QAD – PSW/MSW Add-on Install MWUG – Presentation by Capital Safety

Slides:



Advertisements
Similar presentations
Training Guide. `
Advertisements

CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
QAD Integrated Customization Toolkit (ICT)
QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review Carianne Nieuwstraten, QAD Product Manager MWUG, March 20, 2012.
QAD .Net UI: New Enhancements
MWUG Fall 2010 Recent EDI eCommerce Enhancements.
QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG.
Collaborative Product Adoption Speed the Sales Process for Faster Time to Revenue.
QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC.
Microsoft FrontPage 2003 Illustrated Complete Finalizing a Web Site.
QAD.NET UI – Tips n Tricks Stacy Elwood, BravePoint MWUG March 2010.
Object-Oriented Modeling Chapter 10 CSCI CSCI 1302 – Object-Oriented Modeling2 Outline The Software Development Process Discovering Relationships.
QAD Reporting Framework Stacy Green, BravePoint MWUG Mar 2013.
Business Continuity Planning with Strohl Systems Software (800)
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
What’s New in QAD’s.NET UI? Browse Updates, Guide Me, and more! Stacy Elwood, BravePoint MWUG September 2010.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
Scribe Technical Workshop Adapter for OLE DB Import-Export Wizard September 13, 2007.
IBM Software Group © 2008 IBM Corporation IBM Tivoli Provisioning Manager 7.1 Virtualization.
QAD - Business Intelligence Platform MWUG – Presentation by Capital Safety Mike Booke – Global VP of IT Andy McDonald – Solutions Analyst.
Lessons Learned / Best Practices for Supporting Global Cloud Implementations Mike Booke 15 September, 2015.
Managing The GLOBAL Business
"View" > "Header & Footer" > "Slides" > "Date & Time FIXED" > (replace what's there) User Case Study: Data Collection System Replacement at Shield.
James Blankenship September , 2016
Evaluation of Priority Gender Equality
QAD Browses.
Virtualization Review and Discussion
Preparing for Automation: Expanding Your Coverage
Transforming business
James Blankenship March , 2017
Using Item Attributes in a Make-to-Order Environment
Performance Data Collection and Reporting (PDCR)
Speed Up QAD Requisition Creation, Routing & Approval
SAMPLE Develop a Comprehensive Competency Framework
What to Consider Before Upgrading your HCM
EOB Methodology Overview
5 Comtec: Entry Point to Reusing Services
Color-Logic Support Minimum System Requirement DFE v5.IR7.2
Chapter 25: Architecture and Product Lines
Microsoft FrontPage 2003 Illustrated Complete
M365 skills initiative / Overview
SQL Server 2012 Licensing Overview.
The Trials and Tribulations of Implementing Project Server 2003
Nancy McCrimmon – 32 Soft Inc.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
QAD Browses.
Software Quality Engineering
James Blankenship March , 2018
Critical issues in Planning, Design and Development
HC Hyper-V Module GUI Portal VPS Templates Web Console
What is user acceptance testing and how is it different than system testing Kusum daga.
Service Development at Aalto University Key Enabler for Aalto's Academic Mission Mari Svahn.
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
RTT.
Consent in action Consent management in practice
Project Management How to access the power of projects!
Leading Practice Implementation Guide
Critical issues in Planning, Design and Development
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Leading Practice Implementation Guide
Preparing for the Windows 8.1 MCSA
= x 2 = = 20 4 x 5 = = 16 4 x 4 = = 18 6 x 3 = = 12 2 x 6 = 12.
Virtual Memory: Working Sets
75 previous answer What is of 37.5? ? go to.
that focus first on areas of risk.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
75 previous answer What is of 60? ? go to.
The Home S t r e t c h.
OU BATTLECARD: JD Edwards EnterpriseOne Training and Certification
OU BATTLECARD: E-Business Suite Courses and Certifications
Presentation transcript:

QAD – PSW/MSW Add-on Install MWUG – Presentation by Capital Safety Mike Booke – Global VP of IT Natalia Salazar – IT Global Solutions Strategist

Share our installation experience Objective Share our installation experience Ensure others smooth installation of PSW Server considerations End User considerations Training Testing scenarios Questions and Answers

PSW/MSW is standard in core QAD in 2010.1EE Requirements Availability PSW/MSW is standard in core QAD in 2010.1EE Add-on available for eB2.1 thru 2011SE Requirements: Specific to eB2.1 SE Minimum .Net 2.9.1 Minimum Progress OE10.1 Allocate one CPU per planner/scheduler

Users should have previous experience with using workbenches. Requirements End Users Users should have previous experience with using workbenches. Get PSW/MSW training thru QAD. QAD training on PSW will guide you in use, not a beginning course on planning or workbench! Bug fixes may be needed, depending which QAD version you are installing add-on to.

Test environment – Cloned VM environment QAD 2009SE Install Environment Test environment – Cloned VM environment QAD 2009SE Installed .Net 2.9.4 Added 2 additional CPU’s to server If you change .Net version – consider browse and framework customizations!

Performance

Visibility to Potential Issues

Workbench training is not to be skipped Practice, Practice, Practice Key Points Workbench training is not to be skipped Practice, Practice, Practice Test real time scenarios to ensure understanding of behavior for planner Test to ensure server performance level

Implementation Success Visibility to components Clear color indicators to identify potential issues Time savings for the planners

Summary Training proved to be critical Test – Involve all departments Make users self-sufficient Support Questions?