ICFA Neutrino Panel: Roadmap discussion document

Slides:



Advertisements
Similar presentations
9 November 2007 Cecilia de la Rosa Head of the Internal Quality Unit How to prepare for an external review Current trends in the European Quality Assurance.
Advertisements

FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
DISTILLATE Appraisal Workshop 21 May 07 Michael Padgett, Regional Transport Advisor, Yorkshire & Humber Assembly.
Towards a Future Long-Baseline Neutrino Experiment Bob Wilson Colorado State University CERN Prototype/Beam Test Meeting CERN, 20 October 2014.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
The meeting in Paris: The agenda has been built and optimized.
ISS After One Year Peter Dornan Imperial College London.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
European Strategy for Particle Physics Proposed Draft to the CERN Council ECFA Linear.
Strategy Group Preparatory Group INTRODUCTION Ken Peach 10 th October 2005.
The Global Fund - Proposal Process & Round 8 February 19, 2008.
1 FUTURE STESEG WORK - CURRENT AND NEW PROJECTS - FUTURE STESEG WORK - CURRENT AND NEW PROJECTS - SHORT-TERM ECONOMIC STATISTICS EXPERT GROUP (STESEG)
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
The European Strategy Group (ESG) The remit of the ESG is to establish a proposal for an Update of the medium and long- term European Strategy for Particle.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Long Baseline Neutrinos How we got here Nigel S. Lockyer Fermilab Open Meeting on Neutrinos 12/12/2014.
Strategic Advisor for Social Work and Social Care Research.
BSM Group Activities DUNE Collaboration Meeting –ND Physics Jan. 14, 2016 Jae Yu Univ. of Texas at Arlington.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
K. Long, R. Roser, 23 July 2014 Report from the Neutrino Summit.
What was the goal of the International Meeting ? –Involve world-wide project leaders and agency responsibles to set-up instruments for the encouragement.
RTI, MUMBAI / CH 61 REPORTING PROCESS DAY 6 SESSION NO.1 (THEORY ) BASED ON CHAPTER 6 PERFORMANCE AUDITING GUIDELINES.
Goals of the consultation meetings From the ToR, the goals of the meeting in the first year should be: communicate that the panel exists; collect input.
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
13 TH MEETING OF THE GBIF PARTICIPANT NODE MANAGERS COMMITTEE – 6 OCTOBER 2015 Review of regional collaboration Olaf Bánki.
The CERN Near Detector(s) initiative
Social Protection Global Technical Team Retreat,
Well Trained International
Strategic Advisor for Social Work and Social Care Research
Final Discussion THE EUROPEAN STRATEGY FOR FUTURE NEUTRINO PHYSICS
The European Strategy for Particle Physics
303(d) List Methodology Jeff Manning
Guideline for Implementing Training Programme
Overview of the Neighbourhood Plan Process
Collaboration Board Summary
The Way Forward ISS to IDS
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Charge for APS Neutrino Study
Round Table Discussion – The Future of Accelerator-Based Neutrino Physics NuFact 2017 Uppsala, Sweden September 25th, 2017.
nuSTORM and the Physics Beyond Colliders workshop
Status report on the activities of TF-CS/OTA
Report from ICFA neutrino panel
Future physics at nuSTORM
The IAASB’s Future Strategy
CEOS Contribution to Disaster Risk Management Way Forward
FALC report and KEK’s plan for the ILC
Gas Regional Investment Plan project
Roadmap for Programme of Work
Jozsef Szlezak & Pawel Kazmierczyk (EEA)
IUPAP Neutrino Panel.
Review Art.17/12 for 2016 and onwards
HEYWORTH COMMUNITY SCHOOL DISTRICT TEACHER EVALUATION PROCESS
A High Intensity Neutrino Oscillation Facility in Europe
Second Independent Evaluation of UNAIDS
Review plan of the nature reporting – update 6
Task Force Peer reviews and quality Eurostat
Report from the SPC Chair
Presentation transcript:

ICFA Neutrino Panel: Roadmap discussion document

Contents The Panel and its mission Roadmap discussion document Next steps

The Panel and its mission ICFA nuPanel: roadmap discussion document The Panel and its mission http://icfa.fnal.gov/panels/neutrino_panel/

http://icfa.fnal.gov/panels/neutrino_panel/

Roadmap discussion document ICFA nuPanel: roadmap discussion document Roadmap discussion document

https://kds.kek.jp/indico/event/20176/material/0/ http://icfa.fnal.gov/wp-content/uploads/2016-05-07-nuPanel-roadmap-Final.pdf https://kds.kek.jp/indico/event/20176/material/0/

Goals and contents

Roadmap goals Vibrant programme must: Have discovery potential & deliver critical measurements in the short and medium term: Present and next-generation experiments Implies parallel theory and phenomenology programmes Develop the capabilities required to out-perform the present and next-generation experiments: Implies detector and accelerator R&D programmes

Discussion document Documents: Evaluation: Panel derived interim: Approved objectives for experiments in operation Approval, construction/exploitation timeline for experiments under consideration Proposed timeline for experiments not yet under consideration Evaluation: Evolution of precision of SvM mixing parameters Panel derived interim: Branch points based on evolution of precision Recommendations on development of programme

Contents Principal sections: For context, sections on: Accelerator-based long-baseline oscillation programme [Light] Sterile neutrino searches at accelerators Supporting programme Interim conclusions and recommendations For context, sections on: Reactors and source experiments Non-terrestrial source experiments Non-oscillation programme

Census

Accelerator-based neutrino community Complete, consistent census unavailable Panel assembled partial information: Europe: ECFA census of European particle-physics community 2009 The Americas: Number of researchers involved in FNAL-based neutrino experiments Canadian survey of particle-physics community prepared during 2015 long-range planning exercise Asia: Asian panel members conducted an ad hoc “mini survey” of the accelerator-based neutrino community

Accelerator-based neutrino community Asia: Europe, 2009 ECFA survey: Of particle physics community: 10% (1000) involved in neutrino experiments; Of these, 40% (400) involved in accelerator-based programme Americas: Canada, 2015 survey: 105 involved in neutrino expts 35 involved in accelerator-based programme

Neutrino conference

Global accelerator-neutrino community census Partial/anecdotal evidence of growth in community Needed to deliver planned/proposed programme Accurate, up-to-date and consistent census Valuable in planning the development of programme Census Propose to execute through simple questionnaire: Adopted format similar to recent ECFA & ApPEC surveys Well trodden, successful path Panel recommendation, endorsed by ICFA Seek to gather necessary data as part of stakeholder consultation

Interim recommendations

Accelerator-based LBL nu-oscillation programme

Synergy and complementarity Running experiments: T2K & NOvA: Complementary: baseline, technology, beam Synergy: enhanced discovery potential in combination Going forward: DUNE & Hyper-K: Complementary approaches, synergy in measurement On the complementarity of Hyper-K and LBNF ICFA Neutrino Panel; arXiv:1501.0391

Accelerator-based LBL nu-oscillation programme

Accelerator-based LBL nu-oscillation programme

Sterile-neutrino searches at accelerators

Sterile-neutrino searches at accelerators

Supporting programme + + + + + + Collaboration lists taken from “parent” collaboration.

Supporting programme

Supporting programme

Supporting programme

ICFA nuPanel: roadmap discussion document Next steps

Roadmap next steps First public presentation of the discussion document Presented at 3rd International Meeting on Large Neutrino Infrastructures; KEK, 30-31 May 2016 Formal opportunity for presentation/feedback Neutrino 2016: London, 4—9 July 2016 NuFact 2016: Quy Nhon, 22—27 August 2016 Finalise roadmap through autumn 2016 Deadline for comments (passed): 15 October 2016 Presentation of final roadmap document to ICFA: Feb17 ICFA meeting