SW 6th Ave. – Fairlawn to Gage

Slides:



Advertisements
Similar presentations
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Advertisements

Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
Examples of Context Sensitive Solutions in an Urban Environment ITD Project Development Conference April 7, 2005 Doug Camenisch, P.E. Parametrix.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Golden Triangle Blvd. Progress Report March 27, 2007.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
I-15/LOS ALAMOS ROAD OVERCROSSING City Council Meeting January 17, 2012.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Phase 2: 30% Design Plans September 4 th, 2012.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
STA Safety Project PID #76439 December 12, 2006.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
Tracy Lovell, PE HSIP PROJECT PROCESS. HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Traffic Signs Part Two. What do these 2 signs tell you?
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
City of Belmont Pavement Reconstruction Project October 15, 2014.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Pioneer Road Relocation and Reconstruction Project
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
The Gainesville Area Chamber Infrastructure Investment Initiative
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
General Road Construction Information
Col. Pike Multimodal: About the Project
UTILITY DESIGN SERVICES
Location Map.
District 3 Complete Streets Projects
DICKINSON AVENUE RECONSTRUCTION
Waltham Road (Andover – North Star).
Public Information Meeting NW 100th Street Reconstruction Project
SW 6th Ave. Fairlawn to Gage
Transportation Projects
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
Project Scope of Work Project Contacts
Engelhorn/danmor apts 410 West 3rd Avenue
CH 42 & TH 13 Construction Update
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Coffee & Construction Developer Meeting
1200 West Widening and Reconstruction Project
Contract 60X10 Informational Meeting Weber I-55
Forest Glen Retail Survey
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
1700 South Widening and Reconstruction Project
Walker Street Reconstruction Project 25% Design Public Hearing
Sprague Avenue Phase II Survey Results and Next Steps
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
2019 Capital Program Title of Presentation
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

SW 6th Ave. – Fairlawn to Gage Roadway improvements with asphalt pavement, curb & gutter, and 5’ sidewalk & 10’ side-path with storm sewer, which will eliminate most ditches Roadway widening from 2-lanes to 3-lanes (2 thru lanes with a turning lane) Pedestrian crossing with flasher to be installed at 6th & Westchester Rd. Pedestrian crossing installed at Chalet Apartments with bus stops Trafficway improvement funded by a General Obligation Bond issue Utility relocation beginning in the Spring of 2017 Project Contacts: City of Topeka Jeff Hunt, P.E. 785.368.3842 Brian Faust, P.E. 785.368.3842 Brian Armstrong, P.E. 785.272.2252 Bartlett & West Jeff Lolley, P.E. 785.272.2252

Construction – 2017 & 2018 2017 Proposed Construction Phase I – 6th Ave. closed from Schendel east to Westchester Rd. Phase II – 6th Ave. closed from Fairlawn to Schendel Estimated timeframe – 6 months 2018 Proposed Construction Phase III – 6th Ave. closed from Westchester Rd. east to Chalet Apartments Phase IV – 6th Ave. closed from Chalet Apts. to Gage Estimated timeframe – 8 months