Rule Book Updates December 2018

Slides:



Advertisements
Similar presentations
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Advertisements

1 Version 2 23/09/13 Rule Book changes Network Operations National Briefing Team Rules changes – June 2014.
Unit 2 Learning the Basics
Transport Railways Incident Procedures. Aim To give students information about the emergency procedures to be adopted at incidents involving railways.
Line Blockage Guidance for Planners & GZAC
Planning & Delivering Safe Work. /23-May-15 Presentation Title: View > Header & Footer 2 Planning & Delivering Safe Work 10 point plan overview Roles.
Describe difference between a shared left-turn lane and a left turn lane. Describe what actions to take with pedestrian signals and traffic control officers'’
Conductor Decertification Discipline
DUCK RIVER EMC Lockout/Tagout Procedures For Overhead and Underground Line Work (De-energizing Lines and Equipment for Employee Protection)
Electrical Safety.
Electricity Service Delivery 2 Aim To provide students with information to enable them to deal with the effects of electricity at incidents.
Office of Railroad, Pipeline and Hazardous Materials Safety Collision of Metrolink Passenger Train 111 and Union Pacific Freight Train LOF65-12 Signal.
1 Satisfiability Testing in the Railway Industry Simon Chadwick Head of Research Westinghouse Rail Systems Limited, Chippenham, UK SAT2009 Twelfth International.
/ 1 Line Blockage Guidance for IWA,COSS or PC Operational Close Call Line Blockage Group 24-Mar-14.
U.S. Department of Transportation Federal Aviation Administration.
Co-trainer Webinar Emergency Preparedness December 20, 2012.
Drive Right Chapter 7 Negotiating Intersections Unit 4
Lockout/Tag Out Guidelines Procedures to protect employees and co-workers.
Accommodation & Hospitality Services STAFF BRIEFING – No 16 Electrical Safety.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Induction training for new employees The Environment.
Induction training – the Environment. Introduction We take our environmental responsibilities very seriously. We believe this to be in the best interests.
THINK*PAIR*SHARE Why do you think the chances of a collision are greater at an intersection than at any other point on the roadway? (Your answer should.
Create a Detailed CTC Machine Model with JMRI/PanelPro Other Clinics in this series: Introduction to Layout Control with JMRI/PanelPro Repeated 4:00 PM,
Movement of People and Vehicles Discussion lead by Mary Henton-Smith.
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
Electric Shock and Death during Overhead Crane Entry Bell Installation Grave Accident Case in Manufacturing Sector 교육미디어
Text box Workplace Safety and Health Management System Safety and Health Rules Online Training Module Rules for School Respect Treating others the way.
Infrastructure Part 3. Signalling 2 What the TSIs mean…  The on-board system is tightly defined – it has to be able to go anywhere,  The trackside.
/ Reducing Risk of Collision within T3 possessions: 5/15mph Brief London North Western.
Road and rail safety. Look at the next slides and try to guess what each picture is of as it is revealed. The three pictures will show the most important.
Lockout/tagout for authorized employee
Chapter 8. Electrical Systems
Standard 019 Update Briefing
Standard 019 Update Briefing
Energy is a good servant but a cruel master.
Guide for the application of CSM design targets (CSM DT)
Lock Out & Tag Out.
UCG- TAG OUT LOCK OUT.
GENERAL REQUIREMENTS.
Poushali Pal AMIEEE, M. Tech in Information Technologies
Safety Technical & Engineering
Session II: System authority for ERTMS 4RP Trackside approval
UK TECHNICAL SOLUTIONS INTERNATIONAL
Lab Safety.
Standard 019 Update Briefing
Rules of the Road.
ES PICOP LEARNING FROM INCIDENTS Learning from incidents:
Unit 2: Signs, Signals, and Roadway Markings
Safety Hour Discussion Pack
School Bus and School Zone Safety
SAFE WORK INSTRUCTIONS
Fire Awareness and Evacuation Training 2018
Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Author: Fenggang Shi.
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
Union College Utility Cart Safety Program
SIGNS, SIGNALS, and MARKINGS
Line Blockage Guidance for IWA,COSS or PC
Safety Meeting Topics Standby Generator Safety
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
GENERAL REQUIREMENTS.
*Supported by National Research Council of Thailand
Rules of the Road Chapter 10
Chapter 2 Signs, Signals, and Roadway Markings
ELECTRICAL, FIRE & FALL SAFETY
Changes to the Rulebook
That person will have been involved in the planning of the work.
Ladbroke Grove Rail Accident
Presentation transcript:

Rule Book Updates December 2018 Presentation Title: View > Header & Footer Rule Book Updates December 2018 An overview of the changes affecting workforce 28-Dec-18

Where to find the changes? Presentation Title: View > Header & Footer Where to find the changes? Briefing leaflet: https://www.rssb.co.uk/rgs/rulebooks/GERT8000-RBBL%20Iss%2032.pdf Presentations & videos: will work only on I-phones/pads or those with access to YouTube https://www.rssb.co.uk/Pages/Standards-Update.aspx 28-Dec-18

Changes that affect workforce Presentation Title: View > Header & Footer Changes that affect workforce Handbook 8 IWA, COSS or PC blocking a line & Handbook 21 Safe work leader (SWL) blocking a line A line blockage can only be granted with a train within the portion of line concerned either where this is authorised, or when the train has become disabled and the driver has told the signaller it will not be moved. Additional protection should always be used when it is possible to do so, as shown on the revised Line Blockage Form (NR3180). To clarify the intended meaning, the wording of section 5.1 has been changed to state that the request to the signaller to restore a disconnection of signalling apparatus must not be made until after the line blockage has been given up or suspended. 28-Dec-18

Changes that affect workforce Presentation Title: View > Header & Footer Changes that affect workforce Handbook 16 AC electrified lines Because of the introduction of bi-mode trains which can either operate as electric trains drawing power from the ac electrification system, or in a self-powered mode using their own tractive power, a number of changes have been made to the rules in this module. Bi-mode trains change over between self-powered and electricmode at planned locations, and may also do so in order to travel into areas where there is damage to the overhead line equipment. Section 3.1 has been changed to make it clear what is meant by overhead line equipment (OLE) being made safe, and that the OLE must still be treated as dangerous. Section 7 has been changed to state that the electricity must always be switched off before a person above or near to the OLE is approached. 28-Dec-18

Presentation Title: View > Header & Footer Other changes Glossary - Glossary of Railway Terminology Handbook 16 AC electrified lines Module AC AC electrified lines Module M1 Dealing with a train accident or train evacuation Module M2 Train stopped by train failure Module S5 Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) Module SS1 Station duties and train dispatch Module TS1 General signalling regulations Module TS2 Track circuit block regulations Module TS10 ERTMS level 2 train signalling regulations Module TW5 Preparation and movement of trains: Defective or isolated vehicles and on-train equipment RS521 Signals, Handsignals, Indicators and Signs Handbook 28-Dec-18

Presentation Title: View > Header & Footer Questions? 28-Dec-18