RR-TAG (802.18) to 802.11 Liaison Report April 2009 doc.: IEEE 802.19-09/xxxxr0 May 2013 RR-TAG (802.18) to 802.11 Liaison Report Date: 2013-05-17 Authors: Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion
April 2009 doc.: IEEE 802.19-09/xxxxr0 May 2013 Abstract This presentation is the liaison report from the RR-TAG for the May 2013 IEEE 802.11 Wireless Interim in Waikoloa. Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion
FCC Documents Reviewed and Approved by the RR-TAG May 2013 FCC Documents Reviewed and Approved by the RR-TAG IEEE 802 response to NPRM FCC 13-22: “Revision of Part 15 of the Commission’s Rules to Permit Unlicensed National Information Infrastructure (U-NII) Devices in the 5 GHz Band” https://mentor.ieee.org/802.18/dcn/13/18-13-0064-06-0000-draft- 802-comments-to-fcc-u-nii-band-nprm-fcc-13-49.docx 44 pages – the record size for an 802.18 Comments document Will require 10-day EC ballot prior to submission Rich Kennedy, BlackBerry
ITU-R Documents from 802.24 Reviewed and Approved by the RR-TAG May 2013 ITU-R Documents from 802.24 Reviewed and Approved by the RR-TAG Annex 3 to Working Party 1A Chairman’s Report “Working Document towards a PDN REPORT ITU-R M.[SMART_GRID]” https://mentor.ieee.org/802.18/dcn/13/18-13-0067-01-0000-draft- contribution-of-ieee-802-on-question-236-1.docx Rich Kennedy, BlackBerry
802.16 Document Reviewed and Approved by the RR-TAG May 2013 802.16 Document Reviewed and Approved by the RR-TAG Proposed Cont. to ITU-R WP 5D- Update of WirelessMAN- Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+2) : https://mentor.ieee.org/802.18/dcn/13/18-13-0035-03-0000-proposed- cont-to-itu-r-wp-5d-update-of-wirelessman-advanced-rit-of-rec-itu-r- m-2012-meeting-y-2.zip Rich Kennedy, BlackBerry