Sigma  and CMMI  Approach for Process Improvement.
8. CMMI Standards and Certifications
Integrated Capability Maturity Model (CMMI)
TRIALS & TRIBULATIONS ON THE ROAD TO CMMI Process Focus Management Roselyn Whitney Principal 9956 North River Rd. Algonac, MI
Capability Maturity Model. Reflection Have you ever been a part of, or observed, a “difficult” software development effort? How did the difficulty surface?
The Capability Maturity Model in Software Development Paul X. Harder, JD Government Micro Resources, Inc. September 14, 2004.
Light-Weight CMMI (Capability Maturity Model Integration ) Stage 1: Requirement Development and Project Planning For NSC Open Source Projects Dr. Chaw-Kwei.
Process Assessment Motivation SEI Capability Maturity Model
Pittsburgh, PA  Sponsored by the U.S. Department of Defense © 2003 by Carnegie Mellon University CMMI ® CMMI ® - Improving and I ntegrating.
CMMi What is CMMi? Basic terms Levels Common Features Assessment process List of KPAs for each level.
People First … Mission Always Capability Maturity Model Integration (CMMI ® ) Millee Sapp 2 Dec 08 Warner Robins Air Logistics Center.
Software Engineering Lecture # 17
Sponsored by the U.S. Department of Defense © 2003 by Carnegie Mellon University page 1 Pittsburgh, PA CMMI ® CMMI ® – The Next Step in Process.
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
1 ISO 9001:2000 ISO 9001 is the creation of the International Organisation for Standardisation (ISO), a Swiss-based federation of national standards bodies.ISO.
Application of the CMMI SM to Plan and Control Life Cycle Costs Dr. Mary Anne Herndon Science Applications International Corporation (SAIC) November, 2003.
Using the CMMI in small Organisations Stephen Fletcher PAS Ltd, UK.
1 © Mahindra Satyam 2009 Mahindra Satyam Confidential Welcome To CMMI Introduction.
1 通信软件开发与管理 Course OD601 学时: 32 学分: 2 讲师:罗文彬. 2 Communication Overview System Architecture Overview Performance and Reliability Operation, Administration,
IS Methodologies. Systems Development Life Cycle - SDLC Planning Planning define the system to be developed define the system to be developed Set the.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
Software Engineering - I
January 2003 CMMI ® CMMI ® V1.1 Tutorial Sponsored by the U.S. Department of Defense © 2003 by Carnegie Mellon University SM CMM Integration and SCAMPI.
University of Southern California Center for Systems and Software Engineering CMMI 1.3 CS 577b Software Engineering II Supannika Koolmanojwong.
Guidelines for Process
CMMI November 25 th Copyright © 2015 Accenture All rights reserved. The aim of the presentation is to introduce Capability Maturity Model Integrated.
An Introduction. Objective - Understand the difference between CMM & CMMI - Understand the Structure of CMMI.
9 th Annual National Defense Industrial Association CMMI Technology Conference and User Group November 18, 2009 Denver, Colorado, USA Bill Smith, CEO Leading.
Copyright © | Trade secret and confidential Page 1 Innovative, Professional, Fact Based and Eustressed© Maruthi Quality Management Services Ptv. Ltd..,
CMMI1 Capability Maturity Model Integration Eyal Ben-Ari 8/2006.
MSA Orientation – v203a 1 What’s RIGHT with the CMMI?!? Pat O’Toole
© 2004 Tangram Hi-Tech Solutions Project Management According to the CMMI1 Project Management according to the Capability Maturity Model (CMMI)
CMMI for Services, Version 1.3
Certification: CMMI Emerson Murphy-Hill. Capability Maturity Model Integration (CMMI) Creation of the Software Engineering Institute (SEI) at Carnegie.
Figures – Chapter 26. Figure 26.1 Factors affecting software product quality.
Overview of CMMI Global Certification Consultant is aiming to designed CMMI Presentation to share knowledge about CMMI,
CS 577b Software Engineering II -- Introduction
Capability Maturity Model Integration
CMMI November 22nd 2017.
CS 577b Software Engineering II -- Introduction
CMMI November 2018.
Experiences with a Single PA SCAMPIsm
Acknowledgment of achievement
Presentation transcript:

Implementing CMMI® for Development Version 1.3 QValue Services QValue Services qvalue@qvalueservices.com www.qvalueservices.com SEISM, CMMI®, Capability Maturity Model IntegrationSM, SCAMPISM are service marks of Carnegie Mellon University. CMM® and Capability Maturity Model are registered in the US Patent and Trademark office.. “PMP” and “PgMP” are registered certification marks of Project Management Institute, Inc

The What of CMMI for Development CMMI for Development is a reference model that covers the development and maintenance activities applied to both products and services. A framework describing key elements of effective process … a guide to evolve from ad-hoc, immature practices to mature, disciplined process A collection of good practices (project/process management, engineering, support) to achieve business goals relating to Cost, Schedule, Functionality, Product/Service quality A reference to improve your business processes CMMI best practices state WHAT to do, but neither WHO should do it, or HOW it is to be done

Process Areas (CMMI-Dev) Flexibility in CMMI for Development V1.3 Staged Process Areas (CMMI-Dev) Requirements Management (REQM) Project Planning (PP) Project Monitoring and Control (PMC) Measurement and Analysis (MA) Process and Product Quality Assurance (PPQA) Configuration Management (CM) Supplier Agreement Management (SAM) Requirements Development (RD) Technical Solution (TS) Product Integration (PI) Verification (VER) Validation (VAL) Organizational Process Focus (OPF) Organizational Process Definition (OPD) Organizational Training (OT) Integrated Project Management (IPM) Risk Management (RSKM) Decision Analysis and Resolution (DAR) Organizational Process Performance (OPP) Quantitative Project Management (QPM) Organizational Innovation & Deployment (OID) Causal Analysis and Resolution (CAR) Continuous PA Capability 0 1 2 3 4 5 Process ML5 ML4 ML3 ML2 ML 1 Organization Process Management OPF, OPD, OT, OPP, OID Maturity Level 5 OID, CAR Maturity Level 4 OPP, QPM Project Management REQM, PP, PMC, SAM, IPM, RSKM, QPM Support CM, PPQA, MA, CAR, DAR Maturity Level 3 RM, TS, PI, VER, VAL, OPF, OPD, OT, IPM, RSKM, DAR Maturity Level 2 REQM, PP, PMC, MA, PPQA, CM, SAM Engineering RD, TS, PI, VER, VAL One Appraisal Method (SCAMPI)

CMMI Representation Options Staged Organization Maturity Level approach Process Areas clustered by maturity level Known and defined path for process improvement Organization chooses target Maturity Level Maturity Level provided as option in SCAMPI Continuous Process Capability approach for organization Process Areas organized by process threads Cluster of process area for improvement chosen by org Organization chooses target Capability Levels in chosen PAs Capability profile by PA provided in SCAMPI (Equivalent Staging possible, if opted for – here, it becomes similar to Staged !)

Approach for CMMI Become Familiar With CMMI-Dev## Understand Content and Scope Interpret Model for Your Organization Select Representation Staged Continuous Perform SCAMPI C / Gap Analysis w.r.t CMMI (Mapping of Existing Processes to CMMI) Develop and Implement Transition Plan Extend PI Infrastructure to address CMMI needs Leverage investment in any legacy model (ISO/CMM) ## two other constellations, namely, CMMI-SVC & CMMI-ACQ also available

About SCAMPI family SEI acknowledged methods for progressive appraisals with varying depth - Approach (C)  Deployment (B)  Institutionalization (A) Any SCAMPI (A/B/C) Appraisal includes: ATM Training (in C, if team is used) SEI Authorized ‘Intro to CMMI’ training for ATMs Preparation & Planning Onsite Appraisal Report generation & Registering with SEI SCAMPI A to be lead by SEI Authorized Lead Appraiser SCAMPI B/C to be lead by SEI Authorized Team Lead SCAMPI Appraisal Result valid for 3 years

Plan For CMMI Implementation CMMi overview training Gap Analysis / SCAMPI C Roadmap & Action Plan PA Training Consulting Official “Intro to CMMi Training” Pre-Appraisal / SCAMPI B Final Appraisal: SCAMPI A

Timeline to move between Levels Data indicate variability in the time needed to move between Maturity Levels However, appraisal results indicate some average values - Maturity Levels Average timeline Level 1 to 2 5 months Level 2 to 3 19 months Level 3 to 4 25 months Level 3 to 5 23 months

Challenges and Risks in Transition As the Senior Manager, expect the following barriers and help the organization overcome them - Resistance to any form of Change ‘Please Excuse Me, I’m busy’ Process improvement would happen, but my delivery is more important The ‘Quality group’ is marginalized – anyway they are there to make quality happen Consider some risks in transition - Management commitment ! Trap of ‘best’ implementation – they succeeded this way syndrome Pace of organizational change – neither too fast nor too slow Open to accept mistakes and rectify

Thank You qvalue@qvalueservices.com … We look forward to jointly working with you on your Quality journey !!