RR-TAG (802.18) to Liaison Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0732r0 Liaison July 2015 Rich Kennedy, MediaTekSlide 1 RR-TAG (802.18) to Liaison Report Date: Authors:
Advertisements

Doc.: IEEE /0014r0 & /0425r0 Submission March 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Mar07 IEEE
RR-TAG (802.18) to Liaison Report
RR-TAG (802.18) Liaison Report
IEEE /15 Regulatory SC Macau Closing Report
IEEE /15 Regulatory SC Waikoloa Closing Report
IEEE Regulatory Ad Hoc Committee Closing Report
RR-TAG (802.18) Liaison Report
IEEE Regulatory Ad Hoc Committee Closing Report
ITU-R Terahertz Liaisons ITU-R M.2003 Revisions
IEEE Liaison Report to IEEE
April 2009 doc.: IEEE /xxxxr0 May 2014
to RR-TAG (802.18) Liaison Report
IEEE Regulatory Ad Hoc Committee Closing Report
RR-TAG (802.18) Liaison Report
RR-TAG (802.18) Liaison Report
IEEE Regulatory Ad Hoc Committee Closing Report
IEEE Regulatory SC Waikoloa Closing Report
TGaf Waikoloa Closing Report
ITU-R Terahertz Liaisons ITU-R M.2003 Revisions
IEEE Regulatory Ad Hoc Committee Closing Report
March 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for Mar 2016] Date.
2010 Dallas Liaison Report from
IEEE Regulatory SC Palm Springs DRAFT Meeting Plan and Agenda
IEEE Regulatory Ad Hoc Committee Closing Report
ITU-R Terahertz Liaisons ITU-R M.2003 Revisions
IEEE (RR-TAG) Liaison Report
Liaison Report from Date: September 20, 2012 September 2012
TGaf Geneva Closing Report
IEEE TGaf Waikoloa Closing Report
to RR-TAG (802.18) Liaison Report
IEEE (RR-TAG) Liaison Report
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
IEEE TGaf Dallas Closing Report
RR-TAG (802.18) Liaison Report
IEEE Regulatory SC Waikoloa DRAFT Meeting Plan and Agenda
IEEE Regulatory SC Orlando DRAFT Meeting Plan and Agenda
IEEE Regulatory SC Nanjing Meeting Plan and Agenda
RR-TAG (802.18) Liaison Report
IEEE Regulatory Update Palm Springs 2012
IEEE TGaf Singapore Closing Report
RR-TAG (802.18) to Liaison Report
TGaf Waikoloa Closing Report
RR-TAG Liaison Report May 2009 IEEE
RR-TAG Closing Report Report of the March 2011 Plenary meeting
IEEE Regulatory SC Los Angeles Closing Report
IEEE Regulatory SC Orlando DRAFT Meeting Plan and Agenda
IEEE Regulatory SC Geneva DRAFT Meeting Plan and Agenda
FCC FNPRM Responses Date: Authors: August 2016
RR-TAG Closing Report Report of September 2008 plenary meeting
RR-TAG (IEEE ) Liaison Report
RR-TAG (802.18) to Liaison Report
RR-TAG Liaison Report Mar07 IEEE
[RR-TAG Liaison Report to ]
[RR-TAG Liaison Report to ]
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
RR-TAG (802.18) Liaison Report
Motion – Approve Comments to FCC 6 GHz NPRM
RR-TAG (802.18) Liaison Report
IEEE Regulatory SC Orlando Meeting Minutes
IEEE Regulatory SC DRAFT Teleconference Plan and Agenda
Liaison Report on for May 2018 Meeting
RR-TAG (802.18) Closing Report
FCC FNPRM Responses Date: Authors: August 2016
IEEE Regulatory SC Orlando Closing Report
IEEE Regulatory SC Teleconference Plan and Agenda
IEEE Regulatory SC Atlanta Closing Report
IEEE Regulatory SC Teleconference Plan and Agenda
Presentation transcript:

RR-TAG (802.18) to 802.11 Liaison Report April 2009 doc.: IEEE 802.19-09/xxxxr0 May 2013 RR-TAG (802.18) to 802.11 Liaison Report Date: 2013-05-17 Authors: Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion

April 2009 doc.: IEEE 802.19-09/xxxxr0 May 2013 Abstract This presentation is the liaison report from the RR-TAG for the May 2013 IEEE 802.11 Wireless Interim in Waikoloa. Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion

FCC Documents Reviewed and Approved by the RR-TAG May 2013 FCC Documents Reviewed and Approved by the RR-TAG IEEE 802 response to NPRM FCC 13-22: “Revision of Part 15 of the Commission’s Rules to Permit Unlicensed National Information Infrastructure (U-NII) Devices in the 5 GHz Band” https://mentor.ieee.org/802.18/dcn/13/18-13-0064-06-0000-draft- 802-comments-to-fcc-u-nii-band-nprm-fcc-13-49.docx 44 pages – the record size for an 802.18 Comments document Will require 10-day EC ballot prior to submission Rich Kennedy, BlackBerry

ITU-R Documents from 802.24 Reviewed and Approved by the RR-TAG May 2013 ITU-R Documents from 802.24 Reviewed and Approved by the RR-TAG Annex 3 to Working Party 1A Chairman’s Report “Working Document towards a PDN REPORT ITU-R M.[SMART_GRID]” https://mentor.ieee.org/802.18/dcn/13/18-13-0067-01-0000-draft- contribution-of-ieee-802-on-question-236-1.docx Rich Kennedy, BlackBerry

802.16 Document Reviewed and Approved by the RR-TAG May 2013 802.16 Document Reviewed and Approved by the RR-TAG Proposed Cont. to ITU-R WP 5D- Update of WirelessMAN- Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+2) : https://mentor.ieee.org/802.18/dcn/13/18-13-0035-03-0000-proposed- cont-to-itu-r-wp-5d-update-of-wirelessman-advanced-rit-of-rec-itu-r- m-2012-meeting-y-2.zip Rich Kennedy, BlackBerry