Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear

Slides:



Advertisements
Similar presentations
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
Advertisements

DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
Ensure Vendor/Engineer of Choice Product Quality
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Genius online Appraisal Management System 1. Appraiser Configuration Getting Started Appraisal Management let the user to effectively conduct a users.
Database Administration
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Ground Control™ Document Control and Training Manager
Doc Document Management Systems For Manufacturing Industry Infocrew Solutions Pvt.Ltd.
Basics of Good Documentation Document Control Systems
Overview of Change Management ClearQuest Overview for CORUG January, 2008.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
DEVELOPING WEB TRANSACTIONAL CAPABILITIES IN ATF ATF’s E Filing Strategies.
Enterprise Content Management Identifying and Addressing New Areas of Cost Reduction How to use this PowerPoint template: 1.Insert these slides onto your.
11 Configuration Management Site Configuration Management Case Study.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Westinghouse/Southern/SCANA – New Build Configuration Management
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
7-1 Computerized Accounting Systems Electronic Presentation by Douglas Cloud Pepperdine University Chapter F7.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Electronic Design Change Process Paul Tobin Jr.- PKMJ Technical Services.
Impact Research 1 Enabling Decision Making Through Business Intelligence: Preview of Report.
ITIL® Service Asset & Configuration Management Foundations Service Transition Thatcher Deane 02/17/2010.
Education Solution.
Standard Design Process Overview
1 ECM APPLICATIONS AND SOLUTIONS - PART 1 MODULE 8 ECM SPECIALIST COURSE 1 Copyright AIIM.
Standards Certification Education & Training Publishing Conferences & Exhibits Automation Connections ISA EXPO 2006 Wed, 1:00 Oct 18.
Introduction to CMIS, an Electronic Design Change Process Presented by: Mark Gillis (FirstEnergy) and Brad Diggans (Rolls-Royce)
Enterprise Processes and Systems MIS 2000 Instructor: Bob Travica Updated 2016 Class 16.
Database Principles: Fundamentals of Design, Implementation, and Management Chapter 1 The Database Approach.
People Inc. from P&A Software
Design Oversight Working Group (DOWG) – Next Steps
Standard Design Process (SDP) Interfacing Procedures Ashley Taylor TVA
ITIL: Service Transition
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Contract Management Software
Software Project Configuration Management
SDP Software Presented by Bill Clover and Brad Diggans Bill Clover
Network Interface Panel Proposition
Fundamentals of Information Systems, Sixth Edition
Standard Operating Procedure (SOP) Management Software
Chapter 18 Maintaining Information Systems
TechStambha PMP Certification Training
Standard Design Process (SDP) Change Management Ashley Taylor TVA
Project Roles and Responsibilities
ENTERPRISE BUSINESS SYSTEMS
CIS 515 STUDY Lessons in Excellence-- cis515study.com.
Best Practices: AP Automation for GP Dan Thomson
Systems Design, Implementation, and Operation
Project Plan Template (Help text appears in cursive on slides and in the notes field)
Cover.
New Alma Customer Onboarding Preparation and Best Practices
Best Practices: AP Automation Dan Thomson
Website Content Management System
PROJECT MANAGEMENT Bill Biddle.
Electronic CM Processes
People Inc. from P&A Software
Document Update Benchmark results
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
SNC/SCANA – New Build Configuration Management
Design Oversight Working Group (DOWG) Status Update
E-Lock ProSigner ProSigner means “Professional Signer” signifying the software that can apply legally enforceable Advanced electronic signatures to electronic.
FSAR Configuration Control at PPL Susquehanna, LLC.
About this Template Dear Colleague, This template is provided by Valooto to help you communicate the facts about your need for a CPQ (Configure Price Quote)
Big Data for Nuclear Power Plants Shawn St. Germain – INL
Final Design Authorization
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
OBSERVER DATA MANAGEMENT PRINCIPLES AND BEST PRACTICE (Agenda Item 4)
Presentation transcript:

Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear

Agenda – SDP Software General Requirements Specific Software Considerations Challenges and Lessons Learned SDP Panel Preview

SDP Software - General Requirements SDP Efficiency Bulletin 17-06 “The industry procedure IP-ENG-001, Standard Design Process, provides a streamlined and graded approach to the design change process. This initiative also suggests the use of standardized (i.e. compatible reader) software to facilitate compatibility and training to support implementation of the new process. …” Desired end-state— “The standard design change procedure IP-ENG-001, supported by standardized software, is used across the industry to the benefit of each stakeholder. …”

SDP Software - General Requirements (cont.) SDP Efficiency Bulletin 17-06 Value proposition (vision of excellence)— “…Standardized software to facilitate compatibility will streamline the implementation of the new procedure.” Measure of effectiveness— “…Sharing of engineering changes: Utilities will post their design change abstracts in the software tool located on shared electronic database that will facilitate sharing throughout the industry. …” Company Actions “…Project plan for implementation of the company’s chosen standardized design software (i.e., base software package as a minimum) by December 31, 2018*. …” *Note: Due date is based on draft Rev. 1 of EB.

SDP Software - General Requirements (cont.) Summary of General Requirements EB 17-06 does not mandate any one specific software solution Standardized, compatible reader software (e.g., can output to pdf or other compatible format) Supports posting of design change abstracts to facilitate industry sharing Implement base software package as a minimum (i.e., interfaces with other utility software applications are optional)

Specific Software Considerations Automation of the SDP Where Possible Design Attribute Review (use software to identify impacts, build Department Interfaces table and trigger review actions) Change Package Development and Approvals (enter data in software which produces electronic forms and signatures) Impact Reviews and Meetings (use software to track reviews, initiate and manage meetings) Review Comments (reviewers provide comments electronically, versus use of hardcopy form) Industry Sharing (auto-generate, populate, share EC abstract) Field Change Requests, Advance Work Authorization Cloning / Copying of ECs

Specific Software Considerations (cont.) Interfaces with Other Utility Software Applications Enterprise Asset Management System (such as for Modification Requests, ECs, Work Orders, Affected Documents, Affected Components, etc.) Electronic Document Management System (such as for EC Record File, Document Markups, Document Images, etc.) Other Software Applications

SDP Software - Challenges and Lessons Learned Need to Have Clear Understanding of Current Utility and New Software Process Workflows (for ECs, Documents, etc.) to Ensure Proper Integration Need to Engage IT and Business Support Personnel Early in the Process and Develop Realistic Schedule Contract with software vendor (approvals may take time) Interfaces (may require significant and varied resources to configure) Configuration of user IDs and authentication against single sign-on management system (if applicable) Software testing

Software Panel Preview Representatives from Software Pilot and Other Utilities That Have Implemented (or are Implementing) SDP Software Solutions of Various Types TVA Exelon Southern Nuclear Ameren Energy Northwest Discuss Experiences Relative to SDP Software Implementation, Including Key Insights and Lessons Learned Answer Questions

QUESTIONS?