CMS Perugia Gantry Status Report

Slides:



Advertisements
Similar presentations
1 Liverpool Production Status Week of 23 February 2007.
Advertisements

1 Liverpool Production Status Week of 02 March 2007.
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Francesco Palmonari & Riccardo Ranieri Università degli Studi di Pisa e Firenze INFN Sezioni di Firenze e Pisa CERN FINAL VERSION 2 nd November 2006 Geometry.
ATLAS Module building at Glasgow
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
TOB Production - January of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Brussels Gantry Ê Problems with vacuum chambers in plate 4 mostly solved by the workshop in Aachen (thanks) Ë Problem with rotation motor (U-motor) 4 motor.
GuidoTonelli /TK_GM/CERN/07_12_05 1 TIB/TID Status Report (on behalf of the INFN consortium) STATUS OF THE INTEGRATION ACTIVITY OF THE TIB/TID_FWD TIB-MTCC.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
Profiler Mechanics Update
Berkeley status Aug 10th, 2012.
Status Report on Bonding at Catania
BSS Prep work at CERN and Acceptance of Parts
Status of works on the Collaboration Contract between IHEP and FAIR
Status of Prototype Preparation and SiPM Characterization
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
SCHEDULE Nov 1st - Assembly Table Complete
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Report on Working Group # 2 The MU2E detector
Status Brussels GANTRY
Silicon Strip Tracker MPR November 2004 CMS TRACKER COLLABORATION
GLAST Large Area Telescope:
Hamburg Bonding Report
Results from module testing
A. Kaminskiy, CMS Tracker week , Apr 2004
Vienna Module Production
CMS Perugia Modules Production Review
Module production in Italy
TEC Module Production Overview
Bari production centre resp. M. de Palma
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Module Production in Brussels
L.Fiore Gantry Meeting during the CMS TK week
Module Production in Brussels
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
A. Kaminskiy, CMS Tracker week , Apr 2004
TOB Module Production Overview and Plan
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
First prototype module released from the assembling platform
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Presentation transcript:

CMS Perugia Gantry Status Report tRACKER WEEK 21/07/1999 CMS Perugia Gantry Status Report D. Benedetti, M.Biasini, E.Babucci, M.Giorgi, M. Nastase, V. Postolache, F. Velcea CERN 20-04-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

Marco Giorgi CMS Perugia Outlook Hardware Status: Tib stereo and Tid assembly plates Tape on Pickup tool Modules Production: Present Status Cern 20-4-2004 Marco Giorgi CMS Perugia

TIB stereo and TID assembly plates 2 Tib Stereo left plates ready 2 Tib Stereo right plates almost ready TID Layer 1,2 R-phi plates on work on industry TID Layer 3 R-phi plates technical drawings ready TID stereo plates: waiting for final frames drawing Cern 20-4-2004 Marco Giorgi CMS Perugia

Marco Giorgi CMS Perugia Tape on Pickup Tool “Blue tape” under sensors pickup tool to prevent scratches Cern 20-4-2004 Marco Giorgi CMS Perugia

Marco Giorgi CMS Perugia Modules production 346 modules assembled from 3-12-03 to 13-4-04 228 TIB R-phi L34 modules 118 TIB R-phi L12 modules 248 produced @ full rate (8 modules/day) 2 modules faulty 336 modules shipped to bonding centers (Pisa, Padova) Cern 20-4-2004 Marco Giorgi CMS Perugia