CSSWG Status Report March 17-18, 2005 CIPC Meeting Long Beach, CA

Slides:



Advertisements
Similar presentations
NERC Critical Infrastructure Protection Advisory Group (CIP AG) Electric Industry Initiatives Reducing Vulnerability To Terrorism.
Advertisements

NERC CIPC March 16, 2006 Roadmap to Secure Control Systems in the Energy Sector U.S. Department of Energy Office of Electricity Delivery and Energy Reliability.
CIPC Executive Committee Update CIPC Meeting Washington DC June 9, 2005 Stuart Brindley CIPC Chair Public Release.
CIPC Executive Comittee Update CIPC Conference Call September 16, 2004 Stuart Brindley CIPC Chair CIPC Confidentiality - Public.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
CRITICAL INFRASTRUCTURE PROTECTION COMMITTEE. 2 Group carried over from ECAR, MAAC, & MAIN workgroups that were assembled to address 1200 Urgent Action.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Thomas Levy. Agenda 1.Aims: Reducing Cyber Risk 2.Information Risk Management 3.Secure Configuration 4.Network Security 5.Managing User Access 6.Education.
CIPC Executive Committee Update CIPC Meeting Denver CO September 29, 2005 Stuart Brindley CIPC Chair Public Release.
Control Systems Security Working Group Report CIPC Meeting Denver, CO September 2005 Tom Flowers Public Release.
AREVA T&D Security Focus Group - 09/14/091 Security Focus Group A Vendor & Customer Collaboration EMS Users Conference September 14, 2009 Rich White AREVA.
CIPC Executive Committee Update CIPC Meeting Mesa AZ March 16, 2006 Barry Lawson CIPC Vice-Chair CIPC Confidentiality: Public Release.
NRIC EDUCATIONAL OUTREACH September 15, 2003 Pamela J. Stegora Axberg NRIC VI Steering Committee Chair
September 25, 2008 Public ERCOT Critical Infrastructure Protection Advisory Group (CIP AG) TASOR TF Update Jim Brenton, CISSP CISM Director of Security.
NERC and ESISAC Electricity Sector Information Sharing and Analysis Center Update March 2006 CIPC Confidentiality: Public Release.
Security at FERC Energy Projects Energy Bar Association Mid-Year Meeting Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory.
Standards and Guidelines Working Group Status Updates 2005 Jun 09 Washington DC Critical Infrastructure Protection Committee Public Release.
CIPC Executive Committee Update-1 CIPC Meeting Long Beach CA March 17, 2005 Pat Laird Vice Chair Public Release.
Reporting Technologies Working Group Update NERC CIPC Meeting March 17, 2005 Long Beach, CA. Public Release.
Security Guidelines Working Group Update CIPC Meeting Denver CO September 29, 2005 Seiki Harada SGWG Chair Public Release.
Working Group 3: Emergency Alert Systems Status Update March 16, 2016 Kelly Williams, Co-Chair National Association of Broadcasters Steve Johnson, Co-Chair.
Critical Infrastructure Protection Committee Report to NERC Standing Committees in Joint Session Long Beach, CA March 2005 Public Release.
Medical Device Security Information Sharing Council
Aims: EVALSDGs seeks to: promote evaluation activities around the SDGs
SOIS Area Report Wireless WG Primary Objectives for the fall meeting
ISA-SP99: Security for Industrial Automation and Control Systems
Agenda Control systems defined
IAASB-IESBA Coordination
presentation to the ICC Commission on the Digital Economy
CIPC Outreach WG Update March 2006
CIPC Executive Committee Update
CIPC Relationships & Roles
Critical Infrastructure Protection Committee Report to NERC Standing Committees in Joint Session Long Beach, CA March 2005 Public Release.
Role for Electric Sector in Critical Infrastructure Protection R&D
NERC Critical Infrastructure Protection Advisory Group (CIP AG)
CIPC Executive Committee Update-1
Security Guidelines Working Group Update
CIPC Executive Committee Update
North American Stakeholder Meeting:
NERC Cyber Security Standard
Public Release Reporting Technologies Working Group Update NERC CIPC Meeting March 17, 2005 Long Beach, CA.
NERC Critical Infrastructure Protection Committee (CIPC) Executive Committee Public Release 29 September 2005.
Control Systems Security Working Group Report
IC DRAFT REPORT IEEE 802 Network Enhancements for the Next Decade Report Date: 13 November 2018 Chair: Roger Marks, Huawei (since March 2018) Participants:
Chair: Roger Marks, Huawei (since March 2018)
IC IEEE 802 Network Enhancements for the Next Decade Type: Individual Report Date: 14 February 2019 Chair: Roger Marks (Huawei) Participants: Individuals,
Critical Infrastructure Protection Committee
IC DRAFT REPORT IEEE 802 Network Enhancements for the Next Decade Report Date: 13 November 2018 Chair: Roger Marks, Huawei (since March 2018) Participants:
Group Meeting Ming Hong Tsai Date :
IS Risk Management Report (Template)
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
CIPC Executive Committee Update
July 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG SRU Opening Information for July 2014]
Next Steps Advisory group debrief call Circulate meeting summary
Crisis Response Task Force (CRTF) Proposal
IC IEEE 802 Network Enhancements for the Next Decade (DRAFT) Type: Individual Report Date: 14 February 2019 Chair: Roger Marks (Huawei) Participants:
Security Guidelines Working Group Update
CIPC Executive Committee Report-2
Roger Marks (Huawei) capable 13 March 2019
Roger Marks (Huawei) capable 12 March 2019
Roger Marks (Huawei) capable 15 May 2019
Roger Marks (Huawei) capable 21 May 2019
May 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG SRU Opening Information for May 2013] Date.
Roger Marks (Huawei) capable 15 July 2019
Roger Marks (Huawei) capable 18 July 2019
Roger Marks (Huawei) capable 14 May 2019
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda September 2019 Interim]
July 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG SRU Opening Information for July 2013]
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda September 2019 Interim]
Roger Marks (Huawei) capable 16 September 2019
Presentation transcript:

CSSWG Status Report March 17-18, 2005 CIPC Meeting Long Beach, CA Public Release CSSWG Status Report March 17-18, 2005 CIPC Meeting Long Beach, CA Thomas R. Flowers, P.E. CSSWG Chair 12/27/2018 CEII Level: Public Release

11/11-12/04 CIPC Meeting Kansas City, MO 12/27/2018 CEII Level: Public Release

CEII Level: Public Release 11/30/04 ISA Common Ground CC Established “baby steps” for liaison Focus on document exchange and review Rules of Engagement needed (NDA) NDA drafted 2/28/05 12/27/2018 CEII Level: Public Release

CEII Level: Public Release 12/3/04 AGA Common Ground CC Established contacts within NERC (Flowers & Bugh) Identified AGA – 12 testing as start Discussed upcoming demo at PNL 12/27/2018 CEII Level: Public Release

12/9/04 Meeting with Delores Etter USNA Biometrics Lab. Annapolis, MA Flowers, Beahm, & Sypult Mostly applied research on biometrics Primary focus on Iris scan and facial recognition Reciprocal visit offered 12/27/2018 CEII Level: Public Release

12/17/04 Kick-Off IS-Encryption GL Development CC Focus on “point-to-point” using PGP Awareness of need to encrypt CII in transit “How to” language Electric Sector Public Key Server 12/27/2018 CEII Level: Public Release

CEII Level: Public Release 1/11/05 NSTB Project Managers on 2005 Work Plan and Roadmap Phoenix, AR Reviewed Roadmap and NSTB Work Plan Focus on deliverables to ES asset owners Address emerging & legacy technology Consolidated comments from CSSWG delivered 2/21/2005 12/27/2018 CEII Level: Public Release

1/13/05 CSSWG Meeting Phoenix, AR 2005 CSSWG Work Plan (March 05) Top Ten Vulnerabilities (March 05) Patch Mgt. Guideline (June 05) CS Connectivity Guideline (June 05) IS – Encryption Guideline (September 05) NSTB/CSSWG Liaison initiative 12/27/2018 CEII Level: Public Release

1/18/05 CSSWG/Telecom ISAC CC Established liaison contacts Identified a need for CS telecommunication infrastructure assessments Some opportunity for joint WG activity 12/27/2018 CEII Level: Public Release

2/3/05 DHS Cleared Briefing Washington, DC More focused on the Electric Sector DHS restructuring Greatest hacker threat from E. Europe 12/27/2018 CEII Level: Public Release

2/15/05 FERC Dam Conference Fort Worth, TX Provided links to NERC Guidelines Discussed NERC Standard Development Encouraged asset owner participation in CIPC 12/27/2018 CEII Level: Public Release

2/17/05 AGA-12 Testing @ NSTB CC Discussed specifics of AGA -12 testing Cryptology testing at Sandia Performance testing at PNL NSTB Test Plans would be a deliverable Must sort out fact from fiction for ES use 12/27/2018 CEII Level: Public Release

CEII Level: Public Release 2/22/05 CSSWG WebX Patch Mgt. Guideline CS Connectivity Guideline March 16 Agenda (shortened) 12/27/2018 CEII Level: Public Release

2/24/05 INL/EEI Conference Idaho Falls, ID NSTB/CSSWG liaison reinforced Top Ten Vulnerabilities – 2004 will be platform for INL “solutions” Electric Sector is an INL customer INL focused on CS security 12/27/2018 CEII Level: Public Release

3/2/05 DHS PCS Forum Governance Board CC Discussed May 17 & 18 Dallas meeting NERC document, anti-trust, and NDA policies offered Will not produce standards or guidelines but offer a vehicle for discussion and networking 12/27/2018 CEII Level: Public Release

3/7/05 DOE/DHS NSTB Roadmap CC Steering Comm. from ES, O&G, DOE, DHS, Nat. Labs 10 year roadmap for CS in Fall 2005 Invitation only workshop in July 2005 12/27/2018 CEII Level: Public Release

3/17-18/05 CIPC Meeting Long Beach, CA Top Ten Vulnerabilities – 2004 (approval) 2005 CSSWG Work Plan (approval) Patch Mgt. Guideline (review) CS Connectivity Guideline (review) 12/27/2018 CEII Level: Public Release

4/11-13/05 AGA/EEI Salt Lake City, UT Encourage AGA participation in CIPC Cyber Security Standards Discuss EEI/EPRI/NERC/NSTB relationship regarding CS security 12/27/2018 CEII Level: Public Release

CEII Level: Public Release 6/9-10/05 CIPC Washington, D.C. Patch Management Guideline (approval) CS Connectivity Guideline (approval) IS – Encryption Guideline (review) 12/27/2018 CEII Level: Public Release

CEII Level: Public Release 9/29-30/05 CIPC Denver, CO IS – Encryption Guideline (approval) 12/27/2018 CEII Level: Public Release