Accredited Standards Committee C63® - EMC Secretariat Update Jennifer Santulli C63 ® Secretariat May 2017
Accredited Standards Committee C63® - EMC Status of Standards Standards Inactive/Withdrawn: None PINS Submitted 12/1/17: C63.4 (revision), C63.5 (revision), C63.23 (revision), C63.27(revision) Standards Published: C63.15-2017 Drafts in Ballot: C63.25.1 (invite closed 4/23/18) 18 Voters C63.5-2017/cor1 (Ballot closed 4/23/18) 57% response rate, 92% approval, 21 ballot pool
Accredited Standards Committee C63® - EMC PINS Submitted C63.4 (Revision) Standard for Methods of Measurement of Radio- Noise Emissions from Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz. C63.5 (Revision) Standard for Electromagnetic Compatibility - Radiated Emission Measurements in Electromagnetic Interference (EMI) Control - Calibration and Qualification of Antennas (9 kHz to 40 GHz) C63.23 (Revision) Measurement Uncertainty C63.27 (Revision) Standard on Evaluation of Wireless Coexistence (Revision of C63.27-2017)
ASC C63® Open Projects Designation PINS BSR 8 BRS C63.5-201x √ BSR 8 BRS C63.5-201x √ 12/1/2017 BSR C63.5-201x 5/26/2017 BSR C63.8-201x 11/11/2011 C63.9-201x 6/3/2016 BSR C63.10-201x 11/27/2015 BSR C63.11-200x 4/13/2007 BSR C63.14-200x 5/29/2015 BSR C63.19-201x 4/22/2016 BSR C63.23- 201x BSR C63.24-200x 11/16/2001 BSR C63.25-201x BSR C63.27 BSR C63.28-201x 5/16/2014 BSR C63.29 BSR C63.30 BSR C63.31
Accredited Standards Committee C63® - EMC Years Old Action Date ANSI Final Action PINS for Revisions Approved C63.19-2011 6.7 None 4/14/11 4/22/2016 C63.22-2004 (R2012) 5.0 11/30/12 Will let expire C63.23-2012 4.11 12/3/12 Reaffirmation 12/1/17 C63.10-2013 4.5 6/27/2013 11/27/2015 C63.17-2013 4.3 8/12/2013 C63.18-2014 3.6 5/13/2014 C63.4-2014 3.5 PINS C Approved 6/13/2014 12/1/17 C63.14-2014 3.3 8/28/2014 5/29/2015 C63.9-2008 (R2014) 3.1 10/16/2014 6/3/2016 C63.7-2015 2.10 1/29/2015 C63.12-2015 2.5 6/18/2015 C63.16-2016 1.11 2/1/2016 Status of Standards
Accredited Standards Committee C63® - EMC (cont’d.) Years Old Action Date ANSI Final Action PINS for Revisions Approved C63.26-2015 1.10 None 12/3/2015 6/13/2016 C63.2-2016 1.0 10/11/2016 C63.5-2017 .10 1/31/2017 5/26/2017 C63.27-2017 1/19/2017 C63.15-2017 .4 7/13/17
Accredited Standards Committee C63® - EMC No Ongoing Work Status Action C63.1 Method of Measuring Radio Interference of Electrical Components and Completed Assemblies of Electrical Equipment for the Armed Forces from 150 Kilocycles to 20 Megacycles. C63.3 C63.11 Inter-lab Comparison of EMC Testing Work suspended 11/12/15. Never published-Withdraw PINS? C63.6-1996 American National Standard Guide for the Computation of Errors in Open-Area Test Site Measurements Administratively withdrawn C63.13-1991 American National Standard Guide on the Application and Evaluation of EMI Power-Line Filters for Commercial Use Status of Standards
ASC C63 Archived Standards (cont’d) Status of Standards Standard Title Status C63.20 ? C63.21 C63.22-2004 (R2012) American National Standard Guide for Automated Electromagnetic Interference Measurements No plans for further maintenance at this time. Withdraw or let expire?
Accredited Standards Committee C63® - EMC No action items or special requests from November 2017 meeting
Accredited Standards Committee C63® - EMC 36 Voting Members Classification # in Category % Calibration Lab (CL) 1 3% General (G) 8 22.5% Government (GV) 6 16.5% Manufacturer (M) 9 25% Professional Society (PS) 2 5.5% Test Lab (TL) Trade Association (TA) 4 11% In accordance with ANSI Essential Requirements, no category can exceed 50%
Accredited Standards Committee C63® - EMC Balloting Timeline: -Approved by Subcommittee -Approve by Main committee -Submit to Jen -Initiate MEC and Ballot Invite (30 days) -Make adjustments as requested -Open ballot (30 days) -Comment Resolution -All comments MUST be considered -If comments are rejected/no change to the document draft can be submitted for final action -If any comments result in a change to the draft a recirculation is required (15 day minimum) - Repeat above -Submit BRS’s, Public Review (45 days), ANSI review 30 days), Publication
Accredited Standards Committee C63® - EMC Voting: Approval of standards requires an electronic ballot with approval by at least a majority of the balloting group and at least two-thirds of those voting, excluding abstentions. This procedure applies to: A new standard; 2) Revision, amendment, reaffirmation or withdrawal of an existing standard
AAccredited Standards Committee C63® - EMC Thank you Questions??