GNSS Approach for General Aviation

Slides:



Advertisements
Similar presentations
MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
Advertisements

OPERATIONS SPECIFICATIONS. OPERATIONS SPECIFICATIONS - WHY ? Wide variety of aircraft Wide range of operator capability Unique operations Rapid changes.
Regional RAIM Prediction System – Progress Report
Introduction to Navigation Specifications
Javier Perez Diestro Air Navigation International Director
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
PBN Plan Development Aviation Industry Forum 18 November 2009.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
PBN OVERSIGHT IN AUSTRALIA
Satellite Based Augmentation System (SBAS): – Augmentation of navigation satellite systems (GNSS). Operational SBAS or Systems being built (beyond study):
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Aircraft Certification and Operational Approval D. J. Hawkes Chairman JAA CNS/ATM Steering Group Luxembourg 2001 oint Aviation Authorities EUROCONTROL.
GNSS Aviation Applications
February EGNOS Safety of Life service demonstration for Civil Aviation Euromed GNSS II project/MEDUSA.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
Federal Aviation Administration Newark Project Overview January 2009.
 ARRANGEMENT OF REGULATIONS  PART I- PRELIMINARY 1. Citation 2. Interpretation 3. Application.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
EGNOS Africa Joint Programme Office 26 th IFATCA AFM RM Accra October 2015 EGNOS - AFRICA Joint Programme Office (JPO) | ASECNA, BP 8163 Dakar Yoff,
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding EGNOS System Definition and Benefits.
SESAR and GA Michael Erb Member of SESAR Excom IAOPA Regional Meeting Larnaka, 22nd September 2007.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA
UK Performance-based Navigation (PBN) Implementation Status
Safety Regulation of PBN Operations
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
PBN OVERSIGHT IN AUSTRALIA
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Galileo European Commission The European Satellite Navigation Program
PBN Performance Based Navigation
Performance Based Navigation: Navigation Specifications
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Regional RAIM Prediction System – Progress Report
What’s next: R&D funding opportunities
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Summary of the results of discussions in the aviation panel
Workshop on preparations for ANConf/12 − ASBU methodology
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
GAGAN is a Reality Today
THE AFILAND CIVIL AVIATION (AIR NAVIGATION SERVICES) REGULATIONS, 2009
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
GNSS opportunities in aviation
Oceanic and International Operations
Oceanic and International Operations
EGNOS Implementation status in Europe
PBN and the benefits for GA
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
LSSIP Objective AOP04.1.
RNAV and RNP Strategy in Japan
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Presentation transcript:

GNSS Approach for General Aviation Project GAGA GNSS Approach for General Aviation 08/10/2016 135th IAOPA RM, Bucharest

Beneficiaries are expected to following areas: Fostering the design, development and operational implementation of EGNOS based operations, including approach procedures at different European aerodromes and EGNOS based routes including LPV 200; Developing and installing of GPS/EGNOS enabled avionics and granting of airworthiness certification for RNP APCH procedures down to LPV minima and Point In Space (PinS); Achieving the approval of Air Operator Certificates for LPV operations of aircraft already equipped with SBAS capabilities; Developing of enablers to accelerate EGNOS adoption and preparation for future capabilities use of EGNOS for navigation, surveillance and communication. 08/10/2016 135th IAOPA RM, Bucharest

Current LPV implementations in Europe 08/10/2016 135th IAOPA RM, Bucharest

AOPA-UK Project Team experience in LPV implementation 08/10/2016 135th IAOPA RM, Bucharest

Scope of Project GAGA 08/10/2016 135th IAOPA RM, Bucharest