BUILDING PROCESS STAGES

Slides:



Advertisements
Similar presentations
HOW SIFA WORKS. Step 1 Plans are given to Restaurant & Bar Solutions These can be on CAD, or even hand drawn, with dimensions and ideal layout.
Advertisements

WHAT IS AN APPRENTICESHIP? COOP AND OYAP HOW TO FIND AN APPRENTICESHIP? CAN’T FIND AN APPRENTICESHIP? QUESTIONS.
Constructionsite Construction Procedure Ron Gatepain.
Building Drawings and Symbols
Planning & Monitoring. The Purpose of Planning and Monitoring To ensure that the project is produced on time, within the cost constraints and at the quality.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
1 Google > Dave Inman > Projects Stages of a Final Year project.
Crafting an IS/IT project proposal Ronan Fitzpatrick Dublin Institute of Technology.
Session 7 Page 11 ECE361 Engineering Practice Brainstorming, Trades, Evaluation, and Conceptual Capture.
Standard Grade Graphic Communications
Construction Procedure. Identifying potential site Initial site appraisal Initial feasibility study Discussion with statutory bodies Detailed feasibility.
WRITING A RESEARCH PROPOSAL. RESEARCH PROPOSAL Any research study should have a proper proposal in written form before it is actually carried out It is.
Dr. V M Patel (Principal) Shankersinh Vaghela Bapu Institute Of Technology B.E. (Civil), M.E. (Structure – Gold Medal), Ph.D. ISTE, GICEA, ISES, AMIE,
E-Commerce Project Sixth Lecture Mohammed Antour
9-2  Problem: a discrepancy between the current state – what actually is happening – and a desired goal – what should be happening  Undesirable situation.
E-Commerce Project Second Lecture Mohammed Antour
Unit4-IT Project BTEC NATIONAL – UNIT 4 Project Management MS PROJECT.
Specification & Quantities Estimating
BUILD UP Skills Slovenia IEE Skills4SB.SI - Building Skills for Sustainable Building in Slovenia Slides created on:Nov. 15, 2013 Contract N°: IEE/11/BWI/519/SI ,
Management & Development of Complex Projects Course Code MS Project Management Project Life Cycle & PM Process Groups Lecture # 4.
Design Proposal A document prepared to (a) justify the need for the project, (b) describe the engineering process to be taken, (c) outline the expected.
Production Organization and Management Staff
E-Commerce Project Fifth Lecture Mohammed Antour
Project Scheduling Class 7.
G053 - Lecture 06 Website Development Stages Mr C Johnston ICT Teacher
Theatre Organization and Jobs Chapter 1 Theatrical Design and Production Pages 6-21.
Unit 210: How to communicate with others
Understanding the non-completion of apprentices Alice Bednarz 60% of apprentices leave their contract in the FIRST year 2009 only 47% of apprentices completed.
CAREER OPPORTUNITIES CO-TEACHING LESSON PLAN SE301 2/15/16 8 TH GRADE TEAMING MODEL RHONDA PRINGLE (GENERAL EDUCATION TEACHER) (SPECIAL INTERVENTION TEACHER)
Work Plan for F.3 Biology Project Stage oneSubmission of Proposal.
Contract and Tender form Phases of Designing Phases of Implementation VIA / TCU 4th semester workshop S2016 Contract and Tender form S2016 VIA University.
Work Plan & Budget PubH325, GWU Global Social Marketing Brian Pedersen, MPH November 30, 2009.
The first College of Advanced Technology in the UK. About PROCAT The first College of Advanced Technology in the UK. Did you know? The largest apprenticeship.
CE 332 – Construction Engineering and Management
Session 1: Construction Opportunities; Problem Solving
Project Planning & Scheduling
Class 6 – Scope Management
(Refer to Chapter 2 of the textbook)
Business System Development
Project Management Software Application PRM 705
Project Planning & Scheduling
Cisco Lifecycle Services Advanced Security Exam Code: practice-questions.html.
GCE Applied ICT G053: Lesson 05 Website Development Stages
COST PLANNING AND ESTIMATION
The project's conception: A feasibility study is done
Awarding Criterion for late tender: the lowest bid- why?
Pre-contract Planning and Practice
Construction Materials and Workmanship
BUILDING PROCESS STAGES
Scheduling Project Assignment 3 Team A.
Creating a Strategic Plan for Research and Scholarly Activity
Creating a Strategic Plan for Research and Scholarly Activity
Time schedule for implementation as main contractor
Back Ground Information
The project´s specifications, and the connection between the contract´s different specifications.
Final exam VIA / TCU 5th semester workshop VIA University College
TCU-PROJECT: 7TH Semester Course
Welcome to the 5th semester
Planning assignment in MS-Project
QUANTITIES Taking out quantities
Contract and tender form Phases of designing Phases of implementation
Recap QUANTITIES Taking out quantities
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Final student growth rating based on work
Welcome to the 4th semester Intro to S2017
Welcome to the 5th semester
6th. Semester Schedule: 1st. Week
Machinery and equipment continued
The Form of Procurement for the EcoHome Project
QUANTITIES Taking out quantities
Presentation transcript:

BUILDING PROCESS STAGES WELCOME To the lecture on BUILDING PROCESS STAGES Problem based Learning _ Introduction Jan Wolff TCU S 2017 27/12/2018

OF THE BUILDING PROCESS BEGINNING? OF THE BUILDING PROCESS END? Problem based Learning _ Introduction Jan Wolff TCU S 2017 27/12/2018

THE PROCESS STEP BY STEP STAGES ALSO CALLED Problem based Learning _ Introduction Jan Wolff TCU S 2017 27/12/2018

STAGES TENDER HANDING OVER OPERATION DESIGN CONSTRUCTION Problem based Learning _ Introduction Jan Wolff TCU S 2017 27/12/2018

THE DESIGN STAGES BRIEF OUTLINE SCHEME D DD 1 DD 2 DESIGN BRIEF = THE CLIENTS IDEA / PROGRAMME OUTLINE = PROPOSAL FOR THE BUILDING SCHEME DESIGN = ADVANCED PROJECT DD1 = DETAILED DESIGN 1 FOR AUTHORITY DD2 = DETAILED DESIGN 2 FOR TENDER Problem based Learning _ Introduction Jan Wolff TCU S 2017 27/12/2018

CONT. MOBIL. RIG PROD. UNRIG THE CONSTRUCTION STAGES (IMPLEMENTATION) CONT. = CONTRACT MOBIL. = MOBILIZATION RIG = RIGGING (SETTING UP) THE SITE PROD. = PRODUCTION (CONSTRUCTION) UNRIG = CLEARING, LEAVING THE SITE Problem based Learning _ Introduction Jan Wolff TCU S 2017 27/12/2018

TRADES SOIL WORK (SOIL WORKER) CONCRETE (CONCRETER) CONSTRUCTION TRADES SOIL WORK (SOIL WORKER) CONCRETE (CONCRETER) SEWAGE (SEWAGE WORKER, PLUMBER) BRICKWORK (BRICKLAYER, MASON) CARPENTERY (CARPENTER) ELECTR. INSTALLATIONS (ELECTRICIAN) MECH. INSTALLATIONS (SERVICES) DECORATION (DECORATOR) Problem based Learning _ Introduction Jan Wolff TCU S 2017 27/12/2018

TODAY’S ASSIGNMENT (EXAM) CHOOSE 20 ACTIVITIES EACH GROUP WRITES 2 ON BOARD TEACHER PROVIDES DURATION ASSIGNMENT MAKE A BOX DIAGRAM MAKE MS PROJECT GANTT CHART ALLOCATE ACTIVITIES TO TRADES Problem based Learning _ Introduction Jan Wolff TCU S 2017 27/12/2018

DEADLINE 16.03.2018/24:00 ASSIGNMENTS MAKE A BOX DIAGRAM MAKE MS PROJECT GANTT CHART ALLOCATE ACTIVITIES TO TRADES DEADLINE 16.03.2018/24:00 Problem based Learning _ Introduction Jan Wolff TCU S 2017 27/12/2018