Task Group ac Process Overview

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0778r0 Report June 2014 Dorothy Stanley (Aruba Networks) Slide 1 P802.11REVmc Status and Overview Date: Authors:
Advertisements

Doc.: IEEE /0034r0 Submission January 15, 2009 Grodzinsky / De VegtSlide ac and ad Usage Models Documents Proposal Date:
Doc.: IEEE /0026r0 Submission January 2011 Sameer Vermani, QualcommSlide 1 VHT Supported MCS Field Date: Authors:
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
Submission doc.: IEEE 11-13/0090r2 January 2013 Sam Oyama, ARIBSlide 1 Spectrum Allocation for Wireless LAN and ITS in Japan Date: Authors:
Doc.: IEEE /0707r0 Submission May 2011 Minyoung Park, Intel Corp.Slide 1 Overview on TGah Specification Framework Development Date:
Doc.: IEEE /0xxxr0 Submission May 2010 Osama Aboul-Magd (Samsung)Slide 1 TGac May 2010 Closing Report Date: Authors:
Doc.: IEEE /1064r2 Submission Channelization for 11ac Date: Youhan Kim, et al.Slide 1 Authors: September 2010.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
VHTL6 task group work plan proposal (VHTL < 6 GHz)
Requirements Discussion
TGad Process Overview Date: Authors: January 2009
VHT SG Report to EC Date: Authors: July 2008 April 2007
IEEE aj Process Overview
TGac Documents and Timeline
Link Adaptation Subfield for VHT
Below 6GHz 11vht PAR scope and purpose discussion
Below 6GHz 11vht PAR scope and purpose discussion
VHT SG September 2008 Closing Report
IMT-Advanced Opening Report
[VHT SG Approach Proposal]
VHT SG Report to EC Date: Authors: July 2008 April 2007
<month year> doc.: IEEE /271r0 September, 2000
Below 6GHz 11vht PAR scope and purpose discussion
PAD SG Closing Report Date: Authors: September 2012
PAD SG Closing Report Date: Authors: November 2012
PAD SG Closing Report Date: Authors: November 2012
TGv redline between Draft 1.0 and 1.01
Task Group Process Overview
Redline of draft P802.11w D4.0 Date: Authors: November 2007
VHT SG September 2007 Closing Report
Oh, Control, Where Art Thou Darwin Engwer, Nortel
IEEE TGaf Los Angeles Opening Report
Arc Standing Committee
TGac Status and Timeline
IMT-Advanced Closing Report
Arc Standing Committee
QoSMAN SG Closing Report – Sept 2009
Efficient Frame Format for MU Transmission
VHT SG July 2008 Closing Report
VHTL6 Throughput Metric Thoughts
IEEE Liaison Report for
Arc Standing Committee
Arc Standing Committee
Closing Report Date: Authors: July 2015 July 2013
IEEE TGaf Los Angeles Closing Report
Task Group Process Overview
Tgae Closing Report – November 2009
Comments Clarification on VHT Operation Notes and VHT Action Field
IEEE Liaison Report for
Report on Date: Authors: March 2019 July 2013
QoSMAN SG Closing Report – Nov 2009
VHT SG November 2008 Closing Report
VHT SG January 2008 Closing Report
Comments Clarification on VHT Format HT Control Field
TGba January 2018 Closing Report
VHT SG March 2008 Closing Report
TGba September 2017 Closing Report
Spec Framework Decision Process Alternatives
TGad January 2009 Closing Report
Report on Date: Authors: January 2019 July 2013
TGac January 2009 Closing Report
IEEE TV White Spaces Study Group Closing Report
Spectrum Allocation for Wireless LAN and ITS in Japan
IEEE JTC1 Ad Hoc Closing Report
Report on Date: Authors: July 2019 July 2013
IEEE TGaf Beijing Closing Report
IEEE ah Timeline Projection
Presentation transcript:

802.11 Task Group ac Process Overview January 2009 doc.: IEEE 802.11-09/86r0 January 2009 802.11 Task Group ac Process Overview Date: 2008-11-12 Authors: Darwin Engwer, Nortel Networks Darwin Engwer, Nortel Networks

Abstract An overview of the TGac task group process. January 2009 doc.: IEEE 802.11-09/86r0 January 2009 Abstract An overview of the TGac task group process. Darwin Engwer, Nortel Networks Darwin Engwer, Nortel Networks

TGac Overview Objectives Constraints Guiding Documents January 2009 TGac Overview Objectives Constraints Guiding Documents Specification Framework Element Candidates Darwin Engwer, Nortel Networks

January 2009 802.11 TGac Objectives Darwin Engwer, Nortel Networks

January 2009 802.11 TGac Constraints Darwin Engwer, Nortel Networks

802.11 TGac Guiding Documents January 2009 802.11 TGac Guiding Documents Darwin Engwer, Nortel Networks

Specification Framework Element Candidates January 2009 Specification Framework Element Candidates Darwin Engwer, Nortel Networks

References 11-08-1395-00-00ac-Task-Group-Process-Overview.ppt January 2009 References 11-08-1395-00-00ac-Task-Group-Process-Overview.ppt 11-08-1392-00-0vht-inputs-for-a-vht-selection-procedure.ppt 11-08-1036-05-0vht-september-report.ppt 11-08-0579-01-0vht-towards-an-improved-proposal-development-process-for-vht.ppt 11-08-0807-04-0vht-below-6-ghz-par-nescom-form-plus-5cs.doc Darwin Engwer, Nortel Networks