QS, MEASUREMENT, DOCUMENTATION, SMM

Slides:



Advertisements
Similar presentations
PRESENTATION ON TURNKEY CONSTRUCTION.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
CONTRACT COSTING Contract costing is that form specific order costing which applies where the work is undertaken according to customer’s requirements and.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
NEC - Engineering and Construction Contract (ECC)
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Defensible IEPs Douglas County School District 1 Module V: Documentation and Timelines.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
MALAYSIAN STANDARD METHODS OF MEASUREMENT FOR CIVIL ENGINEERING WORKS
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
EM15 – Contractors COST MANAGEMENT
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
Construction Specifications
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Construction Contracts and Project Delivery Methods
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Specification & Quantities Estimating
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Can you afford NOT to have a QS managing your construction budget?
Head Office Hannay House 39 Clarendon Road Watford Hertfordshire WD17 1JA UK Telephone: +44 (0) Facsimile: +44 (0)
Chapter 13 Estimates for Remodeling Work
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
The Nigerian Institute of Quantity Surveyors PRICING TENDER DOCUMENT BASED ON BESMM4 By Dr. GANIYU AMUDA YUSUF (FNIQS, RQS) Department of Quantity Surveying.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Amendments to the Public Works Contracts
Minimum Set of Requirements for Suppliers
Roles and responsibilities PM
The Design Team Carl James.
Minimum Set of Requirements for Suppliers
Profession Practices (ECIV-5105)
Technical Specifications & Employer's Requirements
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Particular Conditions of Contract & Appendix to Tender
Financial Clauses and Procedures.
Drawings Introduction to FIDIC - Drawings -.
Estimating Project Costs
Costing and Project Evaluation
Contractor’s Post-contract Cost Management Processes
(Additional materials)
Particular Conditions of Contract & Appendix to Tender
Temporary Works Co-ordination
COST PLANNING AND ESTIMATION
COST PLANNING AND ESTIMATION
Project Development and Managing your Build Agenda
Quality Management Systems – Requirements
Pre-contract Planning and Practice
Introduction to building contract
Engineering Project Tendering.
ARCH 435 PROJECT MANAGEMENT
Dennis Li - HKCIC Lecturer
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

QS, MEASUREMENT, DOCUMENTATION, SMM Prepared by: Ms. Noorhidayah Sunarti School of Quantity Surveying & Construction Management

Contents: General QS services Measurement process Attributes of QS Traditional preparation of BQ Modern preparation of BQ Standard Methods of Measurement

QS Services In general; QS offers its clients (developer/owner, consultant, contractor or sub contractor) a wide range of professional services in the areas of project/ construction management, quantity surveying, cost/ contract /claim/ planning solutions according to their requirements in a most cost effective and efficient manner. QS  is managed by a group of highly qualified and experienced professionals providing Project management, Construction Cost Consultancy, Estimation,  Quantity Take-off, Construction Cost Databases, Specification and Construction Material  Databases etc.

The Measurement Process / Quantity Take-off The main purpose measurement process is to produce quantity for the measured works to prepare for Bills of Quantities. A Bill of Quantities is prepared for tendering purposes. Using BQ, contractor is able to price the work with a minimum effort. The quantification of the work is done either by the main contractor, subcontractor, or package contractor.

Attributes of a Quantity Surveyor Ability to describe clearly, fully and precisely the requirements of the designers and arrange the Bills of Quantities. ?????? The contractor’s estimator can quickly, easily and accurately arrive at the estimated cost of the work.

Attributes of a Quantity Surveyor How to achieve this ? Ability to describe clearly, fully and precisely the requirements of the designers and arrange the Bills of Quantities. The surveyor must be: careful and accurate in making calculations having systematic and orderly mind be able to visualize the drawings and details

Divisions of bill preparation Traditionally, the preparation of BQ divides into 2 distinct stages: 1. The measurement of the dimensions and the compilation of the descriptions from the drawings and specification. This process commonly known as taking-off . 2. The preparation of the bill. This involves the calculation of volumes, areas, etc (squaring the dimensions). Then followed by entering the descriptions and the squared dimensions on the an abstract sheet (abstracting) to collect similar items together and present them in recognized bill order. From this abstract, the draft bill was written (billing).

Development of bill preparation The utilization of computerized system is become more integrated for direct input of quantities sand formulation of descriptions through the use of standard libraries of descriptions, and the lengthy collating and the bill preparation processes is carried out automatically. WinQs CatoPro MasterBill QS Elite Snape Vector, etc

TOPIC: Measurement & Bills of Quantity Prepared by: Ms Noorhidayah Sunarti 012-6254776 daia0310@yahoo.com

The Measurement Process / Quantity Take-off The main purpose measurement process is to produce quantity for the measured works to prepare for Bills of Quantities. A Bill of Quantities is prepared for tendering purposes (selection process to contract an eligible contractor for the project). Using BQ, contractor is able to price the work with a minimum effort. The quantification of the work / measurement / taking-off is done either by the QS consultant (Client), QS of main contractor or subcontractor or Estimator.

The Measurement of Quantities for Building Works Main objective: To produce the document for the list of quantities (bills of quantity). The quantities meaning the estimated amount of building works / trade works for specific building elements. The quantities needed to ensure the exact amount of trade works in completing the building / project. The measurement is based on the principles and rules of measurement set up in manual of STANDARD METHODS OF MEASUREMENT FOR BUILDING WORKS.

Standard Methods of Measurement (SMM) Function: To standardize the method of preparing the measurement for building works and civil engineering works. Contains of rules and principles of measurement. Malaysian Standard Methods of Measurement for Building works. (SMM2) – Institution of Surveyors Malaysia (ISM) (adapted from SMM by RICS(UK) Malaysian Standard Method of Measurement for civil engineering works (CESMM) – CIDB (adapted from CESMM by ICE / FCEC(UK)

Standard Methods of Measurement for Building Works (SMM) Set out rules for the measurement and description of building works. SMM2 is a document that provides not only a uniform basis for measuring building work but also embodies the essentials of good practice. Without using it, a set of rules the quality of BQ can vary widely.

Malaysian Standard Method of Measurement for Civil Engineering Works (CESMM) To be used in conjunction with the Conditions Of Contract for Civil Engineering Works. Does not deal with the preparation of BQ for mechanical & electrical engineering work, building work or work which is seldom encountered in civil engineering contracts. If any such work to be included in the contract, such work shall be measured in accordance with their respective SMM and shall be stated in the Preambles to the BQ.

The Bills of Quantities The Bills of quantity prepared by Quantity Surveyor based on measurement from the construction drawings / building plans and specification prepared by the designers/ engineers. This document were itemized all the quantities for each categories of works applied in constructing the buildings. E.g. building works, mechanical, electrical works, civil, structural works, infrastructure works, etc. The contractor will priced /estimate all the works associated in completing the buildings during pre-construction stage.

The Bills of Quantities BQ is part of legal tender / contract document which will be used to bind the agreement between the client and the contractor in terms of: Detailed of construction works to be done on-site – building works, infrastructure works, building services works, water & sewerage systems, etc. The materials used – standard / quality The standard workmanship /construction methods, The needs / requirements of the builders on-site in implementing the jobs on–site – e.g. temporary offices, storage, shelter / hostel for workers

Advantages of using BQ According to Seeley (1997), Avoids the need of for all of the tendering contractors to measure the quantities of work themselves before preparing an estimate. (if yes, wasteful duplication of efforts and an increase in Contractor’s overhead). BQ prepared in accordance to SMM ensure that an adequate description of work in a recognized format is given to all tendering Contractors and all tender on the same basis. The detailed breakdown of the contract sum (in BQ format) permits proper financial management of the contract.

Disadvantages of using BQ The absence of BQ leads to greater variability, increase risk in estimating and consequently more disputes.

The binding parties of a Contract Client: has intention to build building- developer, owner, funder, etc. Contractor: a person / company who has expertise & experience to build building / infrastructure works, water and sewerage system and install the building services- electrical, mechanical.

Basic contents of typical contract documents Conditions of contract Contract drawings Specification Preambles Bills of quantities Schedule of rates

Purpose / Objectives / Roles Project stages Explanation PRE- CONTRACT (before official contract signed between client – contractor) Tendering stage To enable the contractor to tender to a project & price the described works. To control in ordering materials and assessing the labour requirement for the contract. POST-CONTRACT (contract signed and the selected contractor started their works till completion stage) Construction stage Provides basis for valuation of variation work and adjustments for the final account. Provides basis for valuation of monthly progress payment referring to the working progress on site. Project completed After being priced, it provides a good basis for cost analysis which subsequently will be used in future contract especially for cost planning works. (cost data)

Types of Bill of Quantity similarities differences Fixed price/ lump sum The architects and engineers prepare detail construction drawings. QS measures the quantities in detail based on the construction drawing The QS prepare BQ based on the measurement. Virtual completion of the design proceeds the signing of the contract. Both the quantities and unit rates form part of the contract A detail breakdown of all the quantities is shown in the BQ The empty bill is supplied to the contractors to tender / price the described works/ project. Approximate The QS prepares BQ but subjected to later adjustment. Only unit rates form part of the contract. The signing of the contract and beginning of the project may proceed before the whole design is complete. Drawings and specification The contractors are supplied with drawings with full specifications. No empty bill is supplied to the contractors. The contractors prepare their own BQ. Suitable for small project (less than RM500,000)

Basic contents of Bills of Quantities Preliminaries Specifications of materials and workmanship Preambles (only in Bill of Approx Qtty) Measured works bill Schedules of rates (only in Bill of Approx Qtty)

Preliminaries It must: Contain a definition of the scope of works and details of the proposed form of contract / project. Contain a detailed description of the administrative mechanism / temporary facilities to implement the contract / project. Contain list of drawings and any special instructions to the contractor – highlighting the method of pricing and presenting tenders and other site information.

Specification A concise description of materials and workmanship, standard or quality of workmanship. It must convey the architect and engineer’s requirements.

Measured works Includes detailed descriptions of building, mechanical and electrical works presented in accordance with SMM. This enables the contractors’ estimator / QS to price individual item of work. This section also includes Prime cost sum (P.C) and Provisional sum (Prov. sum) P.C. sum – used for works to be carried out by nominated sub-contractors, statutory authorities or for goods to be supplied by nominated suppliers. Prov. Sum - used for works which cannot be fully detailed or for costs which are unknown at the time bills are prepared.

Preambles Define the rules governing the method of measurement of the works and contain instruction as to what is to be included within unit rates and/or lump sum prices. The preambles do not define the scope of works.

Schedule of Rates Consists of unit of works that are grouped according to trade and work content and are presented in tubular form. Each table is referred as ‘schedule’. The schedule of rates comprises a number of schedules that when combined, cover all items of work likely to be encountered in the contract.

Divisions of bill preparation Traditionally, the preparation of BQ divides into 2 distinct stages: 1. The measurement of the dimensions and the compilation of the descriptions from the drawings and specification. This process commonly known as taking-off . 2. The preparation of the bill. This involves the calculation of volumes, areas, etc (squaring the dimensions). Then followed by entering the descriptions and the squared dimensions on the an abstract sheet (abstracting) to collect similar items together and present them in recognized bill order. From this abstract, the draft bill was written (billing).

Traditional Techniques of BQ preparation Process Description of works Measuring / taking-off QS will analyze the drawings / plan received from engineers’ / architect. Prepare query list (if necessary) Measuring from drawings and entering the dimensions on to specially ruled dimension paper Working up / squaring Calculating and totaling the area, length, volume, numbers, item of the dimensions to obtain the exact quantities for each measured item in the dimension sheet. Transfer to abstract sheet Collecting the totals form dimension paper on to an abstract to produce a final total for each individual description. Billing Reproducing the items from the abstract on to bill paper in draft form ready for typing.

Preparation of billing item description Qty unit rate amount 1.0 Supply to site 125mm x 125mm pressure treated timber piles of 6m lengths with provisions of galvanized mild steel anti split rail at both ends. 320 NR RM100.00 RM32,000.00 2.0 Drive 125mm x 125mm timber piles to required depth 1,920 M RM12.00 RM23,040.00 3.0 100mm thick Grade 15 lean concrete. 115 M2 RM18.00 RM2,070.00 4.0 Grade 35 concrete at brick retaining wall 8 M3 RM180.00 RM1,440.00 5.0 Bringing to and removing from site all plant required for this section of the work ITEM RM1,800.00

Development of bill preparation The utilization of computerized system is become more integrated for direct input of quantities sand formulation of descriptions through the use of standard libraries of descriptions, and the lengthy collating and the bill preparation processes is carried out automatically. WinQs CatoPro MasterBill QS Elite Snape Vector, etc

SETTING DOWN DIMENSION Prepared by: Ms Noorhidayah Sunarti 012-6254776 daia0310@yahoo.com

Dimension Paper Dimension are taken / measure from the drawings by the taker-off. Column 1 = timesing / dotting on column (where multiplication and addition of the dimensions can be recorded) Column 2 = dimension column (in which the measurements are set down as taken from drawings and normally expressed in two decimal point. Column 3 = squaring column (in which are set out the calculated volumes, areas, etc) Column 4 = description column (in which is written the description of the work to which the dimensions apply. Column 5 = Waste (in which preliminary calculations / sketches are made/ shown) 1 2 3 4 5

Units of Measurement Cubic measurement = m3 Square or superficial measurement = m2 Linear measurement = m Enumerated items – Nr/ Nos. Items

Expressions of Measurement / Rules in setting down the dimension The dimension are normally expressed to two decimal points. It is important that the insertion of the horizontal lines which determines whether the dimension is intended as linear, superficial, or cubic measurement.

Rules in setting down the dimension: Timesing

Rules in setting down the dimension: Dotting-on

Rules in setting down the dimension: Alterations in dimensions Reminder: Deletions with correcting fluid are not encourage. It is best to nil entirely and write out again the dimensions.

Rules in setting down the dimension: Anding-on Note: Anding-on , deductions shall be in similar form of dimension.

Rules in setting down the dimension: Deductions Where a deduction is to be made, the description is preceded by Deduct which is often abbreviated to Ddt. An example as follows: