Debrief Case Study Setting

Slides:



Advertisements
Similar presentations
Relevance Feedback A relevance feedback mechanism for content- based image retrieval G. Ciocca, R. Schettini 1999.
Advertisements

Ontology Summit 2013 Track D: Software Environments for Evaluating Ontologies Session 6 - Synthesis I Michael Denny (MITRE) Peter Yim (Ontolog, CIM3) 21.
ECMDA workshop Thales ATM experience in using MDE ECMDA Workshop From code centric to model centric software engineering Bilbao 11 July 2006.
Designing and Developing Decision Support Systems Chapter 4.
The Assignments. A good assignment is one that… Permits creativity Gets me a good grade Requires me to think …
Research Methodology EPH 7112 LECTURE 3: RESEARCH PROCESS.
Project Management Technique By: Penny Leahy Jackie Holohan.
Systems Analysis and Design in a Changing World, 6th Edition
Ch9: Software Engineering Tools and Environments.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Assessment Assessment involves the sampling of some aspect of a person's learning/knowledge at a particular moment. Depending upon the kind of sample.
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Planning. SDLC Planning Analysis Design Implementation.
Tracing Requirements 1. The Role of Traceability in Systems Development  Experience has shown that the ability to trace requirements artifacts through.
Data Structures and Programming.  John Edgar2.
Student Success Plan for Delaware. SSP Homepage The SSP Homepage is the central point from which students can access all of the features and functions.
© 2012 IBM Corporation Rational Insight | Back to Basis Series Chao Zhang Unit Testing.
SE-280 Dr. Mark L. Hornick 1 Process Adaptations.
Leaders in Asset Management Big Plans for your Property System? How to plan for a Property System Project Prepared by: Yudiann Carlo, CPPS
Fission Yeast Computing Workshop -1- Searching, querying, browsing downloading and analysing data using PomBase Basic PomBase Features Gene Page Overview.
Physics and Data Analysis Working Group – January 2007 Dear all, thanks for the participation to this Tutorial that is intended to encourage American participation.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
CONNECT Roadmap Draft version as of February 4 th,
© Risk & Injury Management Services 2005 Written by: Chris Fitzgerald (RIMS) The RIMS Workplace Ergonomics, Risk Management, Rehabilitation & Compensation.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
COMP 208/214/215/216 – Lecture 8 Demonstrations and Portfolios.
CS Data Structures I Chapter 2 Principles of Programming & Software Engineering.
Effective Meetings Tony Del Busso December 14 th, 2006.
Using Domain Ontologies to Improve Information Retrieval in Scientific Publications Engineering Informatics Lab at Stanford.
MVC WITH CODEIGNITER Presented By Bhanu Priya.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
Adaptive Faceted Browsing in Job Offers Danielle H. Lee
Management of Software Project CSM Review By:Nafas.
44222: Information Systems Development
Customer Care & Help Desk. Content  What is Help Desk?  Who should use these?  Features of Help Desk  Hierarchy of Help Desk (Level of User)  Flow.
How does classroom discussion and questioning affect students’ learning?
Training Workshop on Business Process Analysis in International Trade Joint Workshop on Trade Facilitation and the Single Window September 2015,
T Iteration Demo Vitamin B PP Iteration
Review of Usability Testing
Unit 6 Application Design KLB Assignment.
FHIRForms – Viewing and Editing FHIR Data
Roles in the Database Environment
CSC207 Fall 2016.
Unit 6 Application Design Sample Assignment.
Software Verification and Validation
Topic for Presentaion-2
Development of the Amphibian Anatomical Ontology
Unit 6 – Implementation log
Learning Reproducibility with a Yearly Networking Contest
IEEE Std 1074: Standard for Software Lifecycle
System Development Life Cycle (SDLC)
V-Shaped SDLC Model Lecture-6.
SOIS EDS Interoperability
Data Warehouse.
Austrian Statistical Datawarehouse (sDWH)
Unit 09 – LO3 - Be able to Implement and Test Products
Vision on the future development of R4BP 3
EDIT User Group - services
Systems Construction and Implementation
Cornell Notes Essential Question: What are the expectations of my Cornell notes as a junior in AVID?
Bulloch Information Session
Systems Construction and Implementation
Final Design Authorization
Applications Development - Unit Testing
Cornell Notes Essential Question: What are the expectations of my Cornell notes as a junior in AVID?
Unit 4 - A06 – Review Grade Criteria To get a c
Cornell Notes Essential Question: What are the expectations of my Cornell notes as a junior in AVID?
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
From Use Cases to Implementation
UML Design for an Automated Registration System
Presentation transcript:

Debrief Case Study Setting

Motivation Validate and Refine More specifically The theoretical comprehension process model Extend the comprehension model to support a component substitution process More specifically Populate the Ontology and Refine the Ontology Design Identify process supporting queries. Collect Historical data and perform data mining on the collected data

Major Phases of the Case Study Familiarize yourself with Debrief Read paper related to Debrief Tutorial FAQ => At this point you are not yet looking at any implementation details/ source code Duration: Max. 4 hours.

Major Phases of the Case Study 2. Comprehension phase A particular comprehension task will be the distributed (the same for all participants) – see also Phase 3 Every participants will have a set of tools assigned => will vary between participants. The comprehension process will suggest a set of tools that are applicable at the current stage (required resources for the tools are available) Keep track of the features used in the tool and provide feedback => will be used to enrich the ontology and improve the queries. Feedback forms will be returned to Wen Jun (EV 8-150) User will determine if the current understanding is sufficient to continue with the next phase. If not, a new query will be generated with an updated list of tools Duration: Max. 20 hours (=> keep a log of your activities and their duration)

Major Phases of the Case Study Perform the modification – component substitution A component will be provided that has to be integrated to replace an existing component/part of the Debrief system. A set of tools specifically suitable for the substitution will be suggested (e.g. debugger, etc) User might have to go back to the comprehension tools to gain additional understanding Duration: Maximum 20 hours (=> keep a log of your activities and their duration)

Major Phases of the Case Study 4. Validation and Verification Ensure that the modification performed was performed correctly. Test cases will be provided. Duration 4 hours (=> keep a log of your activities and their duration) Integration Duration 1 hour (=> keep a log of your activities and their duration)