PAD Proposal.

Slides:



Advertisements
Similar presentations
January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
Advertisements

Alachua County Plat Review – Southampton Traditional Neighborhood Development – Phase 1 February 24, 2009.
________________________________________________________________________________________________________________________________________________________.
Suggested Changes to Centers and Corridors Design Standards and Guidelines Amber Waldref August 11, 2014.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
PALM COAST COMMERCIAL & INDUSTRIAL CENTER – PHASE Application No. SP-MAJ
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
Alachua County Plat Review Process February 26, 2008.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
City of New Brighton Planning Commission Meeting October 18, 2005 Agenda Item: 6A (Public Hearing) Special Use Permit for Detached Garage Exceeding 624.
Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
Parlette Annexation Public Hearing – 11/12/2009.
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments December 16, 2009 Department of Safety & Inspections / Department of Planning.
Lowe’s Parking Flexibility Application No. PK-FLX
Community Development Department APPLICATION 2922 VARIANCE TO REDUCE LANDSCAPE BUFFER.
Lowe’s Site Plan Application No. SP-MAJ Lot 3.
Somerset Village Playground KEENE’S POINTE CAMDEN TOT LOT Lake Burden Playground Bedford Village Playground Community Activity Area Proposed Camden Village.
City of Dunnellon Comprehensive Plan Amendment  Future Land Use Element  Conservation Element  Concurrency Management System.
Public Hearing Seattle Ridge Preliminary Plat/ Planned Area Development PP December 18, 2013.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Alachua County Plat Review – Greenbrier Subdivision February 24, 2009.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
Center Point Area Fire Department SAFETY AND SUSTAINABILITY.
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
Community Development Department Ryan’s Landing Planned Unit Development Application No
Board of County Commissioners PUBLIC HEARING Village Planned Development Code (Horizon West) June 2, 2009 Board of County Commissioners PUBLIC HEARING.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Review Hearing LU DZM AD – Grant.
1 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Items 6D & 6E ZA & ZA OWNERS:Timothy & Lori Livingston and James.
VILLA AMADOR VICINITY MAP. CASE SPECIFICS Subject properties encompass ± acres –Entails 10 parcels of land –Located south of Amador Avenue, west.
Planning & Community Development Department Rose Bowl Aquatic Center Master Plan 360 North Arroyo Boulevard Predevelopment Plan Review PPR City.
Presented by Kelsey Lang, Planning Associate June 27, 2016
WPVAR (Greenview HOA) Washoe County Board of Adjustment August 3, 2017.
Jefferson County SA Red Rocks Site Approval
Parking Lot Design.
Will’s Trace Subdivision
PROPOSED DISCOUNT TIRE 10 GARDEN STREET PALM COAST, FL
Project Management Team Meeting #3
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
Washoe County Board of Adjustment
LEE FARM ADDITION – GDP AMENDMENT
Jefferson County Planning Commission Hearing April 10, 2013
Washoe County Board of Adjustment
WVAR Sierra RV S. Virginia Street (old 395 S)
GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT – ESSENTIALLY BUILT OUT AGREEMENT City Council Workshop May 27, 2014.
Request #2 Request #1 Segment built by LCPS.
Marina Del Palma Comprehensive Plan & Zoning Map Amendment
Palm Coast 145, LLC Comprehensive Plan Amendment & Rezoning City Council Public Hearing September 5, 2017.
Arbors at Bittersweet Woods.
PROJECT PLANNING MEETING
Citrus Park Drive Extension
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Property Disposition Public Information Session
M-1.
Public Information Session
Proposed Zoning By-law Amendment & Future Consent Application
WPVAR (Greenview HOA) Washoe County Board of Adjustment March 7, 2019.
Sand GWA Morning Drop Off = Buses = Parents Cars = Traffic Controllers
Where do you go from here?
WSUP The Club at ArrowCreek Grading
12B: Scott County CDA Comprehensive Plan Amendment, Rezoning and Zoning Code Amendment City Council June 18, 2018 Laura.
November Bond Election
Presentation transcript:

PAD Proposal

Revised Proposal Public Comment: Response: Can a sidewalk be provided adjacent to the drainage channel located between lots 13 and 14? Response: The existing drainage channels within PebbleCreek do not typically have sidewalks adjacent to them. Robson Communities would like to construct this drainage channel consistent with the rest of the development.

77 Total Parking Spaces Added from Original Proposal Public Comment: Some space is needed for Tour buses and cars to park at a central location like we enjoy today. Response: The Clubhouse Parking has been designed for the uses provided on that site, such as Clubhouse dining, golf, health and fitness, Tennis, and activities at the arts and crafts center. The parking lot was not designed with the intent of providing long term vehicular storage or RV Parking. While the parking lot can be utilized for pick up and drop off of residents by tour buses, long term parking for this type of use was never the intent. 77 Total Parking Spaces Added from Original Proposal

Originally Proposed Sight Line Revised Sight Line (This Proposal) North side Sight Line Originally Proposed Sight Line Revised Sight Line (This Proposal) Public Comment: Existing views and aesthetic design as provided on the north side of the Clubhouse Entry should be maintained on the south side of the entry providing a symmetrical design. Response: By losing one lot at the northern part of the proposed cul-de-sac and reducing the widths of various lots a symmetrical view corridor has been achieved at the entrance of the Clubhouse facility.

Traffic Circulation Public Comment: Response: Response: Will 153rd Lane be a trough street? There is concern that the existing 153rd Lane located in the old model village is too narrow. If this is opened up with a connecting street to the proposed homesites it will make the traffic situation worse. Destination 1 Clubhouse Main Entry North Entry Response: The proposed roadway accommodating the planned home sites will be connected to the existing 153rd lane located within the old model village. After meetings with the City of Goodyear Planning staff and the City of Goodyear Fire Department, this connection to the existing roadway was a requirement. Due to the nature of the existing narrowed roadway within the old model village the fire department wanted alternative emergency access to existing homes within the old model village. The connection as proposed accomplishes this. Response: A majority of the trips generated on the proposed subdivision will procede to Desitination 1. The only circumstance drivers will procede to destination 2 will be to visit neighbors located south of the proposed subdivision. Destination 2 Neighbors Home

Existing Eagles Nest Clubhouse

Landscaping and Open Space to Remain Proposed PebbleCreek Unit 1A Landscaping and Open Space to Remain

Proposing 69% of Allowable Density Comment: Phase I of PebbleCreek consist of approximately 756 acres. The approved Planned Area Development overlay for PebbleCreek Phase I allowed for a density cap of 4 dwelling units to the acre. PebbleCreek Phase I was approved for 3027 dwelling units. Units 1 through 25 within PebbleCreek Phase I recorded a total of 2078 dwelling units. Consequently Robson Communities developed far less homes than that which they were approved for. The actual density built within PebbleCreek Phase I is approximately 2.75 dwelling units per acre. Only 69% of what was allowed under the approved zoning. Phase I PAD : 3027 maximum DU’s Phase I Platted: 2078 DU’s Phase I Proposed: 2093 DU’s Proposing 69% of Allowable Density