Peco Facet Sewage Water Treatment Plant STP 16 HA
Peco Facet Sewage Water Treatment Plant Project Information Project: …………………………………………….…..Lankaran Court of Grave Crimes Contractor:……………………………… Ministry of Justice of Azerbaijan Republic Detailed design …………………….... “AzerDovletLayihe” State Design Institute Civil works: ……………………………………………………….… “EL-SEYM Insaat” LLC Subcontractor for Sewage Water Treatment: …………..Facet Germany GmbH Date of order: ………………………………………………………………………….July 2011 Facet model: …………………………………………………………………………..STP-16HA Max. design flow rate: …………………………………………………………….40 m³/day Equivalent inhabitants: ……………. 160 persons (Directive: CE 91/271/CEE) Commissioning date: …………………………………………………………….04.05.2012
Peco Facet Sewage Water Treatment Plant Lankaran City R Republic of Azerbaijan 270 kilometers from capital Baku Lankaran
Lankaran Court of Grave Crimes Lankaran, Republic of Azerbaijan Peco Facet Sewage Water Treatment Plant http://courts.az/lankarangravecrimes/?lng=en Lankaran Court of Grave Crimes Lankaran, Republic of Azerbaijan Facet STP unit
Peco Facet Sewage Water Treatment Plant Waste Waters formed in toilets and kitchen to the Sewage Water Treatment Plant installed by Facet Facet STP unit The unit has been build behind the Court walls
Sewage Water Treatment Plant STP16HA Peco Facet Sewage Water Treatment Plant Sewage Water Treatment Plant STP16HA Facet scope: Basic Design, Engineering, Supply of Equipment, Installation and Start-up All civil works and sewer network system was made by EL-SEYM Insaat LLC (local construction company)
Construction period – January 2012 Peco Facet Sewage Water Treatment Plant Construction period – January 2012 Pumper well Aeration Chamber Aeration chamber & control room Place for Module Control room General View EL-Seym Insaat LLC - Local Civil company has built Pumper well, Inlet pit, Aeration Chamber and Control Cabin According to drawings provided by Facet
Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of Settling and Disinfection Chamber by Crane Installation works has been carried out by sub-contractor of FACET GERMANY
Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of the skid to Control Room (PLC, Blower, Recirculation Pump, Ozone Generator)
Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Connections from Control Skid to the Module
Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Connections between Aeration Chamber and Settling/Desinfection Module
Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of BioFilm Media and Air Diffuser in Aeration Chamber
Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Basket in pumper well Outlet Pipe to Collection box
Peco Facet Sewage Water Treatment Plant Water Filling – May 2012
Start up Commissioning – May 2012 Peco Facet Sewage Water Treatment Plant Start up Commissioning – May 2012 Facet specialists has carried out the operation training course to the staff of EL-Seym Insaat LLC
Start up Commissioning – May 2012 Peco Facet Sewage Water Treatment Plant Start up Commissioning – May 2012 Facet specialists has carried out the operation training course to the staff of EL-Seym Insaat LLC
Peco Facet Sewage Water Treatment Plant General Plan
Peco Facet Sewage Water Treatment Plant Effluent Conditions Ph……………………………………………………6-8 BOD5 ……………………………………………..<25 mg/l COD …..……………………………………………<125 mg/l TSS …………………………………………………<35 mg/l O2 dissolved (aeration chamber) ……..6-10 mg/l Temperature ………………………………….. Ambient Aspect ………………………………………..…. Odorless and Transparent
Thank you for attention Peco Facet Sewage Water Treatment Plant Thank you for attention