A&P Fresh Market with UTC Power PureComfortTM 240M

Slides:



Advertisements
Similar presentations
MICROTURBINES FOR BUILDINGS
Advertisements

1 2/9/2014 Energy Savings, Power Reliability, Environmental Stewardship The benefits of on-site cooling, heating and power.
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
ACTIVE LEARNING PROCESS
Chapter 3. HVAC Delivery Systems
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
Refrigeration Systems
New MT Houses with Ground Source Heat Pumps Energy Savings and Costs June 2 nd, 2009 Regional Technical Forum 1.
Presented to: DOE/CETC Ottawa 2005 Bob Bechtold Harbec Plastics, Inc.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Energy-Efficient Process Cooling
Federal Reserve Bank of Boston Case Study
DOE - Chiller System Optimization Opportunities With Gas Engine-Driven Cooling Systems.
Exhaust Heat Recovery Systems
HVAC 11a CNST 305 Environmental Systems 1 Dr. Berryman
Heat and Power Sources for Buildings. Overview energy requirements of buildings traditional energy sources carbon emissions calcs LZC energy sources –low-carbon.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
Energy Security Federal Research Center at White Oak, Silver Spring, MD January 16, 2013.
LED light fixtures Warehouse, Commercial, Industrial, Freezer and Cooler applications Before After.
Trane Voyager™ rooftop units
LED light fixtures Warehouse, Commercial, Industrial, Freezer and Cooler applications Before After.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Ottawa Microturbine Application Workshop jan Return of Experience for Microturbines Running on Landfill Gas // waste water gas in Europe
Committed to smart, sustainable technology. Natural Gas Heat Pumps Opportunities for teaching HVAC concepts, theories & issues.
Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.
Waste Heat Generator (WHG)
A/C Final Project: Design Builder
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
Jack Mc Gowan, CEM Optimize operating cost for cooling Improve Capital Projects Improve learning environments GHP Best Practices Geothermal Heating and.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Stem Challenge Energy management systems, CHP, Harvester tank, green roofs and underfloor heating. 1.
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
Elliott Microturbines Absorption Chiller Integrated System Development
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
Cooling Product Positioning
ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
PUNTO ENERGIA Experience in Implementing and installing co-generation and energy- saving schemes Eng. Michele Vio President of AICARR Eng.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Micro-Turbine Systems for Energy Production from Agricultural and Food Waste.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Flooded Screw Chiller FWSF Electronic Expansion Valve Condenser Evaporator Control box compressor Flooded Screw Chiller - FWSF.
N O R T H A M E R I C A C O M M E R C I A L TDP
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Amanda D. Kimball Brennan Johnson Andrew Bennett Timothy Hardy Engineering Science Research Building.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Hybritec Refrigerated/Blower Purge Dryers (Combination Dryer)
Elliott Microturbines Absorption Chiller Integrated System Development
ENV-5022B/ENVK5023B Low Carbon Energy
2016 Maintenance Innovation Challenge
Book E3 Section 1.4 Air-conditioning
Grunenwald Science and Technology Building
Cooling technology Main components and equipments
Sustainable Refrigeration at the Right Price
ENV-5022B/ENVK5023B Low Carbon Energy
Plug & Play CHP? Is Your Pocket About to be Picked?
Presentation transcript:

A&P Fresh Market with UTC Power PureComfortTM 240M Jim Kirk Director of Engineering The Great Atlantic & Pacific Tea Co.

Project Team Facility: 57,000 Sqft A&P Supermarket, Mt. Kisco, NY Project Sponsors: UTC Power DOE/ Oak Ridge National Laboratory Utility: Con Edison

PureComfortTM 240M for A&P “Pre-Assembled” Integrated System: Skid Mounted 4 - 60 kW microturbines Gas Compressors Carrier Double Effect Absorption Chiller Cooling Tower Chilled Water Pumping System Provides 240 kW* of Electricity at 480v and 110 tons of Chilled water (95F day) or 900 MBTU Hot water (32F day) * 240 kW is Gross Power at 59 F, Net Power is 228 kW at 59 F

PureComfortTM 240M Skid Chiller Exhaust / Desiccant Connection Chilled Water Connections Electrical Panels / Pump Controls 60’ Microturbines Chiller 12’ 6” Gas Compressors Chilled Water Pump Station Cooling Tower Exhaust Manifold

Exhaust Diverter Valve PureComfortTM 240M Exhaust Diverter Valve Chiller Enclosure Gas Compressors Exhaust Duct Cooling Tower Microturbines

System Integration System Provides: 240* kW of Electricity - Grid Parallel - Grid Dependant - Base Load Chilled Water: - Space Cooling - Refrigerant Sub-Cooling Desiccant Regeneration: - Direct Exhaust Heat Hot Water: - Winter Operation - Space Heating * 240 kW is Gross Power at 59 F, Net Power is 228 kW at 59 F

System Integration (Heat Recovery)

System Integration (Electrical)

System Integration (EMS Controls) Microturbines, Chiller & Cooling Tower are controlled Via On-Board Controls Chilled Water Pumps, Bypass Valves & Desiccant Wheel are Controlled Via Building / Refrigeration EMS System (Danfoss AKC-55) Danfoss System controls Bypass Valve via two algorithms (Summer & Winter). A Manual Switch is used change from Summer to Winter Mode of Operation Sub-cooler solenoid valves are “always on” in Summer Operation Danfoss System Provides “Chiller Run” Input Only Heating, Cooling & Desiccant have “redundant” Systems

System Installation (Roof Top) Chilled Water Supply / Return Refrigeration Sub-Cooling Pre-Fabricated Refrigeration Penthouse Water Coil Desiccant Exhaust Manifold Munters HVAC PureComfort 240

System Installation (Roof Top) Refrigeration Condensers Desiccant Duct Munters HVAC Chilled Water Pipes to Refrigeration Sub-Coolers Screening Pure Comfort System

System Installation Challenges Site Required a Roof Top Installation Weight of System Required Additional Steel Support Location / Pre-Fabricated Weight Required 600 ton Crane to Install Pre-Fabricated Size Of System Required Special Permitting for Delivery (Over Width & Over Height) Mechanical / Electrical Engineers not Familiar with Technology Utility not Familiar with Technology

System Installation Benefits of Pre-Fabrication Quality Control – Assembled in Controlled Environment Simplified Installation: Seven Point Connection Chilled Water Supply & Return 400 amp 480v High Natural Gas (5 PSI) Make up water Tower / Chiller Drain Exhaust Duct to Desiccant Phone Line Less Design Required by Local Project M/E Engineers Very Accurate Documentation for Utility Interconnection Applications Faster Start-up & Commissioning

System Installation (Costs) UTC PureComfortTM 240M $500K* Coil In Munters Unit $8K Steel $55K Crane $37K Electrical $27K Plumbing $50K Desiccant Ducting $8K GC Management $14K Total: $699K $2,900/kWe Installed * Pre DOE Funding

System Installation (Costs) What Could We Do Better Next Time? Put It On The Ground! Remove Redundant Systems! Cost UTC PureComfortTM 240M $475K* Coil In Munters Unit $8K Removing Redundant Mechanical Systems (Munters) - $25K Steel $55K Crane $37K Electrical $18K Plumbing $50K Desiccant Ducting $28K GC Management $10K Total: $564K $2,350/kWe Installed * Pre DOE Funding

System Inst. (Utility Interconnection) Was Not an Issue! Turbines are NY State Type Tested and Approved for Interconnection NY State Law Forces Utilities to accept Standard Type Tested Interconnection Hardest Part was Getting to “the Right Person” within the Utility and “Educating” them about the System. Overall Application and Approval Process was very Simple Did Not Cause Any Delay or Additional Expense for Project

System Installation (Commissioning) A Problem Develops: Turbines will not automatically re-start in “multi – pack mode” Turbine Software found to be the problem Software has to be NY State Approved Delayed System Interconnection test three weeks That Was the Only Real Problem!!

What’s the Bottom Line? Reduced Energy Costs! Great PR! Estimated Annual Avoided Energy Loads & Cost Quantity % of Annual Baseline – Energy Annual Cost Savings [$]* Grid Electricity 54% $44,000 Refrigeration Compression 10% $10,000 Space Cooling Compression 70% $45,000 Desiccant Regeneration 50% $9,000 Space Heating 75% $21,000 Total $129,000 Gas = $0.69/therm & Grid Electric at $.13 kWh *Maintenance costs not included

Things To Consider: Local Utility Costs (Can you do it cheaper?) Can You Use The Chilled Water? Is High Pressure Gas Available? Local Interconnection Regulations? State Law? Local Utility Control? What are The Requirements? Can You Get It There? (Permit Issue)

Would We Do It Again? Yes!

For More Information: Jim Kirk 470 Chestnut Ridge Road Tom Coulbourn Woodcliff Lake, NJ 07677 (201) 571-4865 Jkirk@aptea.com Tom Coulbourn 2300 Westmoreland Street Richmond, VA 23230 (804) 678- 5307 www.utcpower.com