Mark 6 VLBI Data System Alan Whitney Roger Cappallo Chet Ruszczyk Jason SooHoo MIT Haystack Observatory 11 Oct 2013 2 nd International VLBI Technical Jeju,

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 4 Computing Platforms.
Advertisements

Making the System Operational
1 DDS Xpress Digital Data Storage Solution. 2 Long-term Goal Legacy Telecoms switches are still operational Expected lifespan at least another 10 years.
Computing Infrastructure
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
6-April 06 by Nathan Chien. PCI System Block Diagram.
What's new?. ETS4 for Experts - New ETS4 Functions - improved Workflows - improvements in relation to ETS3.
E-VLBI Progress with the LBA Chris Phillips, eVLBI Project Scientist November 2011.
Processes Management.
Chapter 16: Recovery System
Press any key to continue by Marc Ruocco 1 High-Speed Interfaces: FPDP and RACEway RACE, RACEway and RACE++ are trademarks of Mercury Computer Systems,
PowerEdge T20 Customer Presentation. Product overview Customer benefits Use cases Summary PowerEdge T20 Overview 2 PowerEdge T20 mini tower server.
StreamBlade SOE TM Initial StreamBlade TM Stream Offload Engine (SOE) Single Board Computer SOE-4-PCI Rev 1.2.
© 2009 IBM Corporation Statements of IBM future plans and directions are provided for information purposes only. Plans and direction are subject to change.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
Integration of the Mk5B Playback System into the Mk4 Correlator Roger Cappallo MIT Haystack Observatory Concepcion
The CVN Real Time Correlator Zhang Xiuzhong, Chen Zhong Shanghai Astronomical Observatory China 4th e-VLBI Workshop Sydney
Mark 5C VLBI Data System Alan Whitney MIT Haystack Observatory 16 June 2008 e-VLBI workshop Shanghai, China.
East Coast Geodetic VLBI Workshop12011 Feb ~ 2.2 – 15 GHz Spanned RF Bandwidth OLD Phase Frequency (GHz) 142 Observing Frequency Bands.
Mark 6: design and status update VLBI Technical Meeting MIT Haystack Observatory Roger Cappallo Alan Whitney Chet Ruszczyk.
Linux Clustering A way to supercomputing. What is Cluster? A group of individual computers bundled together using hardware and software in order to make.
DBBC3 Development - Digital Base-Band Converter 3
THE CPU Cpu brands AMD cpu Intel cpu By Nathan Ferguson.
Students: Oleg Korenev Eugene Reznik Supervisor: Rolf Hilgendorf
Chongo Service Training Hardware Overview Prepared by Merlin Miller, Dave Jordahl, John Ciardi, March 2005.
XP Practical PC, 3e Chapter 17 1 Upgrading and Expanding your PC.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco PublicNew CCNA Jianxin Tang IT 1 V4.0 Ch1. Introduction.
A case should be... The mission of YY-W2xx Server Chassis Application Power User Workstation Small and Medium Business Pedestal Server Quick view at products.
Mr C Johnston ICT Teacher BTEC IT Unit 02 - Lesson 02 Inside Computers #1 – Motherboards, CPUs, PSUs and Cooling.
Module 9 Review Questions 1. The ability for a system to continue when a hardware failure occurs is A. Failure tolerance B. Hardware tolerance C. Fault.
1 An Introduction to the Storage Bridge Bay Specification.
Strata IT Training Chapter 8 Upgrading Hardware. When to Upgrade Poor performance Out of disk space Application(s) fail to load –Need more RAM System.
Chapter 10: Input / Output Devices Dr Mohamed Menacer Taibah University
Online Systems Status Review of requirements System configuration Current acquisitions Next steps... Upgrade Meeting 4-Sep-1997 Stu Fuess.
COMPUTER PARTS.
© Cisco Systems, Inc. All rights reserved. Cisco Public ITE PC v4.1 Chapter 3 1 Chapter 3: Computer Assembly – Step by Step IT Essentials: PC.
By: Joshua chambers INTRODUCTIONINTRODUCTION What your computer can do depends upon two things: the hardware your computer has, and the software that.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
Guide to Linux Installation and Administration, 2e1 Chapter 2 Planning Your System.
VLBI Storage Manager (VSM) Matteo Stagni – Mauro Nanni 0.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
The Alternative Larry Moore. 5 Nodes and Variant Input File Sizes Hadoop Alternative.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 3: Computer Assembly IT Essentials 5.0.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
How are they called?.
Demonstration of 16Gbps/station broadband-RF VLBI system Alan Whitney for the VLBI2010 development team MIT Haystack Observatory 22 October st Intl.
Input/Output Problems Wide variety of peripherals —Delivering different amounts of data —At different speeds —In different formats All slower than CPU.
Parts of the computer Deandre Haynes. The Case The Case This Case is the "box" or "chassis" that holds and encloses the many parts of your computer. Its.
1 Conduant Mark5C VLBI Recording System 7 th US VLBI Technical Coordination Meeting Manufacturers of StreamStor ® real-time recording products
1 Device Controller I/O units typically consist of A mechanical component: the device itself An electronic component: the device controller or adapter.
Hands-On Microsoft Windows Server 2008 Chapter 7 Configuring and Managing Data Storage.
Potential VLBI2010 Data System Alan Whitney MIT Haystack Observatory Mikael Taveniku XCube Systems 24 Feb 2011 East Coast VLBI meeting Haystack Observatory.
The World Leader in High Performance Signal Processing Solutions SD/SDIO Introduction Cliff Cai.
HP Proliant Server  Intel Xeon E3-1220v3 (3.1GHz / 4-core / 8MB / 80W).  HP 4GB Dual Rank x8 PC E (DDR3-1600) Unbuffered Memory Kit.  HP Ethernet.
CRISP WP18, High-speed data recording Krzysztof Wrona, European XFEL PSI, 18 March 2013.
PCs ENVIRONMENT and PERIPHERALS Lecture 4. An expansion cards: - An expansion card (expansion board) is an electronic circuit board that adds more functionality.
AS 61/62 USP The 1 st BRASWELL NAS (Celeron N3050/N3150) – Best performance: 224 MB/s read, 213 MB/s write Equipped with dedicated hardware encryption.
A Wide-Band VLBI Digital Backend System Alan Whitney Shep Doeleman Brian Fanous Hans Hinteregger Alan Rogers MIT Haystack Observatory 10 Jan 2006 IVS General.
E2800 Marco Deveronico All Flash or Hybrid system
SGC-250 Synchronous Generator Controller
Personal Computers A Research and Reverse Engineering
JIVE UniBoard Correlator (JUC) Firmware
The mission of YY-W2xx Server Chassis
Hard Drives & RAID PM Video 10:28
Universal Serial Bus (USB)
Command and Data Handling
Presentation transcript:

Mark 6 VLBI Data System Alan Whitney Roger Cappallo Chet Ruszczyk Jason SooHoo MIT Haystack Observatory 11 Oct nd International VLBI Technical Jeju, S. Korea

Why Mark6? - drivers for ever-increasing data rates -Sensitivity! -VLBI2010 – enables smaller antennas & shorter scans for better sampling of the atmosphere -EHT – enables coherent detection of Sgr A* at mm wavelengths (through a fluctuating atmosphere)

Mark 6 goals - 16Gbps sustained record capability >=32Gbps burst-mode capability - Support all common VLBI formats possibly general ethernet packet recorder - COTS hardware relatively inexpensive upgradeable to follow Moores Law progress - 100% open-source software Linux O/S Other considerations playback as standard Linux files e-VLBI support smooth user transition from Mark 5 preserve Mk5 hardware investments, where possible

Mark 6 Physical Layout System chassis (supports 8Gbps by itself) Expansion chassis (needed for 16Gbps) Retractable cable panel Mark 5/6 enclosure Power supply Chassis backplane kit Data-electronics hardware (for easy management of eSATA data cables) Module-front-panel connectors for two standard SAS2 cables Mark 5/6 enclosure Power supply Chassis backplane kit 5U 1U 8 monitor LEDs (one per disk) 4

Existing Mark 5 chassis is upgradeable to Mark 6 5 Mark 6 hardware Existing Mark 5 SATA disk modules are upgradeable to Mark 6 (new backplane and front panel) High-speed data connections to module front-panel via two standard SAS cables Cable-management panel (unused cables retract into panel) New chassis backplanes for disk power management

Mark 6 16Gbps system

Mark6 block diagram

c-plane l -control plane l -author: Chet Ruszczyk l -written in python l -interface to user (e.g. field system) –VSI-S and XML control/monitor l -responsible for high-level functions –-disk module management l creating l mounting & unmounting –-scan-based recording –-status, error-checking, etc.

c-plane integration & test l -focused on the VLBI2010 system requirements l -accepts data from 4 RDBE-Hs l _CC master control – temporary – until FS is ready for mk6 – converts.skd to xml format – simple time sequencing of scan-based obs.

dplane l -data plane l -author: Roger Cappallo l -written in C l -implements the high-speed data flow l -input from NICs l -output to disks within mk6 modules l -manages: – start and stop of data flow via packet inspection – organization of data into files addition of metadata to files

dplane block diagram

dplane - Technical Highlights l pf_ring used for high-speed packet buffering l efficient use of multiple cores – based on # of available cores – smp affinity of IRQs – thread binding to cores most of physical RAM (up to GB) used for large ring buffers and locked in – one large ring buffer per stream – can be changed dynamically from 1 to 4 streams

dplane – file modes l scatter mode l ~10 MB blocks scattered to files resident on different disks – prepended block# for ease of reassembly – uses faster disks to keep up with flow, but balances disk usage as much as possible – resiliet to l standalone program gather – efficiently writes data in correct order to single file – not necessary for single-file (RAID) mode – front end merging software planned for difx RAID mode l data written to single file – typically on a RAID array – good mode for single module of SSDs

Mark 6 data hardware ASRock X79 Champion LGA 2011 Intel X79 motherboard 64GB DDR3 SDRAM x Myricom 10G-PCIE2-8B2-2C 10GE NIC LSI E Host Bus Adapter Mark 6 14

Additional Features l capture to ring buffers is kept separate from file writing – helps to facilitate e-VLBI l FIFO design decouples writing from capturing (e.g. keep writing during slew) l option to conver mk5b format packets on the fly into vdif packets l all Mk6 software is open source for the community l Mk6 electronics hardware is non-proprietary & openly published

Timeline –- Feb 2013: bistatic radar observations of asteroid DA14 recorded at Westford l continuous 8 Gb/s on 2 modules –-Mar 2013: VLBI2010 stand-alone testing –-Sep/Oct 2013: delivery of eight Mark 6 systems (5 - ALMA VLBI; 3 – VGOS) –-Sep/Oct 2013: Developing Mark 6 interfacing software for DiFX correlator; completing standalone self-test; complete documentation

Proof of Concept Experiment l -done with prototype software (v.0)-June 2012 l -Westford – GGAO l -technical details –VDIF format –16 Gb/s onto 32 disks –4 GHz bandwidth on the sky –dual polarization with 2 GHz IFs –processed as four 512 MHz channels

Recent progress l continuous 16Gbps error-free operation onto 32 disks using scatter file system l scatter file writing upgraded to support writing operations as high as 31 Gbps onto 32 disks l gather file-reading software reconstructs data written in scatter mode l FUSE front-end for file reading hides gather operation l testing of high-level interface software l long duration simulated experiment usage l tests with SSD-equipped Mark 6 modules l Still to be done: FS support

VLBI Support Forum at

Mark 6 availability Several options: –Purchase new Mark 6 system from Conduant (~US$13k with 64GB RAM memory, no disk modules) –Upgrade existing Mark 5 system (either yourself or with kit from Conduant) –Upgrade Mark 5 SATA-modules (with upgrade kits from Conduant) –Purchase Mark 6 modules (with or without disks) Contact Greg Lynott of Conduant 21

New Front Panel New PCB and power connector New Latch provided (pre-installed on new Panel) Re-use Handle from old Module Mark 5 SATA Drive Module Upgrade to Mark 6 8x LED (1 per drive) Front Panel Rear Panel Easily removable disks Connectors for two eSATA cables Cooling slots 22

Recording-rate capability vs time 23 COTS mostly COTS

Recording-rate cost vs. time 24 COTS mostly COTS

Questions?