ENGINEERING DESIGN OF RF STRUCTURES

Slides:



Advertisements
Similar presentations
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Advertisements

Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Addition Facts
TD18 – post mortem analysis Inspection 11WDSDVG1KEK SLAC.
Squares and Square Root WALK. Solve each problem REVIEW:
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
ENGINEERING DESIGN AND PRODUCTION OF X-BAND RF COMPONENTS Germana Riddone, CERN, Geneva, Switzerland Maria Filippova, I. Syratchev, Anastasiya Solodko,
CLIC RF structure master schedule and CERN production
Vasim Khan X-Band RF Structures, Beam Dynamics and Sources Workshop, Cockcroft Institute /21 CLIC_DDS_HPA study
Vasim Khan X-Band RF Structures, Beam Dynamics and Sources Workshop, Cockcroft Institute /24 CLIC_DDS study
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
30 GHz waveguide line modification towards 12 GHz.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Investigation threads on fabrication technologies for the CLIC X-band Accelerating Structures C. Rossi on behalf of the CLIC X-band Activity Thanks for.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
CLIC RF structure development meeting Structure cost study (introduction) G. Riddone,
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Update of master schedule and report from SLAC G. Riddone
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
5 th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1.
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
WP 9.2 DDS Status, R.M. Jones, 25 th Oct 2010, WebEx Phone-in, Geneva 1 WP 9.2: DDS Status Roger M. Jones Cockcroft Institute and The University of Manchester.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
CLIC meeting CLIC module status G. Riddone on behalf of the CLIC Module WG,
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 CEA SACLAY CLIC R&D Activities F. Peauger, A. Hamdi, M. Desmons, W. Farabolini, P. Girardot.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Status of CIEMAT work on PETS
LCWS11 WG4 Fully featured accelerating structure engineering design
Update on the DB Girders FE Analyses
Manipulating RF phase and amplitude at high power level.
CLIC_DDS study
Summary of the test structure design
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
Presentation transcript:

ENGINEERING DESIGN OF RF STRUCTURES 4th Annual X-band Structure Collaboration Meeting. 3-5 May 2010, CERN ENGINEERING DESIGN OF RF STRUCTURES A. Samoshkin (JINR, Dubna), 04 May 2010

CONTENTS ACCELERATING STRUCTURES ( AS ) TEST STRUCTURES BASELINE (Disks Sealed) ALTERNATIVES (Quadrants) FUNDAMENTAL CLIC STRUCTURES CLEX TWO BEAM TEST STAND CLEX TEST MODULES POWER EXTRACTION STRUCTURES ( PETS ) CLIC TWO BEAM TEST STAND (TBTS) CLIC TEST MODULES

SUMMARY ON TEST STRUCTURES CONFIGURATIONS - BASELINE OPTION * SEE SLIDE 8

BASELINE TEST AS ( DISKS, SEALED ) XXXXXXXXXXXXXXXXX Gaps: MIN=0.005 mm, MAX=0.0125mm Assembly Ref. B ( Ø EXT ±0.0025 ) Interlocking for Disks positioning Asymmetric Disks with Interlocking, WG Damping, Sealed, Bonded, Push-Pull Tuning Coupler design (assembly problem)  tolerances are under revision

TOLERANCES Due to tough beam position demand the RF shape of structure requires: - tolerances & shape accuracy of 5µm; - surface roughness of 25 nm The diffusion bonding procedure requires a good flatness of contact surfaces (1µm) To provide the needed disks concentricity while assembling the ext. Ø tolerance must be ± 2.5 µm

ALTERNATIVE DESIGN OF THE DISKS SYMMETRIC DISK DESIGN HIP-CERN COLLABORATION Future design of Detuned Damped Structure (DDS) in collaboration with University of Manchester. (also part of EUCARD WP9.2) DISK 2 TUNING STUD PUSH - PULL DISK 1 RADIAL CHOKE DAMPING TSINGHUA UNIVERSITY-CERN

ALTERNATIVE AS DESIGN DAMPED & NON DAMPED QUADRANTS (ALTERNATIVE) FUTURE TESTS (ALTERNATIVE) – HALVES & DOUBLE LENGTH QUADRANTS DAMPED & NON DAMPED QUADRANTS (ALTERNATIVE) 11WNSQVG1 11WDSQVG1 11.424 GHZ, 18 cells, damped, tank, quadrants, push-only tuning 18 cells, non-damped, tank, quadrants, push-only tuning

DESIGN OF WAKEFIELD MONITORS PSI-XFEL X-band structure PSI-ST-CERN DEVELOPMENT CEA-CERN COLLABORATION For CERN TBTS (phase 2) FEEDTHROUGH COOLING BLOCK AS DISK

PSI-XFEL X-BAND STRUCTURE 11.994 GHZ, 73 cells, non-damped, sealed, disks Ø65mm, push-pull tuning COOLING BLOCK WITZENMANN FLEXIBLE HOSE LEGRIS CONNECTOR VACUUM FLANGES WFM CELLS ( 36-45, 63-72 ) FEEDTHROUGH

S T PARAMETER-BASED MECH. DESIGN EDMS, CDD, MTF 3D PART ASSEMBLY RF INPUT 3D PART GENERATED 3D PARTS ARCHIVING S T SmarTeam EDMS, CDD, MTF ASSEMBLY DESIGN FEEDBACK FROM INDUSTRY ASSEMBLY RF CHECK

TECHNICAL DRAWINGS Project Structure

TECHNICAL DOCUMENTATION MANAGEMENT CERN Engineering & Equipment Data Management System Drawings are stored in SmarTeam db, which is linked to CERN Drawing Directory (CDD) & Equipment Management System (MTF) Follow-up of each manufactured component

DESIGNED AS IN DISKS Tank  Sealed Vac. Brazing  H2 Diffusion Bonding 11.424 & 11.994 GHz, 24 cells, damped, tank, disks Ø80mm, push only tuning 11/12WDSDVG1.8T (TD24) 11.424, 18 cells, damped, tank, disks Ø80mm, push only tuning 11/12WDSDVG1 T (TD18) 11.424 & 11.994 GHz, 24 cells, non-damped, sealed, disks Ø80mm, push only tuning 11/12WNSDVG1.8 S (T24) 11.424 GHz, 18 cells, non-damped, tank, disks Ø80mm, push only tuning 11/12WNSDVG1 T (T18) Tank  Sealed Vac. Brazing  H2 Diffusion Bonding

DESIGNED AS IN DISKS 11/12WDSDVG1.8S (TD24) 11/12WNSDVG1.8 T (T24) 11.994 GHZ, 73 cells, non-damped, sealed, disks Ø65mm, push-pull tuning CLIAPSI 11.424, 24 cells, non-damped, sealed (tank), disks Ø45mm, push only tuning 11WNSDVG1.8 VB (T24) 11.424 & 11.994 GHz, 24 cells, damped, sealed, disks Ø80mm, push only tuning 11/12WDSDVG1.8S (TD24) 11.424 & 11.994 GHz, 24 cells, non-damped, tank, disks Ø80mm, push only tuning 11/12WNSDVG1.8 T (T24)

DESIGNED AS IN DISKS FUNDAMENTAL STRUCTURES CD10 C10 11.424, 10 cells, damped, sealed, disks Ø80mm, push-pull tuning CD10 11.424 GHz, 10 cells, non-damped, sealed, disks Ø45mm, push-pull tuning C10 11.424 & 11.994 GHz, 24 cells, damped, sealed, disks Ø74mm, push-pull tuning 11/12WDSDVG1.8 KS (TD24) 11.424 & 11.994 GHz, 24 cells, non-damped, sealed, disks Ø45mm, push-pull tuning 11/12WNSDVG1.8 KS (T24) FUNDAMENTAL STRUCTURES

CLEX 2BTS ( RF BEAM ) STEPS TOWARDS CLIC MODULE DESIGN TBTS, Phase 2.2 COOLING CIRCUIT COOLING BAR WFM 12WDSDVG1.8T TBTS, Phase 2.2 CLEX Modules  evolution based on this design STEPS TOWARDS CLIC MODULE DESIGN TD24 with WFM (CEA-CERN)

AS FOR PROTOTYPE MODULES ( LAB, NO RF ) COOLING CIRCUIT RF DISTRIBUTION LOADS CONNECTION DAMPING MATERIAL VACUUM MANIFOLD STEPS TOWARDS CLIC MODULE DESIGN Validation of Technical Systems Integration

AS FOR CLIC MODULES STEPS TOWARDS CLIC MODULE DESIGN WG FROM PETS WFM VAC MANIFOLD WG FROM PETS RF SPLITTER WITH CMF LOADS SPLITTER A S COOLING

AS FOR CLIC MODULES STEPS TOWARDS CLIC MODULE DESIGN HIGH – POWER LOAD HIGH ORDER MODE DAMPING  PETS - AS RF NETWORK 

CU-OFE octal prism with slots PETS PETS with damping material COUPLER MINI-TANK SiC BAR DAMPING BAR FIXATION PETS OCTANT PETS octants assembly S1=212838.222 mm2 PETS mockup for test module in the lab CU-OFE octal prism with slots The internal surface area calculation was done with CATIA Engineering optimizer module. S2=209235.153 mm2

PETS Structure (8 octants) with “compact” couplers, Vacuum “Mini-tank”, “On-off” mechanism ( t «off»  20 ms ) Cooling circuits (size for 0.5% beam loss, couplers water-cooled, bars cooled by conduction) PETS for CLIC COMPACT COUPLER WITH ON-OFF MECHANISM VACUUM MANIFOLD VACUUM MINI-TANK PETS OCTANTS PETS prototype is currently under production by CIEMAT. (EUCARD WP9.2)

PETS ON-OFF MECHANISM COOLING INLET TO ACC. STRUCTURE OUTLET ACTUATOR COOLING CHANNEL REFLECTOR COMPACT COUPLER PISTON Assembly of PETS “On-Off” mechanism combined with compact coupler

CONCLUSIONS Engineering design is a challenging task. The requirements from different technical systems (RF, vacuum, cooling, etc) have to be taken into account during design & integration. The alignment and stabilization issues have to be considered as well for CLEX structures Next milestones: TD24 R05 with SiC, CLIC DDS & PETS “On-Off” unit Collaboration with KEK, SLAC, PSI, CEA, HIP, CIEMAT and many other Institutes is very fruitful.

REFERENCES Used materials: «SLAC Work Status for the CLIC High Gradient Accelerator Structure R&D», J. Wang, CLIC09 Workshop «CERN production methods», G. Riddone, CLIC09 Workshop «Mechanical design of PSI-XFEL X-band structure», D. Gudkov, June 2009, CLIC RF Structure Development Meeting. «Module Integration Issues», A. Samoshkin, CLIC09 Workshop Thanks to: Claude Achard Said Atieh Alexej Grudiev Dmitry Gudkov Serge Lebet Risto Nousiainen Germana Riddone Anastasiya Solodko Igor Syratchev Juwen Wang Riccardo Zennaro … and many others

THANKS FOR YOUR ATTENTION !