1 Managing Tactical Water Purification Waste Streams TerraGroup Corporation.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

SPCC PLAN OVERVIEW - SLIDE 1 OF 45 © Copyright SafetyInstruction 2008 SAFETY TRAINING CORPORATE SAFETY TRAINING © Copyright SafeyInstruction 2008 EPA 40.
Advanced Wastewater Treatment Plants.
1 Nia Sutton Becta Total Cost of Ownership of ICT in schools.
Advanced Piloting Cruise Plot.
Operations Management Maintenance and Reliability Chapter 17
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright 2011 Elsevier Inc. All rights reserved.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
Site Safety Plans PFN ME 35B.
1. 2 CAPTURE, CONTAIN, TREAT AND DISPOSE OF DECONTAMINATION RUNOFF ON-SITE Primo L. Acernese TerraGroup Corporation TECWAR ® Systems Allentown, PA Originally.
TYRONE ENVIRONMENTAL GRP.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
EMS Checklist (ISO model)
Carl Wirdak Occidental Petroleum Corporation GEMI Survey Water Use, Issues & Management March 2001.
Australian water filter.
Basics on COD measurement
Customer Service.
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
VOORBLAD.
Checking & Corrective Action
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Module 6: Safety At the HIV Rapid Testing Site. Lab workersHealth workersCounselors 2 The Lab Quality System Process Control Quality Control & Specimen.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
1 By Assoc. Prof. Dr. Ahmet ÖZTAŞ Gaziantep University Department of Civil Engineering CHP V-ANNUAL WORTH ANALYSIS CE ECONOMIC DECISION ANALYSIS.
© 2012 National Heart Foundation of Australia. Slide 2.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Presented to: Minnesota Chamber of Commerce October 1, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Visual 6.1 Organizational Flexibility Unit 6: Organizational Flexibility.
Functional Areas & Positions
Chapter 5 Test Review Sections 5-1 through 5-4.
Addition 1’s to 20.
Steve McLaughlin, PE Virginia Beach Public Works October 2012.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Decontamination Principles and Patient Management
Presentation transcript:

1 Managing Tactical Water Purification Waste Streams TerraGroup Corporation

2 Purpose To outline and provide information on the design, advantages and capabilities of the MMFFS TM 3000 system with respect to multiple support situations.

3 Presentation Outline Background Problem Regulatory Drivers Case Study: U.S. Army Forces Command MMFFS Advantages & Capabilities Treatment Technologies & Schematic Performance Data Summary

4 Background Military field operations require water for multiple needs Two current Reverse Osmosis Water Purification Units (ROWPU) in service: 3000 GPH and 600 GPH ROWPU Operation and maintenance procedures generate 4 types of wastewater: RO reject RO backwash ROM Cleaning Waste Chlorinated Product Water

Gallon Per Hour Reverse Osmosis Water Purification Unit (ROWPU)

6 600 Gallon Per Hour Reverse Osmosis Water Purification Unit (ROWPU)

7 The Problem…... Training exercises produce waste materials. EPA regulations prohibit raw discharge of waste. Discharge regulations impact training and readiness Mission critical assets diverted for this purpose Affected budgets supporting involved logistics FORSCOM identified Permitting issues impacting training and readiness in 1996

8 …one current solution

9..and an even worse solution

10 Regulatory Drivers US EPA: –40 CFR –Discharge permits are required –Environmentally Sensitive areas Individual States: –Different Interpretations –Effluent parameters & concentrations differ –Source Water Conditions

11 U.S. Army Forces Command Goals Education & Communication Between ROWPU Units and installations Between Installation permit writers and States Identify Regulatory Concerns Pursue permits where needed Pursue technology-equipment fix where needed

12 U.S. Army Forces Command MMFFS Program Work with installations and states to ensure ROWPU operations meet regulations Allow by the manual training thereby maintaining readiness Reduce operational costs and return equipment to its original purpose Implement or adapt commercially available technology and solutions MMFFS 3000 in transport configuration in an M /2 ton Trailer.

13 FORSCOM Solution = MMFFS MMFFS meets all FORSCOM requirements for equipment fix. Designed for transport in M105 trailer Unit Weight: 2,400 lbs.. Footprint: 8L x 6 W x 5 H Set up in under 30 minutes One troop operable Configurable for two flow rates 120 GPM max - high flow path 66 GPM tortuous path Totally self-contained Designed for use with 3K ROWPU

14 MMFFS 3000 Advantages Proven treatment technologies –Aeration, Filtration, Adsorption, Oxidation/Reduction Adaptable to many situations Simple operation and maintenance Cost effective –Eliminates need to containerize/haul contaminated wastewater –Pays for itself in 1 year/200,000 gallons processed. * * U.S. Army Forces Command, 2000, MMFFS 3000 Payback Analysis, Contract # DAKF11-99-D-005, TO 022

15 MMFFS Process Flow STAGE I PRE-FILTRATION and AERATION Tri-Flow Pre- Filtration MICRON SOLIDS PARTICULATES TSS STAGE I PRE-FILTRATION and AERATION Tri-Flow Pre- Filtration MICRON SOLIDS PARTICULATES TSS STAGE II MMFFS CONTACTORS BOD COD PNA BTEX NOM OILS GREASES WAXES NBC PHOSPHATES HEAVY METALS SURFACTANTS STAGE II MMFFS CONTACTORS BOD COD PNA BTEX NOM OILS GREASES WAXES NBC PHOSPHATES HEAVY METALS SURFACTANTS STAGE III Polisher Bank I 5 MICRON FILTRATION VOCS - SOCS TTHMS STAGE III Polisher Bank I 5 MICRON FILTRATION VOCS - SOCS TTHMS STAGE IV LIFE ® REACTOR (LIQUID INTERNAL FILTRATION EFFECT) (Contactor Support) STAGE IV LIFE ® REACTOR (LIQUID INTERNAL FILTRATION EFFECT) (Contactor Support) STAGE V Polisher Bank II 1 MICRON FINAL FILTRATION STAGE V Polisher Bank II 1 MICRON FINAL FILTRATION

16 MMFFS 3K Schematic

17 Alternate Flow Path

18 ROWPU BACKWASH

19 MMFFS 3K treating ROWPU Reject and Backwash

20 MMFFS capabilities Pre and/or Post Treatment NBC decontamination Emergency response and management Disaster response and support personnel

21 ROWPU Pre-Post Treatment Effectively removes: –Suspended solids –BOD/COD –Heavy metals –Inorganic contaminants –Hydrocarbons (oil/grease) ROWPU Backwash water, Fort Stewart, GA. Pre - and post - MMFFS backwash water samples

22 NBC Decontamination Personnel & vehicle decon water All treatment media self-contained Minimal operator/personnel exposure

23 Emergency/Disaster Response Provide additional treatment capability for potable* or non- potable uses Fuel/Oil spill cleanup Adaptable to various contaminant types and concentrations * Requires RO or disinfecting following treatment

24 MMFFS 3K in NBC pre-treatment application to protect key ROWPU components

25 Decontamination procedure utilizing MMFFS

26 Summary MMFFS initially developed for U.S. Army Assists in environmental regulatory compliance -- a training facilitator Adaptable - Multiple uses Easy to use, proven technology Cost effective solution Currently in use by FORSCOM at 6 Installations

27 Conclusion MMFFS modular design and proven capabilities are an effective method of complying with wastewater discharge regulations while accomplishing a variety of real-world missions.

28 MMFFS TM 3000 An Adaptable Solution for Field Wastewater Treatment and Discharges Challenges Multi-Functional Modular Fluid Filtration System 3000 TerraGroup Corporation Allentown, PA. USA

29