CMS Perugia Gantry Status Report tRACKER WEEK 21/07/1999 CMS Perugia Gantry Status Report D. Benedetti, M.Biasini, E.Babucci, M.Giorgi, M. Nastase, V. Postolache, F. Velcea CERN 20-04-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA
Marco Giorgi CMS Perugia Outlook Hardware Status: Tib stereo and Tid assembly plates Tape on Pickup tool Modules Production: Present Status Cern 20-4-2004 Marco Giorgi CMS Perugia
TIB stereo and TID assembly plates 2 Tib Stereo left plates ready 2 Tib Stereo right plates almost ready TID Layer 1,2 R-phi plates on work on industry TID Layer 3 R-phi plates technical drawings ready TID stereo plates: waiting for final frames drawing Cern 20-4-2004 Marco Giorgi CMS Perugia
Marco Giorgi CMS Perugia Tape on Pickup Tool “Blue tape” under sensors pickup tool to prevent scratches Cern 20-4-2004 Marco Giorgi CMS Perugia
Marco Giorgi CMS Perugia Modules production 346 modules assembled from 3-12-03 to 13-4-04 228 TIB R-phi L34 modules 118 TIB R-phi L12 modules 248 produced @ full rate (8 modules/day) 2 modules faulty 336 modules shipped to bonding centers (Pisa, Padova) Cern 20-4-2004 Marco Giorgi CMS Perugia