16th annual regulatory update conference November 17, 2017 Air permitting 16th annual regulatory update conference November 17, 2017 Mike Adhanom, Section Chief, Division of Air Quality
New General Permits (GPs/GOPs) GP-017A Boiler(s) and/or Heater(s) Each Less Than 5 MMBTU/hr GP Available since March 20, 2017 GP-018A Boiler(s) and/or Heater(s) Each greater than or equal to 5 MMBTU/hr and Less Than 10 MMBTU/hr; and GP Available since August 07, 2017 GOP-008 Boiler or Heater greater than or equal to 5 MMBTU/hr Less Than 10 MMBTU/hr; GOP Available since August 07, 2017 PDF approvals - GPs and GOPs registration submittals and approvals PDFs
GPs and GOPs under construction GP-016A and GOP-002A - Manufacturing and Materials Handling Equipment (Former SEGAP) Replacing: SEGAP (GP-016 and GOP-002A) Confined Abrasive Blasting Equipment (GP-002) Woodworking Equipment (GP-003) Availability Date : December 04, 2017 GP-004B - Fuel Dispensing Facilities equipped with Phase I (Stage I) Rule change (N.J.A.C.7:27-16.3) Public Comments: November 6, 2017 Availability Date : January, 2018
GPs and GOPs under construction GP-009B - Boiler(s) and/or Heater(s) Each greater than or equal to 10 MMBTU/hr and Less Than 50 MMBTU/hr; AND GOP-009 - Boiler or Heater greater than or equal to 10 MMBTU/hr Less Than 50 MMBTU/hr; GP-015A – Plating Operations Federal Rule Change (40CFR63 Subpart 6’Ws)
HELP LINES General Permits (609) 633-2829 Operating Permits (609) 633-8248 Pre-Construction (609) 292-6716 RADIUS (609) 633-8250