Decisions and Recommendations for the

Slides:



Advertisements
Similar presentations
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
Advertisements

WMO WMO Integrated Global Observing System (WIGOS) CBS EXPERT TEAM ON AIRCRAFT-BASED OBSERVING SYSTEMS 1st Session (Geneva, September, 2013) Dr I.
World Meteorological Organization Working together in weather, climate and water WIGOS Framework Implementation Plan RA VI WORKING GROUP ON TECHNOLOGY.
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Cg-17, Agenda Dr S. Barrell, Chair, ICG-WIGOS WMO; OBS.
Observing System Capability Analysis and Review Tool (OSCAR) Detailed functions WIGOS Project Office WMO; Name of Department (ND)
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) TT-PWPP-2 Chair's Opening Remarks WMO; OBS.
WMO Moving from the WIGOS Framework towards the Pre-operational Phase A. Makarau President of RA I.
WMO ICG-WIGOS-5 GENEVA, SWITZERLAND, JANUARY 2016 Bertrand Calpini, Co-Chair ICG-WIGOS, CIMO President ICG-WIGOS >>> Our next challenges.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) ICG-WIGOS-5 Opening Remarks Sue Barrell, Co-Chair ICG-WIGOS WMO; OBS.
WMO WIGOS Pre-operational Phase Regional & National Perspectives Tyrone W. SUTHERLAND (BCT, EC FP for WIGOS)
© Crown copyright Met Office Report of the Chair Stuart Goldstraw, UK Met Office, Chair ET-SBO-1, July 2013.
Monitoring Tools Timo Pröscholdt WMO; DRA. Today  Report  Timeline  Outlook.
ICG-WIGOS-6 Report from the Commission for Basic Systems
The WIGOS Pre-operational Phase ( )
WIGOS Pre-operational Phase
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
WIGOS regulatory and guidance material
WIGOS IMPLEMENTATION LEAD BY WORKING GROUP ON INFRASTRUCTURE
Concept Proposal for RA-III Regional WIGOS Centre
WIGOS Data Quality Monitoring System (WDQMS)
Regional WIGOS Centres
In partnership with GCOS
Ivan Čačić President RA VI
OPAG on Integrated Observing Systems
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
ET-SBO Report to ICT-IOS-9
5th Session of the Task Team on WIGOS Metadata
Regional Basic Observing Network Co-chair, CBS/OPAG-IOS
Sue Barrell, Bertrand Calpini
Document 5.4.1(3) Observing System Design and Evolution
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
EC-68 DOC 16.3 GOVERNANCE REVIEW
Regional WIGOS Centres
WIGOS Pre-operational Phase
WIGOS Pre-operational Phase
Roadmap to Enhanced Technical Regulations of WMO
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
4.2(2) WIGOS Editorial Board (WEdB)
WIGOS implementation in RA II
WIGOS Project Office, WMO Secretariat
WIGOS Pre-operational Phase in RA I (Africa)
OSCAR/Surface (User Perspective)
Overview of the WMO Integrated Global Observing System (WIGOS)
Doc (1) Vision for WIGOS in 2040
Dr Sue Barrell, Australia
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
OSCAR/Surface, Vol. A, and the WMO Members
(Etienne Charpentier, WMO Observing Systems Division)
REPORT on RWCs in RA VI Ivan Čačić President RA VI ICG-WIGOS-7
OSCAR/Surface – and all you ever wanted to know about it
Co-chair Introduction
the Commission for Basic Systems (CBS) perspective
Decisions on the development of WIGOS and the Space Programme
Monitoring System (WDQMS)
Workshop (… 2016) WIGOS Project Office
WIGOS Pre-Operational Phase;
Guidance on WIGOS Data Partnerships Draft v1.0
WIGOS regulatory and guidance material
The WIGOS Pre-Operational Phase
WIGOS - Regional and National Implementation Planning
Document 5.4.1(4) Regional Basic Observing Network (RBON) Concept
The status and Plan in 2019 for the WIGOS centers in RA II
WMO new mini site for the GSICS Portal
SIG RFC 2019 Relevant Summary
ICG-WIGOS, eigth session, Jan 2019
Inter-Commission Coordination Group On WIGOS
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Co-chair Introduction
WMO Global Campus: Open Educational Practice in Action
Presentation transcript:

Decisions and Recommendations for the Observing Systems Capability Analysis and Review Tool (OSCAR) CBS-16/Doc. 5.4.1(2) cbs-16@wmo.int

Decisions/Actions Required Adopt draft Decision 5.4.1(2)/1 — Responsibilities of the oversight and review of OSCAR; Adopt draft Decision 5.4.1(2)/2 — OSCAR maintenance and resourcing; Adopt draft Recommendation 5.4.1(2)/1 — Submission and maintenance of WIGOS Metadata in OSCAR by Members; Adopt draft Recommendation 5.4.1(2)/2 — Training on OSCAR/Surface. cbs-16@wmo.int

Draft Decision 5.4.1(2)/1 (Responsibilities of the oversight and review of OSCAR) OSCAR is one of the five priorities of the WIGOS Pre-operational Phase EC-68: re-established ICG-WIGOS, ToR include coordination of further development of the WIR, with special emphasis on OSCAR; ICG-WIGOS-5: Task Team on OSCAR Development; ToR include overall coordination and leadership of OSCAR, in liaison with relevant CBS ETs; ICT-IOS-9: Recommendation regarding oversight and review of OSCAR; [The Commission …] decides to assign responsibility within CBS for the technical development of OSCAR as detailed in Table 1 of the Annex to this Decision cbs-16@wmo.int

Draft Decision 5.4.1(2)/2 OSCAR maintenance and resourcing Members [… urged …] to provide resources (WIGOS Trust Fund, seconded experts), to assist with the operational deployment of OSCAR/Surface, and to support the translation of guidance and manuals OSCAR/Requirements and OSCAR/Space play a key role in the RRR process The integration of OSCAR with the WIGOS Data Quality Data Monitoring System (WDQMS), will provide substantial benefits to Members; NFPs for OSCAR/Surface have a crucial role in its operational deployment cbs-16@wmo.int

Draft Decision 5.4.1(2)/2 OSCAR maintenance and resourcing […] Secretariat [to] continue to carry out the function of maintenance and further development of the three components of OSCAR (OSCAR/Surface, OSCAR/Space, OSCAR/Requirements), and [to ensure] that contributions from Members to this effort be actively solicited, for example, in the form of secondments or financial resources to the WIGOS Trust Fund. cbs-16@wmo.int

Draft Recommendation 5.4.1(2)/1 Submission of WIGOS metadata by Members Per WIGOS Regulatory Material (WIGOS Metadata Standard), WMO Members obligated to exchange mandatory and conditional WIGOS metadata for observations that are exchanged internationally Members requested to submit metadata to OSCAR/Surface, as this is the implementation layer of the WIGOS Metadata Standard Some Members operate own databases of WIGOS metadata for their observing systems; development of machine-to-machine interfaces for the exchange of metadata between existing databases and OSCAR is therefore essential cbs-16@wmo.int

Draft Recommendation 5.4.1(2)/1 Submission and maintenance of WIGOS MD in OSCAR by Members Recommends that Members submit to OSCAR all the WIGOS MD […] Urges JCOMM to ensure fully compliance with WIGOS Metadata Standard and facilitate ingestion of WIGOS metadata in its database […] Urges Members operating their own databases of WIGOS metadata to develop and implement procedures for the use of the machine to machine interfaces with OSCAR cbs-16@wmo.int

Draft Recommendation 5.4.1(2)/2 Training on OSCAR/Surface OSCAR/Surface is a new tool for WMO Members The period of transition from WMO no. 9, Vol. A, to OSCAR/Surface runs from May 2016 to the end of 2017 Operational uptake of OSCAR/Surface critical to success of WIGOS At this point still only a few WMO Members have received any training on the use of OSCAR/Surface OSCAR training is therefore a high priority item cbs-16@wmo.int

Draft Recommendation 5.4.1(2)/2 Training on OSCAR/Surface Recommends: Adoption of the Training Plan for OSCAR/Surface […] The Secretary General to: (a) Develop training materials, specially e-learning modules on OSCAR/Surface; (b) Develop and deliver OSCAR/Surface training events to Members; (3) Regional associations to contribute to the effort […] (4) The WMO ETR Department to work closely with the RTC and WIGOS Project Office to organize and deliver training events according to the OSCAR/Surface Training Plan Urges Members to contribute to this effort [… via …] expertise and resources cbs-16@wmo.int

Thank you cbs-16@wmo.int