The Hashemite Kingdom of Jordan Ministry of Water and Irrigation Jordan Valley Authority RSDS- Phase I Desalination of (80-100) MCM/yr at Aqaba.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Unlocking the Potential in Aqaba and Jordan
TEAM TWO ALTERNATIVE ADD WATER PROJECT May 20, 2009.
EURORAIL Project Organizational model. EURORAIL Project Initiator: Ministry of transport and communications of Ukraine Lviv Oblast State Administration.
Fill in missing numbers or operations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Joint WTO/WB Regional Workshop on Procurement Reform and Transparency Session 4: Objectives of Procurement Regimes and Non-Discrimination and Preferences.
TEN-T Info Day for AP and MAP Calls 2012 OVERVIEW AND PRINCIPLES Anna Panagopoulou TEN-T EA Head of Unit T4 –Technical & Financial Engineering, GIS & Monitoring.
1 José Frade European Investment Bank Water and Sanitation EC-EIB Seminar Session 1: What constraints access to finance Financing the Maputo water supply.
Summary of MPWMD Local Desalination Project Proposal
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Fractions mean division. 1 4 of 28 =28 ÷ 4=7 How would you find out what of 28 is? 3 4.
AMERICAN EXPERTISE AND TECHNOLOGY IN WASTEWATER AND WATER SECTOR WASTEWATER AND WATER INVESTMENTS IN TULCEA COUNTY, ROMANIA.
RED SEA- DEAD SEA PROJECT/PHASE I The Government of the HASHEMITE KINGDOM of JORDAN Represented by The Ministry of Water and Irrigation January 2014.
2 nd International Conference Graz October, 10 th 2012 Techniques to save water quantity PP5 (LCA) PPs: LCA, LfULG, RNA.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK. Information On The Ground Area in Malaya Sosnovka Industrial Innovations Park There is no encumbrances.
Look at This PowerPoint for help on you times tables
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
Methow Valley Irrigation District Alternatives Evaluation Presented by Bob Montgomery, P.E. and David Rice, P.E. January 31, 2013.
Public Private Partnership in Jordan Executive Privatization Commission Tunis 16 th Feb
Everyone can access. Contents Mer-links context The route of decision-making What is Mer-link? Lessons Learned.
Area of triangles.
MENA Water Outlook 2050 Water Scarcity and Adaptation Options
PUBLIC PRIVATE PARTNERSHIPS Taking a Balanced Look…. Development Equity Associates Inc. Nov. 14,
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Presenter: Frederick Yaw Logah (RS) CSIR-Water Research Institute, Accra-Ghana 15th July, 2014.
Doubling and Halving. CATEGORY 1 Doubling and Halving with basic facts.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Session 8 Implementing PPPs
Hashemite Kingdom of Jordan Ministry of Water and Irrigation authority Water in Jordan: The way forward 2012 Pre by: Eng.Rateb Al-Adawn Water in Jordan:
Doosti Dam on shared river of Harirood: A Friendship Bridge Between Iran and Turkmenistan Saeed Nairizi Head of the Board & Managing Director, Toossab.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Phases of A BOT Project Prepared By :Afaf Bu-khawa Course title: Technology Implementation,MGT 620.
PUBLIC-PRIVATE PARTNERSHIPS PUBLIC-PRIVATE PARTNERSHIPS In Jordan By Engineer Ibrahim Abu Shams Planning and Management Unit Ministry of Water and Irrigation.
Jordan River Rehabilitation Project March 22 nd /6/20151.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
Financing Urban Public Infrastructure
Water Crisis in Gaza Strip A study of the Impact of Middle East Conflict upon Water Quantity and Quality in Gaza Strip By: Ayman H. Afifi Islamic University.
Lay-out of Proposed Scheme. Positives – Well located for integration into both NMBM Potable and Industrial supply infrastructure Can supplement either.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
1 State of Israel The Ministry of National Infrastructures Water Commission Water Development and Management in Israel and the Region The Over-all Perspective.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Demonstration Project in Waste Water Treatment Delhi Jal Board, India Is Water Business Export Business? DHI, 14 October 2011 Peter Sand.
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
Dead Sea Solutions Monica Enriquez April 16, 2013 Israel: Science and Innovation.
13/10/2004Rafi Benvenisti1 The Second Israeli-Palestinian International Conference on “Water for Life in the Middle East” Addressing the Dead Sea Basin.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Dead Sea Solutions Monica Enriquez April 16, 2013 Israel: Science and Innovation.
Public – Private Partnership in Vietnam: A new approach Ho Chi Minh City – June 2010.
Public-Private Partnerships in Climate Change:
STATE LAW OFFICE AND DEPARTMENT OF JUSTICE
Introductory Remarks and Meeting Goals
DISTRICT COOLING A promising and sustainable option for HFC phase-down
Memorandum of Understanding with GE Osmonics, Inc
Infrastructure Projects Facility and the Western Balkans Infrastructure Initiative Brussels, 25 November 2008 Christos Gofas DG ENLARGEMENT D3.
Liquefied Natural Gas Terminal in Lithuania
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Instrument za pretpristupnu pomoć
Richland Creek Water Supply Program Program Update
Presentation transcript:

The Hashemite Kingdom of Jordan Ministry of Water and Irrigation Jordan Valley Authority RSDS- Phase I Desalination of (80-100) MCM/yr at Aqaba

Why Jordan Needs The Red Dead Sea- Dead sea Project To provide additional freshwater to cover the deficits in all governorates To save the Dead Sea from Extinction

Supply vs Demand MCM/Yr DemandSupplyDeficitDemandSupplyDeficitDemandSupplyDeficitDemandSupplyDeficitDemand SupplyDeficit Base Deficit Add 25%(15% Physical Losses, 10% Influx from neighboring Countries Add Reduction of over abstraction Total Deficit in the Kingdom w/o Disi Disi Kingdom with Disi

Ministry of Water and Irrigation

Proposed Project- RSDS- Phase I As A follow-up on the WB Study The Regional Countries are in agreement to start the implementation of an initial phase to fulfil the concept of: Rapid initiation of RSDS Regional Project with Initial Phase I, Initiating the infrastructure elements of all subsequent project phases

8 Completed Studies 1. Feasibility Study Coyne et Bellier 2. Environmental and ERM Social Assessment 3. Study of Alternatives Professors Allan, Tsur and Malkawi 4. Red Sea Modeling Study Thetis 5. Dead Sea Modeling Study Tahal Red Sea – Dead Sea Water Conveyance Study Program WB Study Multi-Stakeholder Consultations

Agreed Project to be Implemented RSDS-Phase I Memorandum of Understanding (MoU) has been signed on Dec 9, 2013 between Jordan, the Palestinian Authority, and Israel at the World Bank in Washington DC, in which all parties agreed to start the implementation of the first phase of the RSDS project on BoT basis. Following up on this MoU, bi-lateral agreements will be signed between Jordan and Israel and Palestinian Authority and Israel soon; these agreements will include all the details of the agreements between the parties. This project RSDS-Phase I (Red Sea Desalination Project at Aqaba) is a result of a joint initiative to promote regional cooperation among Israel, Jordan and the Palestinian Authority (the Beneficiary Parties). It is undertaken in the context of the urgent need for potable water in the Region.

Infrastructure Component RSDS- Phase I Sea Water Conveyance Red Sea Intake Structure Intake Pump Station Intake pipes through Ayla Sea Water Pipeline from Ayla to Treatment Facility Pre-Treatment and Desalination Treatment Facility/ North Shore Desalination Facility/ North Shore Pump Station to Fresh Water Reservoir Fresh Water Conveyance Fresh Water Pump Station to Termination point & Aqaba Terminal Reservior Fresh Water Pumped Pipeline to Israel Fresh Water Pumped Pipeline to Aqaba Desalination Brine Management Brine Pipeline from Desalination to Al-Rishah Top High Point - Al-Rishah Brine Pipeline from High Point to Dead Sea Pump stations 1&2 from Desalination to Ar Rishah Pressure Reducing Stations 1&2 Direct Brine Discharge structure (40% of Total CAPEX Cost) Ancillary facilities Electrical Instruments Chlorination Scada

1400 mm, L=205Km 2 pipes, 1400 mm, L=15Km 800 mm, L=48Km 900 mm, L=22Km Desalination of (80-100)MCM/yr at Aqaba

Next Step Preparation of RFP for the Selection and Assignment of a Specialized Engineering Firms to prepare Preliminary Design, Legal and Financial Terms, and Tender Documents based on BoT and PPP participation. DRAFT RFP is AVAILABLE Implementation Schedule ActivityDuration Preparation of Tender Documents 12 months: Starts in Feb, 2014 Tendering of Contract for BOT Contractors Nov, 2014 Award of Contract and financial close with preferred bidder May, 2015 Beginning of Construction Phase Aug, 2015 Duration of Construction 30 months ( Feb, 2018)