Vanderbilt Emergency Department Renovation Project

Slides:



Advertisements
Similar presentations
Order Entry in the Emergency Room SCM. Standard order session Orders are to be done in the ECC and are assumed to be STAT.
Advertisements

Provincial Hospital Resource System How to update Resource Boards in the PHRS.
January 6. January 7 January 8 January 9 January 10.
Columbia River General Hospital “Community Commitment” Reorganization Plan.
1 Board of Supervisors Update April 3, 2012 Inova Loudoun Hospital.
EMERGENCY ROOM OF THE FUTURE Group 3 Chung-Lun Kua, Brandon Thompson, Sue Bhat September 23, 2008  Hallway Beds  Ambulance Diversion  Records Management.
Campus signage – Internal
The call The happy years The awakening Work to do Michelle Bushey, RN, BS, BSN, CIC Director Infection Prevention and Patient Safety.
Adult Hospital at Home Service Sue Gibbs 27 th March 2014.
Texas Heart Institute ® ® The Texas Heart Institute at St. Luke's Episcopal Hospital – The Denton A. Cooley Building The Cooley Building has 327,000 square.
PRINCE WILLIAM COUNTY PUBLIC SCHOOLS. SCHOOL DIVISION WIDE ENROLLMENT FORECAST CURRENT SCHOOL CAPACITY568 Students FORECAST ENROLLMENTDEFICIT 2007 School.
Central Receiving Center (CRC) System of Care Donna P. Wyche, MS, CAP Manager, Mental Health and Homeless Issues Division Orange County Family Services.
Calculating & Reporting Healthcare Statistics
PROJECT DETAILS A rea, 6,75,000 sq. ft. Completed, 1996 Largest corporate hospital in India Fourth largest in the world –652 beds including 138 ICU beds.
JULY 8 TH 2014, “A DAY DISRUPTED”. DEACONESS OVERVIEW Approximately a 380 bed hospital Level III Trauma Center Stroke Accredited from JC and Washington.
Facility Space Planning for Emergency Department Using Simulation Analysis SHS Conference February 2004 Lillian Miller.
August 22, 2015 Non Emergency Medical Transportation Program Update September 23, 2014.
Surge Capacity Plan EMERGENCY DEPARTMENT.  Surge capacity strategies will be implemented when volume exceeds staffing and/or treatment space POLICY:
Emergency Department Design By Idrees Iwaidat Idrees Iwaidat Al-Ahli Hospital.
LOS ANGELES COUNTY DEPARTMENT OF HEALTH SERVICES Harbor Master Plan Meeting June 22, 2011.
Tenement Housing 1800’s. Crowded Street Dumbbell Tenement was the most popular.
Healthcare of the Future: EMT Problem Statements Jenny Liu, ECE Jelece Morris, HSI David Woods, Arch Erxi Liu, Arch Fall 2012.
Northwest ISD Lakeview Elementary School Additions and Renovations Lakeview Elementary School Additions and Renovations
Leadership Development Institute IX February 15 and 16, 2007.
Лектор проф. Искандарова Г.Т. COMMUNAL AND LABOUR HYGIENE DEPARTMENT LECTURE ON ENVIRONMENTAL SANITATION FOR THE 5TH YEAR HYGIENIC REQUIREMENTS FOR DESIGN,
Instructions for Completing the S&R Data Collection Form October 2008.
“Community Commitment” Reorganization Plan. Reorganization Factors Industry-wide over-bedding crisis – Fewer hospitalizations – Persistent pressure from.
Modernization Project Identify Priorities – Patient Safety Quality of Care Efficiency Discover Opportunities - Existing Hospital Garner Regulatory Support.
Lego Brainwaves Design of Pediatric Health Center of the Future Team Lego Randeep Youngseon Choi Lavanavarjit.
East Texas Medical Center Crockett. Caring for our Region 15 hospitals 50 clinics Regional home health network Regional EMS coverage (also Waco and Pasadena,
PHV Patients in the ED The processes of transferring patients to and from the ED and Vanderbilt’s Psychiatric Hospital (PHV) can be very confusing. This.
Briefing to the Select Committee on Women, Children and Persons with Disabilities Department of Health, Limpopo 27 th February
ACUTE-CRISIS PSYCHIATRIC SERVICES DEVELOPMENT INITIATIVE DC Hospital Association Department of Mental Health June 30, 2004.
Symposium sponsors:  Mount Sinai Department of Emergency Medicine  Emergency Medicine Associates (EMA)
1 Presentation on Reconfiguration of Hospital Services from Dr Dominic O’Brannagain & Dr Colm Quigley to Regional Health Forum – Dublin North East 25 th.
Watch University Grow On May 16, legislators, community leaders and the medical community gathered for University Health Care System's groundbreaking ceremony.
1 Eric Weiskopf, M.Ed – OHITT Ellen Flink – OHITT Session 13 – March 27, 2013.
ED Stream Workshop Acute MOC
ED Stream Workshop Acute MOC August 2013 ED Stream Workshop 1.
Kern County Hospital ED Status Appropriate Use of EMS Department On-call Personnel.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
We Are Mendota OSF Saint Paul Medical Center April 1, 2015.
Common Problems in the Emergency Department Intern Survival Kit 2013 The Northern Hospital Dr. Phyllis Fu Emergency Physician.
ED Stream Workshop Acute MOC – Manning August 2013 ED Stream Workshop 1.
UNIVERSITY MEDICAL CENTER OVERVIEW New Orleans City Council Community Development Committee Presentation by Gregory C. Feirn CEO, LCMC Health July 15,
Planning Facilities for Flexibility. Planning Facilities for Flexibility l 2 What is… FLEXIBILITY The Ability to Expand or Adapt.
VERTICAL UNIT Emergency Department Case Studies. Objective Answer the following questions: –“What is a Vertical Unit?” –“Why did we implement?” –“How.
Mel Pickup, Chief Executive Warrington & Halton Hospitals NHS FT Andy Davies, Accountable Officer Warrington Clinical Commissioning Group Achieving the.
The New Echuca Hospital October 2011 Update
Welcome to ED Orientation
Water Works.
Code Stroke Code Stroke: Medical Directive (PCS-MD-25) ETA: 13 minutes.
Highland Rescue Team Ambulance District
Dr Chris Schofield Clinical Lead Liaison and CRHT
CITIZENS BLUE RIBBON COMMITTEE
DCHFT Emergency Department Update
Primary Care Expansion Enhance Urgent Medical Advice
Arkansas Children’s Hospital
Unity PES Care Model Session 2, November 20, 2015.
Evaluating Effectiveness of a Chair Unit in a Tertiary Academic Medical Center Yash Chathampally MD, MS.
Severity of incidents by care setting, April 2006 to March 2007
Penn Medicine Chester County Hospital
2018–2019 Updates to Care Transitions
Northwest Hospital Childbirth Center Planning
Emergency Operations Centre
Dorminy Medical Center
PROACT-4 Trial design: Patients enroute to the hospital with acute chest pain were randomized to point of care troponin testing (n = 305) vs. usual care.
We think of our mission as the seat of a three-legged stool.
Delayed transfers of care | Overview
Pediatric Surge Crisis Standards of Care
Presentation transcript:

Vanderbilt Emergency Department Renovation Project Starting December 2003 Completion April 2005 The Vanderbilt Emergency Department is getting a much needed renovation to be completed in February or March, 2005.

What’s Changed C1 - C8 = 8 beds T1-T3 = 3 beds E1-E8 = 8 beds M1-M5 = 5 beds FT 1-3 = 3 beds Total Beds = 27 + 2 Respond Rooms 16,400 Square Feet Treatment Rooms = 16 beds Trauma Rooms = 4 beds Observation = 7 beds Fast Track = 4 beds Swing = 4 beds Chest Pain/Stroke = 10 beds Total Beds = 45 + 8 Respond Rooms in TVC + Additional 40 slice CT 33,900 Square Feet The current ED has 27 treatment spaces in 16,400 square feet. Psychiatric care space is provided in 2 rooms, called RESPOND rooms. The new ED will essentially double the size of the ED to 45 treatment spaces in 33,900 square feet. Medically cleared psych patients will await disposition in the psych holding area located in the Vanderbilt Clinic outside of the Emergency Department.

The new Emergency Department will fill the space between the current emergency department and the Vanderbilt Clinic. The single floor structure will be structurally sound in order to build a 10 story patient care tower during a future construction project.

A separate ambulance entrance will be located in the acute area of the department. Walk in patients will enter between the acute and non-acute wings of the department.

Ambulances back in from 22nd Avenue Ambulance traffic is rerouted in the new plan. Ambulances will arrive via 22nd avenue and back into unloading areas at the acute wing of the department.

Psychiatric Transition Unit EXPANDED ED Medically cleared psych patients will not continue to occupy ED treatment spaces while awaiting disposition. Instead, they will be relocated to the Vanderbilt Clinic space vacated by the move of the Peds ED to Vanderbilt Children’s Hospital. PSYCH 22ND AVENUE N