1 Update on Water Issues in Wyoming IPAMS Summer 2007 Meeting Vail, Colorado Brian Jeffries Executive Director Wyoming Pipeline Authority.

Slides:



Advertisements
Similar presentations
Land-use Framework Provincial leadership
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
1 Public Utilities Commission of the State of California March 23, 2004 Wyoming Wyoming Natural Gas Pipeline Authority.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Oversight of Metropolitan Districts Department of Local Affairs
1 Colorado Coordinated Planning Group PCC Update March 6-7, 2008.
Metropolitan Transportation Authority July 2008 Financial Plan MTA 2009 Preliminary Budget July Financial Plan 2009 – 2012 DJC.
This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could.
1 Providers Perspective on the Future Bill Levis President, PSEG Power Bill Levis President, PSEG Power.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 NORTH CAROLINA COUNCIL OF INTERNAL AUDITING October 31, 2007.
Storm Water General Permit For Construction Activities(OKR10) Stakeholder Advisory Committee Meeting December 15, 2011 Watershed Planning and Storm.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Steve Crawford, M.Sc Environmental Director 1. Overview and Background Tribal energy mission statement: To be 100% self- sufficient in energy, while safeguarding.
Still River Study Sponsored by Friends of the Lake Presented by Curtis Read November 17th, 2005.
Ontario Low Water Response (OLWR)
Delaware State Housing Authority FY 15 Joint Committee On Capital Improvement Public Hearing February 11, 2014 Delaware State Housing Authority 18 The.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Water in the West: Current Use and Future Challenges Christopher Goemans, Ph.D. Agricultural and Resource Economics 13 th Annual Farmers Cooperatives Conference.
SB 192 – Oil and Gas Production Tax Rate/Credit Sponsored by Senator Bert Stedman Senate Resources April 9, 2014 SB 192 Senate Resources Presentation by.
Turning a Water Plan into Water Dan Hardin, Director of Water Resource Planning.
Risk Management and Optimal Contract Structures for the CCS-EOR* Value Chain Anna Agarwal, John E. Parsons Center for Energy and Environmental Policy Research.
IAS 11 - Revenue recognition for construction contracts
SPE The Potential For Additional Carbon Dioxide Flooding Projects in the United States SPE April 23, 2008 Hitesh Mohan – INTEK, Inc. Marshall.
Energy Security Sustainable, Affordable, Reliable, Access to Diverse Energy Supplies Wealth/Power/Influence Market Dynamics Energy Frontiers Spare Capacity.
1 Meeting carbon budgets – 5th Progress Report to Parliament Committee on Climate Change, June If you want to tweet about this report.
Chapter 9 Capacity Decisions IDS 605 Spring 1999.
1 Wyoming Labor Market Information – Theres a Website for That! Presented by Sara Saulcy, Senior Economist Wyoming Department of Workforce Services Research.
Our Corporate Motto “WE DON’T PASS GAS”
The Oil Majors and the US Geo- Strategy in Eurasia after the End of Cold War Anthony Livanios CEO Energy Stream CMG GmbH January 21, 2014.
Methane Gas in Coal Mining SA June 18 – 21, 2012 Barry Stevens, Ph.D. President TBD America, a Technology Business Development consulting group 2011.
CREA Energy Innovations Summit Coal Mine Methane Electric Power Generation 1 Julian Huzyk Project Manager Vessels Coal Gas, Inc. 3MW LLC & North Fork Energy.
© S Haughton more than 3?
1 (of 22) FIN 468: Intermediate Corporate Finance Topic 5–Free Cash Flow Larry Schrenk, Instructor.
Green Completions Lessons Learned from Natural Gas STAR Producers Technology Transfer Workshop ExxonMobil Production Company, American Petroleum Institute.
First Solar FuelSmart™: Powering Energy Security
Squares and Square Root WALK. Solve each problem REVIEW:
Superintendent’s Proposed FY 2013 – FY 2022 Capital Improvement Plan May 10, 2012.
Chapter 5 Test Review Sections 5-1 through 5-4.
Coal to Liquids Plant Site Selection in WV Douglas G. Patchen October 25, 2007.
1CPEAC/EHC CONFERENCE – 8 March 2009 Alberta & Oil: Where it has been and where it is heading for? Peter Yang, M.Sc., P.Eng. Manager, SAGD Specialist Group.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
Douglas County School District Re.1 Preliminary Budget Fiscal Year 2010 – 2011 Presented to the Board of Education Tuesday April 20, 2010.
14 th Annual International Legislators Forum EPA Carbon Regulation June 26, 2014 Eric J. Olsen Vice President and General Counsel Great River Energy.
Engineering Economics II Choices Between Alternatives
The McGraw-Hill Companies, Inc., 2000
May 22, 2012 How We Managed an Oil Boom Williston Basin Petroleum Conference Presented by Cindy DeLancey.
Jason Henderson Vice President and Branch Executive Federal Reserve Bank of Kansas City – Omaha Branch June 16, 2009 The views.
“Perspectives on Montana’s Petroleum Industry” MREA-MPA-MONTAX “Bridges to the Future” Conference October 15, 2009 Dave Ballard President Ballard Petroleum.
1 Legislative Session February 17, Proposed Legislative Changes Increase WPA bonding capacity from $1 billion to $3 billion Expand State Treasurer’s.
National Governors’ Association April 5, 2001 James Mahoney PG&E National Energy Group and any other company referenced herein which uses the PG&E name.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Wyoming Enhanced Oil Recovery Institute Joint Producers Meeting CO 2 in Wyoming June 26, 2007 Casper, WY Brian Jeffries Executive Director Wyoming Pipeline.
1 Water Resources Management - DEQ’s Role in Water Supply - State Water Commission October 1, 2002.
Rocky Mountain Production and Pipeline Capacity 2004 BLM National Fluid Minerals Conference June 24, 2004.
Presentation transcript:

1 Update on Water Issues in Wyoming IPAMS Summer 2007 Meeting Vail, Colorado Brian Jeffries Executive Director Wyoming Pipeline Authority

2 What is the Wyoming Pipeline Authority? Board of Directors appointed by Governor Mission (i) to promote the infrastructure necessary to produce oil and gas assets of the state and (ii) to promote access to high value markets If it can move in a pipeline, its within our charter Bonding capability to $3 Billion Not a regulatory, enforcement, rate making or policy setting body

3 Issue - Authority over water quantity Topic of proposed bill in legislature – DEQ to regulate quantity of water in association with permit (SB 55) Topic of proposed regulation developed by Environmental Quality Council (EQC) Opinion of State Attorney General – the State Engineer has authority – Governor vetoed regulations proposed by EQC Petitioners appealing to State District Court

4 Quantity response State Engineers Office considering regulations Requirement that channel have sufficient capacity to receive projected quantity Limitations on discharges to channel capacity Presented possible statute language at May 30 th Coal Bed Methane Task Force Meeting

5 Issue - Water/Gas Ratio According to Wyoming Geological Survey, 18% of wells two years or older have a W/G ratio above 10. Roughly 10% have a ratio above 20 What ratio over what period of time should be allowable for a given well?

6 Water Gas Ratio Response State Engineer considering limitations on permits Presented possible statute language at May 30 th Coal Bed Methane Task Force Meeting Review of W/G ratio after initial period of time (2 years?) W/G ratio required below threshold to automatically retain permit?

7 Issue – Watershed based permitting process Alternative to company by company permitting Would yield generic permit with conditions applicable to all operators Twelve step process Willow Creek and Pumpkin Creek initial candidates Industry and environmental groups appealed result

8 Proposed Water Pipeline WPA seeking support for a 1 Million Barrel per day pipeline from central location in Powder River Basin Steel or HDPE pipeline - 42 Two potential destinations – Madison Formation in Teapot Dome Field, North Platte near Casper.

9 How much water? Source: WOGCC and Coal Bed Methane Task Force

10 What does 1 MM BBls per day or 47,000 acre-ft/yr or 64 cubic feet per second look like?

11 Water conversions 1 MM barrels/day = 42 MM gallons/day 42 MM gallons/day = 5,615 mcf/day 5,615 mcf/day = 64 cfs

12 Teapot Dome Field Casper

13 Water Pipeline – steps taken Initial high level engineering review Two rates developed, one for Teapot Dome one for North Platte Gross assumptions for rate design – 100% debt, ten year debt retirement, project full on day one and full for ten years.

14 Water Pipeline – commercial steps taken Non – binding expressions on interest sought around two rates Four responses so far, two responded with quantity, one reflects need for different alignment, one is not interested Awaiting additional responses Answers depend on determination of drilling plans etc.

15 What is the appeal of the pipeline? Producers - Economic and regulatory certainty State – no trans-basin diversion issue (Teapot Dome), no state line water quality issue, no surface discharge issue, added opportunities for conservation and utilization

16 Rocky Mountain Oil Field Testing Center – revenue, EOR applications Other parties – Municipal use, augment stream flows, power plant use, IGCC, Coal to liquids plants, ag use. (credit to cost of service to producers from income) Storage in Madison provides for extended application of water beyond dictates of water production timeline What is the appeal of the pipeline?

17 Questions define next steps Is there enough producer interest based on next best alternatives? Can this be a water development project? Can we have access to the $500K appropriated by the legislature? Every day delayed is a day of water lost to amortize the costs.

18 Water Pipeline – points to consider When can the pipeline be in service? How reliable is the rate estimate? Does this exclude other solutions? Does the State support of the idea? Answers to follow