Emittance Diagnostics

Slides:



Advertisements
Similar presentations
ILCDR/CesrTA meeting Low Emittance Tuning 報告 K.Kubo.
Advertisements

Coupling Correction in ATF2 EXT 7 th ATF2 Project Meeting, december 2008 C.Rimbault, LAL Orsay.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
12th January 2006Cockcroft, Liverpool/Daresbury1 ATF, ATF2 and a Beam Diagnostics Section for the ILC ATF, ATF2 and a Beam Diagnostics Section for the.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Mon 03 July 06Laserwire Mini-Workshop1 Using Laserwires to Measure Emittance at the ILC Leo Jenner, Daresbury Labs.
Optics for Skew Correction and Emittance Measurement Leo Jenner This talk is going to look familiar if you were at the recent LC-ABD meeting in Manchester…
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Kicker Optics – or – Selected ATF-II EXT Line Performance Issues ATF-II Technical Review, April M. Woodley1/40.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
1 Experience at ATF To get a low emittance beam Junji Urakawa KEK Circumference: m Arc Cell Type: FOBO Number of Arc Cells: 36 Energy: GeV.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
Laser-wire Measurement Precision Grahame Blair Beijing- BILCW07, 6 th February 2007 Introduction Overview of errors Ongoing technical work in this area.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
Mark Woodley, SLACATF2 Software Review (June 18, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Mark Woodley, SLAC5th ATF2 Project Meeting (December 19, 2007)1 ATF2 Layout/Optics (v3.8) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing.
Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
First analysis results of EXT MW0-4 X,Y,- 10,-10 wire-size measurements to reconstruct the 4D betatron phase-space.
PROBLEM 1 Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
J. Brossard, C. Rimbault a P. Bambade LAL / / 8-9 nov LAL 1 Exercising emittance measurements in the ATF EXT line Upgrade.
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
May 31, 2005Mike Hildreth – ATF 2005 Energy Spectrometry and ATF Components of the nano-BPM Test Program and Plans for Future Tests Mike Hildreth University.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
Status of EXT coupling measurement analysis 9 th ATF2 project meeting C.Rimbault (LAL) S. Kuroda, T. Tauchi, N. Terunuma (KEK), G. White, M. Woodley (SLAC)
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
ILC BDS Alignment, Tuning and Feedback Studies
Expected hardware status and Priority of the commissioning task
Emittance Diagnostics
13th ATF2 Project Meeting Summary
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
EXT Tuning 13th ATF2 Project Meeting, January M. Woodley.
at Royal Holloway Univ. London
Tuning and Alignment of the ATF2
ILC BDS Emittance Diagnostics: Design and Requirements
Beam Optics Set-Up at SLAC End Station A
3rd ATF2 Project Meeting, December 18-20, 2006
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Laser-wire Measurement Precision
Linac/BC1 Commissioning P
Emittance Diagnostics
ATF2 Layout/Optics (v3.6) Existing ATF Extraction Line
Linac Physics, Diagnostics, and Commissioning Strategy P
Y. Nosochkov and M. Woodley (SLAC)
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

Emittance Diagnostics Coupling Correction and Emittance Diagnostics for the ATF2 Extraction Line Coupling Correction / Emittance Diagnostics FONT nBPM (KEK) nBPM (SLAC) ATF Extraction Line ODR Compton / laserwire April 5, 2005 ILC BDS Meeting

Coupling Correction ideally correction section with 4 independent skew quadrupoles, followed by 2D (4 wire scanner) emittance measurement section optics for orthogonal control of the 4 coupling phases minimize εy once with each skew quadrupole in present ATF extraction line non-optimal optics in EXT straight section wire scanners and skew quads interspersed each wire scanner has x, y, and “u/v” (small angle, ~10°) wires one attempt at full 4D beam matrix measurement and correction was inconclusive4 4 See http://atfweb.kek.jp/atf/Reports/ATF-99-01.pdf April 5, 2005 ILC BDS Meeting

“Ideal” skew correction / ε diagnostic section SQ SQ SQ SQ WS WS WS WS – x – y 90° 180° 90° 90° 45° 45° 45° See http://www.slac.stanford.edu/cgi-wrap/getdoc/slac-pub-8581.pdf April 5, 2005 ILC BDS Meeting

– x – y L = 11.43 m April 5, 2005 ILC BDS Meeting 5° 8° 13° 20° 30° WS WS WS WS WS SQ SQ SQ SQ – x – y L = 11.43 m 5° 8° 13° 20° 30° 36° April 5, 2005 ILC BDS Meeting

– x – y L = 20.58 m ΔL ≈ 10 m σWS > 5 μ April 5, 2005 SQ SQ SQ SQ 1.2 1.2 1.7 1.7 1.1 1.3 1.1 0.9 0.9 0.9 0.7 1.3 1.1 WS WS WS WS WS – x – y L = 20.58 m ΔL ≈ 10 m 32° 48° 51° 21° 32° 58° 58° 32° σWS > 5 μ April 5, 2005 ILC BDS Meeting

– x – y L = 15.80 m ΔL ≈ 5 m April 5, 2005 ILC BDS Meeting 31° 40° 41° SQ SQ SQ SQ 0.8 0.7 1.7 1.7 0.6 0.8 0.6 0.5 0.5 0.5 0.3 0.8 0.6 WS WS WS WS WS – x – y 31° 40° 41° 13° 32° 58° 58° 32° L = 15.80 m ΔL ≈ 5 m April 5, 2005 ILC BDS Meeting

A ‘Drift’ e-Diagnostic Section from Paul Emma … b s L w1 w2 w3 3 wire scanners (or profile monitors) April 5, 2005 ILC BDS Meeting

– x – y σmin = 3 μ April 5, 2005 ILC BDS Meeting

Emittance Growth in ILC Upstream Polarimeter/Spectrometer Chicanes April 5, 2005 ILC BDS Meeting

γε/γε0 = 9.610-6 η5 April 5, 2005 ILC BDS Meeting

April 5, 2005 ILC BDS Meeting