1 Jigs drawing now online and ready for review: TCP: D D ERM: D D BS/FM: D D FOR THIS MEETING: QUESTIONS REGARDING.
Advertisements

Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
Overview of ACIGA high performance vibration isolator Jean-Charles Dumas Eu-Jeen Chin Chunnong Zhao Li Ju David Blair.
Seismic attenuation chains concept, design and advancement status Riccardo DeSalvo for the KAGRA Seismic group JGW-G September 10, 20121JGW-G
Dennis Coyne Excomm Jan 26, 2004
Advanced LIGO UK 1 Assembly errors discussion Justin (to lead)
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Rahul Kumar1, T. Takayuki1, K. Yamamoto2, H. Tanaka2,T. Miyamoto2, T
Vibration Isolation R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR), H. Ishizaki (NAOJ), A. Takamori (ERI), R. DeSalvo.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
Ryutaro Takahashi (National Astronomical Observatory of Japan) Vibrtion isolation system for KAGRA The 6th Korea-Japan workshop on KAGRA NAOJ, June,
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
Simulation for KAGRA cryogenic payload: vibration via heat links and thermal noise Univ. Tokyo, D1 Takanori Sekiguchi.
Shutter pushpull schematic2.ppt Present Manual Control System for Alcator C-Mod MSE Shutter (Schematic) We want to rotate the shutter into one of three.
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
1 PAY Review Meeting 1 18/3/2009 Piero Rapagnani 18/03/2009.
1 PAY & OSD Piero Rapagnani 26/02/ Fatal interference with current geometry: deep redesign of the payload needed Positioning another payload close.
Low frequency anti-vibration system of LCGT Vibration Isolation Group R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
GCSE ICT 3 rd Edition The system life cycle 18 The system life cycle is a series of stages that are worked through during the development of a new information.
Vibration Isolation Subsystem KAGRA face to face meeting (31 July, 2012) R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
Ing. Šimon Kovář, Ph.D. Ing. Jan Valtera, Ph.D. Ing. Petr Žabka, Ph.D. Ing. Josef Skřivánek Term project.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
LIGO-G D Design Requirements Larry Jones Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Active Vibration Isolation using a Suspension Point Interferometer Youichi Aso Dept. Physics, University of Tokyo ASPEN Winter Conference on Gravitational.
E. Majorana (INFN – Rome) ELiTES 3 rd General Meeting Hongo Campus – Tokyo – 9-10 Feb., 2015 Cryogenic platform with vertical suspension: a practical approach.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
1 Advanced Virgo Monolithic Payloads P.Rapagnani Thermal Noise Workshop 2012_02_24-25.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Cryogenic Payload Modeling: Vibration via Heat Links Takanori Sekiguchi JGW- JGW-G Cryogenic Payload Meeting
BM&N STS ladders assembly in VLHEP
Stator Plan & Schedule Chris Booth 2nd March 2009
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
Vibration Isolation Group
Main Interferometer Subsystem
Main Interferometer Subsystem
Type B Installation Plan
Kazuhiro Yamamoto on behalf of KAGRA collaboration
KAGRA用防振装置の開発 VIII Configuration Sensors and Actuators
Yuta Michimura Department of Physics, University of Tokyo
LCGT Seismic Attenuation System LCGT-SAS
IR Detector - Test cryostat : Machining
Status of KAGRA Cryogenics II
Control of the KAGRA Cryogenic Vibration Isolation System
Vibration Isolation Systems
Design of the He and HB ODU
Cryogenic Payload Modeling: Vibration via Heat Links
FIGURE 33-1 A typical fuel tank installation.
Adding Submittal Reviewers
P2 - Creating briefs and Storyboards
Type B Installation Plan
Mark Barton f2f Meeting 2/22/16
CD Status Update Barry Verdegan 11 September 2018.
Magnet PS Controls Hardware Status
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
HAM-SAS Mechanics Status of modeling V.Boschi, V. Sannibale.
Development of vibration isolation systems for LCGT VII
Status Vacuum Control-Command for AdV
- '1:- bs? a ' I.
Yuta Michimura Department of Physics, University of Tokyo
Cryogenic Payload Modeling: Vibration via Heat Links
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

Mark Barton f2f Meeting 2/22/16 Type B Status Mark Barton f2f Meeting 2/22/16

Overview Structure: Two variants: Preisolator with inverted pendulum stage and GAS filter Standard (GAS) filter Bottom (GAS) Payload Intermediate mass (IM) and Intermediate Recoil Mass (IRM) Optic and Recoil Mass Two variants: BS (1 unit; with custom payload for wider optic) SR2, SR3, SRM (3 units; with payload as for PRx)

Design/Procurement Tasks BS parts mostly done, except: Cable clamps (designed) Sapphire prism (designed) Dummy prism (designed) Secondary prism (designed) Dummy BS (designed) EQ stops for face of BS (designed) Flags (being redesigned) Springs for supporting optical bench below BS (designed) In-vacuum cables mostly made per D1503600 – needs careful check. Rack cables need planning Assembly frame – designed, ordered SR prisms need redesign, and RM may need matching modifications

Documentation Tasks Payload assembly procedure E1604817 - Fabian based on E1503830 (payload), T1503907 (IM) for PR3 (Type Bp Short) Overall assembly/installation procedure T1604756 - Mark Will draw on on T1604756 for PR3 Needs lots of work Schematic D1503600 – Mark Needs rack cabling added. Schedule – Mark Need to do a BS test hang first, starting in May, probably at least two months