Friday March 4th 08h32: Access for beam dump system.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ion Commissioning: Thursday & Friday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
LHC Status Tue Morning 22-Aug
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary of week 7 Hardware Commissioning:
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Thursday morning – optics correction
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
LHC Morning Meeting - G. Arduini
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Saturday 2/4/ :00-09:00 Problems with SPS:
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday Morning – recovery from cryo.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Programme for Saturday 10 July
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
LHC Status Tue Morning 22-Aug
Sat morning Until 12:40: Loss maps at injection
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Summary Tuesday h23: Machine closed. Precycle started.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Friday 15th February - morning
Tuesday – Morning and Evening
RAMP FOR COLLIMATOR SETUP
Another Immortal Fill….
Monday 10th December - morning
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Friday March 4th 08h32: Access for beam dump system. 09h10: Access finished. Beam dump tests without and with beam. Q fixed display is displaying wrong info, need to be restarted. injection prepulse was disabled for beam 1 probably during the test with RF-LBDS performed earlier this morning. Fixed by RF. FBCT is displaying really wrong values since the precycle 16h00: Start of 2-shift “quiet” beam period for observing beam dump stability (pilot bunch only, ramp OK). 16h39: Understand effect of Q feedback on chroma. 01-03-2011 LHC morning report

Tune feedback and chroma 28-2-2011 LHC startup progress

3e15 protons in? 28-2-2011 LHC startup progress

Friday March 4th 16h48: Start ramp to 3.5 TeV. Squeeze steps for beta beat correction. RQT12/13 in pt 1 for b2 were driven through the squeeze on Feb 25, but not today. Turns out, they are not in the hardware group DISP SUP QUADS where they should be... Nor for beam 1. 22h02: Lost both beams. Cryo gone for MSL4. And the undulator. RU.L4 QPS_OK lost. 00h09: Waiting for CMS to solve issue with one of their detectors. Continue as advised by CMS… 00h36: Sequence unclear - PREPARE OFB FOR RAMP subs are skipped. Tried to execute but failed. Continue. 01-03-2011 LHC morning report

Saturday March 5th 00h46: Start ramp to 3.5 TeV. Squeeze to 3.5 m. 03h06: Lost beams. Two RQT circuits tripped (RQTD.A12B2 and RQTD.A67B2). Tune feedback tries to correct for tune shift after AC dipole kick. RQT trips as result. 04h01: Injection. Rearming the LBDS for B2 with sequencer  dump with PM In contact with F. Castronuovo and E. Carlier 04h41: Dump problem solved. 01-03-2011 LHC morning report

Saturday March 5th 05h09: Controller problem DQAMG_4.RQTL11.R2B1. Call QPS piquet. 06h36: QPS problem solved. Injection. Ramp. Squeeze. Beta beat team still here after 16h and N nights before… Most done (local beta correction b1&b2, global b1, coupling) and verified, except B2 global correction at 1.5m and beta* correction. Finalization ongoing (B2 global correction) Beta* probably only later. 01-03-2011 LHC morning report

Ahead Sat 09:00 review dump status in 9am meeting. If OK: Sat 09:30 inject and ramp 1 nominal bunch to 3.5 TeV (no squeeze)               Orbit correction Check RF blow-up  Check beam (tune, coupling, chroma) Octupole check Sat 16:00 Injection & dump protection at 450 GeV Sun 01:00 Loss maps at 450 GeV for collimation and protection Sun 07:00 inject and ramp 1 nominal bunch to 3.5 TeV (no squeeze)   Establish final reference (Joerg will be in)   Collimation setup at 3.5 TeV Sun 18:00 MPS checks at 450 GeV Mon 00:00 Transverse damper setup at 450 GeV (Daniel Valuch et al) Mon 08:00 Injection & dump protection Mon 16:00 Collimation setup at 3.5 TeV 01-03-2011 LHC morning report

Dump OK for nominal bunch at 3.5 TeV? Discussion… 28-2-2011 LHC startup progress