1 DCS Cost DCS Workshop 13.06.05 L.Jirden u Central DCS cost u Detector DCS cost.

Slides:



Advertisements
Similar presentations
22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.
Advertisements

ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
André Augustinus 22 June 2004 DCS Workshop Status on services controls.
The Detector Control System – FERO related issues
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
André Augustinus 5 March 2007 Infrastructure status.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
André Augustinus 16 June 2003 DCS Workshop Safety.
TPC Very High Voltage Control Status report Marco Boccioli 20/04/2006.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
S.Sergeev, JINR, Dubna. This is just an example of what could be done Could be extended to needs of any NA62 sub- detector requiring a lot of analog measurements.
First attempt of ECS training Work in progress… A lot of material was borrowed! Thanks!
Robert Gomez-Reino on behalf of PH-CMD CERN group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
André Augustinus 16 September 2002 Safety issues.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
European Organization for Nuclear Research Geneva - Switzerland Ing. Robert van der Vlugt CERN/PH Alice Detector Control System Serial Communication, simple,
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
The DCS lab. Computer infrastructure Peter Chochula.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Alice TPC DCS.
TPC Detector Control System
Presentation transcript:

1 DCS Cost DCS Workshop L.Jirden u Central DCS cost u Detector DCS cost

2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment Controller/ PLC VME Field Bus LAN Node cooling gas Magnets Rack control Electricity Safety: DSS Safety: CSAM Infrastructure Services Central DCS Detectors ~1440K ? ?

3 u Consoles u Remote access u Backend servers u Worker nodes u Infrastructure and network u Spares Central DCS

4 Firewall Terminal Server IP Reach for KVM Domain Controller DB Server (Config.) DB Server (Archive) File Server Network and Security FSM Alarms General DCS Electricity & Racks Gas & Cooling Environment General services LHC & Access Alignment Information Server CERN System Management DCS Operator DCS Status Safety Status ConsolesRemote AccessBackend Servers Worker Nodes Detector DCS ACR Consoles DB Server (Archive) Infrastructure, network Racks, network, cabling KVM switches controlled power plugs Hot swap spare servers Disks & memories Spares 12 KCHF 13.1 KCHF34.5 KCHF 18.5 KCHF 43.6 KCHF On DAQ budget TOTAL: KCHF 7.1 KCHF DCS network

5 Consoles WN RoleHardware ConfigurationCost (CHF) DCS System Administrator ConsolePIV, 1 GB RAM + Monitor2500 DCS Operator ConsolesPIV, 1 GB RAM + Monitor2500 DCS Status DisplayPIV, 1 GB RAM + Monitor2500 Safety DisplayPIV, 1 GB RAM + Monitor2500 KVM Switches ACR Consoles (on DAQ budget)0 Total(4 consoles)12000

6 Remote access WN RoleHardware ConfigurationCost (CHF) Main network gateway/firewallTo be detailed by CNIC5000 DCS Terminal ServerPIV or XEON, 4 GB RAM2500 DCS Terminal ServerPIV or XEON, 4 GB RAM2500 IP reach for KVMRaritan IPR-M13100 Total13100

7 Backend servers Server RoleHardware ConfigurationCost (CHF) Primary Domain Controller1xXeon, 2 GB RAM2500 Secondary Domain Controller1xXeon 2 Gb RAM2500 Configuration Database Server2xXEON, 4 GB RAM4000 Archive Database Server (P2)2xXEON, 4 GB RAM4000 Archive Database Server (IT)2xXEON, 4 GB RAM, disk array12000 DCS Disk server2xXEON, 4 GB RAM, disk array7000 DCS Information ServerPIV or XEON, 4 GB RAM2500 Total (7 backend servers)34500

8 Worker Nodes WN RoleHardware ConfigurationCost (CHF) DCS network (monitor and management) PIV, 2 GB RAM1600 DCS general (FSM)PIV, 2 GB RAM1600 DCS general (alarm/messages)PIV, 2 GB RAM1600 DCS general (general DCS)PIV, 2 GB RAM1600 Infra/services (electricity & racks)PIV, 2 GB RAM1600 Infra/services (gas & cooling)PIV, 2 GB RAM1600 Infra/services (environment)PIV, 2 GB RAM1600 Infra/services (general services)PIV, 2 GB RAM1600 Infra/services (LHC & access)PIV, 2 GB RAM1600 Infra/services (alignment)PIV, 2 GB RAM1600 PCI + ELMB for infrastructure2500 Total(10 worker nodes)18500

9 Infrastructure and Network WN RoleHardware ConfigurationCost (CHF) 3 Powered Racks (8000/rack)24000 Network installation (400/port)To be detailed by IT/CO10000 KVM switchRaritan Z-series2000 KVM user stationsUSTSZ4000U – 20 pack3600 Power plug controlSpectrum control4000 Total43600

10 Spares WN RoleHardware ConfigurationCost (CHF) Backend Server Spare (hot swap)PIV or XEON, 4 GB RAM2500 Worker Node Spare (hot swap)PIV, 2 GB RAM2500 Disks and memory modules3000 Total7100

11 [FED] Chambers ISEG PCI-CAN ISEG OPCserver PVSS II Chambers Wiener PCI-CAN Wiener OPCserver Ethernet User interface Database(s) RCU OPC client DIM client ? PVSS II Chambers, detector ELMB 1..18~400? PVSS II RS232 HVrod Heinzinger 1118? High Voltage Low VoltageFEETemp. Mon.Very High Volt PVSS II OPC client PVSS II OPC client PCI-CAN ELMB OPCserver PVSS II OPC client TPC (1) CC HVLV EC HV S [FSM?] Control room (ACR) 108? 26/11/04 Eth. Switch ?? E E LV monitor DIMsrv DIMcl DDL PVSS II DIMclient HVrod ELMB ?1?2 VHV Curr. Mon. PCI-CAN ELMB OPCserver PVSS II OPC client C CENTRAL DCS DETECTOR DCS

12 Ethernet TPC (2) Rod Cooling Thermal Screen(s) PLC 181 Thermal Screen ? DIMserver (?) ? Laser cal. Syst. PCI-Profibus OPCserver (?) 2? Pulser system PSLaser Mirrors, cameras ? Gas system PLC ELMB Gas E C P HVrod 4 Cooling Plant (TS) Detector P Chambers Gating pulser 72? Calibration pulser 26/11/ PVSS II Modbus/TCP [TS/CV] [GWG] Cooling Plant (ch) PLC 1 Ch Cooling E Chambers, detector 40 PVSS II Modbus/TCP TS/CV SCADA DETECTOR DCS COOLING BUDGET GAS BUDGET

13 DETECTOR DCS Cost Disclaimer u Inputs from 13 detectors u My own guess on 4 u None is complete u Major costs are in cables and connectors u Number and prices very uncertain u Probably underestimated u Installation cost are not included

14 Detector DCS cost SPD21K75k SDD25K guess50k SSD25K20k TPC100K300k TRD80K guess82k TOF43K 89k HMPID80K15k PHOS44K150k CPV20K0 PMD11K100k FMD8K0 V07K0 T016K0 ZDC5K guess0 MUON TRK42K200k MUON TRG11K50k ACORDE5K guess0 Estimation today Quoted in MOU