Team Members: Sagar Sheth Leonardo Silva Stephen Bennice

Slides:



Advertisements
Similar presentations
Senior Design I Peer Review January 20 th, 2006 PO6208 – ARC Works Sports Bottle Sponsor: ARC Works of Monroe County Team Members: Team Leader George Gooch,
Advertisements

Columbia Machine Core Grinding Team Members Aaron Jeter Jimmie Teague Leland Rutledge Travis Huber Academic Advisor Dr. C. Wern Industry Contacts Mark.
Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
YES U CAN – ADAPTIVE CYCLING University of Delaware, Department of Biomedical & Mechanical Engineering, Newark, DE Team Members: Brendan Farrell, David.
P10457: D-R Process Improvement Compressor Assembly Area Patrick Muldoon Introductions and Welcoming Comments.
EDGE™ Preliminary Project Overview P09123 – MAV Platform Team Members: Joe Hozdic (Lead)Ming Chow Aaron NashBrian David Giovanni Sorrentino.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
Team Members: Bryan McCormick (ME) Andy Freedman (ME) John Kreuder (ME) Ken McLoud (ME) Jon Holdsworth (EE) Gabriela Santa Cruz (IE) Thermoelectric Module.
Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan.
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
R·I·T Kate Gleason College of Engineering Design of a Tensile Load Frame for a Scanning Electron Microscope Senior Design Project Project Manager.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Multidisciplinary Engineering Senior Design Project 6218 Soft Tissue “Tensile” Tester Preliminary Design Review 2/24/2006 Project Sponsor: Bausch & Lomb.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
Detailed Design Review of Magnetic Field Centering Device Project # P08028 “Develop a Design and Methodology to Ensure the Concentricity between the Magnetic.
Baltimore Tool Chisel Test Stand Baltimore Tool President: Harry McCarty Baltimore Tool Representative: Dennis Shewbridge Consultant: Peter Popper Team.
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
Background Cooper Crouse-Hinds Industries is a leader in the manufacturing of luminaires, an encased lighting system, for hazardous locations. These luminaires.
Mechanical Engineers: Brian Church Tyler Breitung Michael Oplinger Electrical Engineers: Anthony Salmin Ross Bluth Stephen Mroz Sponsor: Dr. Roman Press.
P14311: PCB Isolation Routing System Final Presentation Team Members: Matthew Clark, Marley Collier Sears, Sarah Duman, Richard Kalb, Joseph Post, Zoe.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Multidisciplinary Engineering Senior Design Hardinge Universal Turret Project Critical Design Review May 13, 2005 Project Sponsor: Hardinge.
Supply Chain Management Ontology Kanchan Karadkar MS in Industrial Engineering December 2, 2013.
Volume melted in batch >= 20 gallons Flow Rate >= 50 lbs/hr Width
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
WHY IT Leader Corey Callaway Members Lee Warwick, John Van Gieson.
Team SHARP February 10,  Sponsor ◦ Dr. Will Tracz  Faculty Coach ◦ Robert Kuehl  Members ◦ Samuel Goshen ◦ Leo Torbochkin ◦ Dan Edenhofer ◦ Dominic.
Chapter 15 completion of the design of a power transmission The big picture 15-1 objectives of this chapter 15-2 description of the power transmission.
Customer Needs Increase Productivity Safety of Machine Minimize Physical Exertion Reduce Downtime Complete through cut of straws on first actuation with.
The Engineering Design Process Remember: Engineering is a team sport Robert Boyle Michelin North America & Wiregrass BEST.
Electrophotographic Cascade Development Apparatus Zachary FoggettiBridget Kearney Dalton MeadRuishi Shen Michael WarrenThomas Wossner.
P13631: Gravity Fed Flow Process Control Teaching Aid An RIT education couples theory in lecture with practical application in lab. In the past, carts.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Measure Phase Automated Palm Pruner Presented by: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith Sarah Trayner.
LEAN OPERATIONS PROVIDE PRODUCTS OR SERVICES IN RIGHT QUANTITY OF RIGHT QUALITY AND AT RIGHT TIME.
This material is based upon work supported by the National Science Foundation under Award No. BES Any opinions, findings, and conclusions or recommendations.
A POCKET GUIDE TO PUBLIC SPEAKING 4 TH EDITION Chapter 32 Technical Courses.
Business Today Unit 2 Manufacturing Review Show the picture – ask students to describe what it depicts.
P11008 ArcWorks Straw Cutting Device May 13, 2011 Ian Balbresky-ME/Pneumatics Lead Tyler Banta-ME/Design Lead Matthew Estock-ISE/Project Manager Mark Vaughn-ME/Fabrication.
Supply Chain Customer Order Decoupling Point
Balance Training Bicycle
ASSEMBLY MODELING & BILL OF MATERILS
Glass Cutting Wire Saw Senior Design Team P16601: Guide Rollers
Turbomachinery Flow Visualization P08453
Concept Level Project Plan P08008 – ArcWorks Process Improvement
End of DPM Presentation P08405—Novel Materials Technology
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
ArcWorks Process Improvement P08008
Introduction to New Product Development (Documentation)
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
P14551: Multi-Process 3-D Printer
Multidisciplinary Capstone Design:
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Stand Alone Group Members: Jaime Alvarez Austin Chamberlain Trey Smith
SENIOR DESIGN PROJECT P08455
Multidisciplinary Capstone Design:
Balance Training Bicycle
Team Members: Sagar Sheth Leonardo Silva Stephen Bennice
ArcWorks Process Improvement P08008
Final Project Review -Senior Design 2
SENIOR DESIGN PROJECT P08455
Potential Future Improvements
Value Engineering in a Manufacturing Facility
Final Status Update P09006 – Upper Extremity Exerciser
System Dynamics Filtering Laboratory
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

Senior Design I – Concept Review P07008 – ArcWorks Wash Bottle Assembly Team Members: Sagar Sheth Leonardo Silva Stephen Bennice Gabriela Jaramillo Eric Van Hemel Robert Veiders Faculty Guides: Dr. DeBartolo Dr. Marshall

Project Objective’s Design automated process incorporating all three bottle sizes Reduce human contact with bottle during assembly process Minimize rejected assemblies Apply lean concepts to wash bottle production line

Key Customer Needs Can accommodate different size bottles Should be able to produce large quantities of assemblies Should require minimal force to complete assembly Should create good assemblies The unit should not create additional disabilities for the operators

Basic Assembly Components Completed Assembly

Current Process Assembly Process

Bill of Materials

Engineering Metrics

Current Layout

Workstation - Before

Workstation – Final Flow

Workstation - After

Machine Demonstration