Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Advertisements

Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Jaak Lippmaa HIP, Helsinki University
LCWS11 AWG9 PARALLEL SESSION SUMMARY
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Oversight Board Meeting October 3, 2017 Rob Michnoff
TBL, Status, Plans, Experiments
Communication and Documentation Needs exemplified on WP 71
SCU Next Phase Meeting July 8, 2014.
Beam Finder Wire Assembly Undulator System
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
ELENA Magnet Installation Planning
LTU/Undulator Installation Status
A Cold SCU Phase-Shifter
Beam-Based Alignment Results
Linac Coherent Light Source Procurement
Undulator Scope, Management, and Organization
Experimental equipment Edgar L. Black February 17, 2019
Undulator System Components Status Dean Walters
High Level Physics Applications for LCLS Commissioning
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
LCLS Undulator System Production Management
Undulator Scope, Management, Organization
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
LCLS Injector System Overview D. H
Undulator Long-Lead Procurement Preparation
Undulator System Overview
Fixed Support Design & Testing
Electron Beam Systems ETC and Methodology
Undulators Subgroup Summary April FAC Review K. Robinson, J
LCLS Undulator System Detailed Report
Undulator Assembly and Installation Planning
LCLS e- Beams System Overview
Undulator and Magnet Production Status 25 October 2006
CF Scope, Management & Organization
Breakout Session SC3 – Undulator
e-Beams Systems Update
Electron Collider Ring Magnets Preliminary Summary
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS e- Beams Systems Manager
Presentation transcript:

LCLS Undulator System Detailed Report Facility Advisory Committee Meeting 12 October 2006

Focus of this Talk Will Not Will Focus on the successes We have had many and all major ones either have already been reported briefly at the plenary session or will be reported by the various speakers Will Focus on where the committee might be of help I am focused now on making certain we deliver all components on time, within budget and to specification Discussion of topics not yet presented to the committee or not being presented by others

Focus On Controls Vacuum Chamber Quadrupoles Major Contracts Interface Definitions Transfer of Information Vacuum Chamber Project management point of view Parallel Efforts Physics Viewpoint Quadrupoles Hysteresis Effects Delivery Schedule Major Contracts Creation Management Beam Loss Monitor Status

Controls SLAC now fully in the lead but Recent estimate to completion exercise and rework of the P3 schedule leaves many opportunities for dropped balls. Need to set up a detailed compilation of all controls items and responsibilities. This needs to be handed to SLAC controls so that they understand what it is that is required of them. Need to sit down with SLAC controls and go through in detail what is in the schedule. Hamid is Very Busy Suggest creating a SLAC/ANL Controls liaison person much like we have for all the mechanical items. This person would work directly with the ANL LCLS controls technical lead to ensure than the controls interfaces and exchange of information proceeds seamlessly.

Project Management Point of View Vacuum Chamber Project Management Point of View The prototype delivery date continues to slip. At this point if the prototype has a real problem then we have little or no time to correct for it. Right now the vacuum chamber is roughly 20 days off from driving the assembly, but it is significantly further away from driving the project critical path.

Vacuum Chamber Parallel Efforts SLAC is pursuing a plan C. ANL will not participate in this effort as we need to remain entirely focused with the resources that we have on completing the chamber as planned. ANL is looking into a plan C’ In a recent discussion with Murray Gibson we decided that ANL could look into a plan to use an extrusion. This might not take as long as one might guess. We will not allow it to distract any resources from existing work either on the vacuum system or any other LCLS system

Vacuum Chamber Physics Viewpoint Difficult requirements Effect on beam Some even difficult to define clearly Effect on beam May be difficult of impossible to ever determine Non-unity Permeability of SS Will impact field but more or less uniformly As long as the random variation of K/K between undulators is kept below 1.5e-4 then the requirement is met A slight increase in the overall field should not matter. Choice of Steel (low permeability under all conditions) 316LN difficult to obtain locally. Some availability in Europe. 20Cb-3 Available locally and with short lead time.

Capenter Steel 20Cb-3 Specifications Found Online We Find Electrical Properties Electrical Resistivity 0.0001082 ohm-cm Magnetic Permeability 1.002 Magnetic Permeability 1.01

Quadrupoles Hysteresis Effect Corrector coils act in “common” while quadrupole coils act differentially across poles Places poles on different hysteresis paths Need to use soft magnetic steel Low remenance and low coecivity Working with vendor and asking for expert advice on this

‘QG’ Gun-to-Linac Quadrupole Magnets -6 Amps +6 Amps -6 Amps +6 Amps From P. Emma r  20 mm Leff  7.6 cm

Quadrupoles Delivery Schedule Quadrupoles are near the critical path They are certainly what holds up the assembly Working directly with the vendor to refine their production schedule Examples Buy all materials up front. Don’t wait until after the 1st article has been accepted. Use methods of construction that the vendor has experience with.

Major Contracts Still to be placed To be placed by Managing Some vacuum system processes Vacuum Support Structure Support Mover system Expect the vendor to deliver simple “kits” RF BPMs Bodies and receivers Beam Finder Wire To be placed by Most by the beginning of the year Vacuum by February Managing Will tap into the experience gain from the management of the undulators to manage all further contract to completion

Beam Loss Monitor Schedule Multitier Approach Late start up, but still significantly off the critical path No items in vacuum or in need of precision alignment during assembly Multitier Approach Follow DESY Example Don’t reinvent the wheel

Beam Loss Monitor Multiple Detectors Scintillators/Cerenkov Detectors coupled to PMTs For low loss conditions Needs calibration Can achieve a broad detection dynamic range if allowed to vary the HV Cerenkov Detectors Thin optical fibers arranged around the vacuum chamber Not sensitive to extremely low losses Not simple to calibrate absolutely Fiber optic Long FO which browns as a function of dose at a known rate Used for long term dose measurements

Short Break: BLM (Hi Sensitivity) Location 12/28/2018 Short Break: BLM (Hi Sensitivity) Location BFW Ø10mm x 25mm long BFW Ø18mm x 19mm long Bellows Ø10mm x 76mm long BLM 5mm x 12.5mm x 25mm long RFBPM Ø10mm x 75mm long Beam Guide Vacuum Chamber 5mm x 12.5mm x 3467mm long Quad Spool Ø8mm x 158mm long Test

Summary We have accomplish a lot over the last 6 months But there is still a lot to finish We are interested in hearing your feedback to help us get over the last remaining hurtles so that we can deliver our equipment to SLAC and…