LHC Operations overview Week 28 – Getting back

Slides:



Advertisements
Similar presentations
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
Saturday 24 March 2012.
Friday 15th June 01:11 Injection.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary Friday h38: Ramp down and pre-cycle.
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Saturday 30th June - Sunday: Rocky !
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Mike Lamont, Jorg Wenninger
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Finally.... We had to wait a long time.... We had many problems....
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Summary Thursday h21: Stable beams fill #1303.
Wednesday 10/5 Cryo recovery until 18:30
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thursday 26th July 13:21 Fill 2880 beam dumped
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Tuesday In the morning test cycle with probe for Q’ measurement.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday – Morning and Evening
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday 14:30 Fill 2011 dumped.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday Luminosity production 1380 bunches
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

LHC Operations overview Week 28 – Getting back Coordinators: Mike Lamont, Jan Uythoven LHC Operations overview Week 28 – Getting back 18/07/2011 LHC 8:30 meeting

Int. & lumi’s Friday – Sunday Evening Emit too small 264 bunches 1092 bunches Nominal emittance Again 820 bunches but: - reduced bunch intensity - Larger emittances - Wait 1 hour at injection 820 bunches Slightly smaller emittance 18/07/2011 LHC 8:30 meeting

Monday – Cryo Recovery & Problems Cryo recovery following Power Cuts On Sunday around 11 h Plenty of access all over the machine 19:22 Cryo back – sort out faults on the main circuits & BLMs QPS problems on the quench loops S23 and S56 but found ‘magical button’ on Tuesday morning Collimation busy finding back the collimator calibration 18/07/2011 LHC 8:30 meeting

Tuesday – Beam Back, but not operational Access for EPC (supported by QPS) to investigate a possible loose contact on the circuit RSF2.A81B no loose connection was found and EPC changed the power module 15:15 Beam (52 hours after initial lightening strike) Probe beams injected, preparing for TCDQ - TCSG relative position measurement postponed BLM problems Trip of the Q6.L8B1 due to the water flow problems again. Reset but it tripped again - access from the CV team. Tick of list of smaller outstanding items Tue – Wed night Through full machine cycle with probes: OK 18/07/2011 LHC 8:30 meeting

Wednesday – First ramp; sort out TCDQ; checks 9:30 Stable Beams… with 1 pilot and 2 nominals 11:10 Loss maps at 3.5 TeV 12:45 Check relative position TCDQ – TCSG B2 14:45 Collimator position checks at injection 18:15 In parallel scraping of full beam TCDQ – TCSG 21:00 RF phasing check ->access for one bad cavity 22:00 BLM 2.5 V problem With new TCDQ functions: 23:00 Asynch dump injection 24:00 Asynch dump at 3.5 TeV 04:00 Loss maps at injection 07:00 Check injection of trains, 12 & 36 bunches 09:00 Access – 2 hours 18/07/2011 LHC 8:30 meeting

Crosscheck of TCDQ settings with scraping full beam with TCDQ and TCSG TCDQ – beam2 Was touched during the technical stop Wanted to be sure that for same setting still the same position Which was most likely not the case Measurement from 10-March-11 shows an average offset between TCDQ and TCSG of +250 um while measurement from ‘today” shows -600 um Crosscheck of TCDQ settings with scraping full beam with TCDQ and TCSG 18/07/2011 LHC 8:30 meeting

TCDQ – full beam scraping Full beam scraping with TCSG left jaw and TCDQ Find consistent results with measurement performed earlier today offset corrected from 600 um to 500 um (TCDQ jaw too far out) new TCDQ.B2 settings: 450 GeV 15.54 mm 3.5 TeV 6.29 mm put in TCDQ jaw closer in to the beam --> safer for MP TCSG settings remain where they are Generate new TCDQ function W.Bartmann, C.Bracco, B.Goddard & collimation team 18/07/2011 LHC 8:30 meeting

Thursday Access water cooled cables point 8 48 bunches: OK Plus many accesses in the shadow 48 bunches: OK 264 bunches: OK 840 bunches: lost due to software interlock on BLMs Already see increased vacuum activity Lost cavity 2B1 – reconfiguration of interlocks Access the following morning together with ATLAS 18/07/2011 LHC 8:30 meeting

Mini-Chamonix Friday & Saturday morning Access in the morning for ATLAS and RF Faulty temperature sensor on RQTL9.R7B2 Access again Beam only in the evening – continue 840 bunches Beams dumped in squeeze – trip of RQTF.A23B2 00:55 Colliding Beams dumped by UFO on the MKI.D5L2.B1 05:49 Colliding again beams dumped by an UFO again during optimization The instantaneous luminosity for the previous fill went up to 1.11e33 Hz/ub The intensity per bunch was adjusted in the SPS to the nominal and the emittance was around 2.3-2.6, as measured in the SPS on the 36b. 18/07/2011 LHC 8:30 meeting

Vacuum – Friday evening Next time we wait 30 minutes at 450 GeV after finishing injection 18/07/2011 LHC 8:30 meeting

Saturday, 16/7 08:45 trip of sector 81 - QPS glitch; checking QPS; pre-cycle 13:00 Filled – wait 30 minutes before ramp 14:09 At flat top: dumped - UFO #3 IP2 (assigned to MKI-D) 16:15 Injecting for physics – SPS some problems setting up; some injection losses in the LHC Injecting 840b, but lower intensity and emittances up to 3.0 um @ inj. 19:15 Stable beam fill #1952 01:05 Dump fill by operator ! 04:36 Stable beams fill #1953 17/07/2011 LHC 8:30 meeting

The three UFOs which dumped the beam 17/07/2011 LHC 8:30 meeting

UFOs for the fill #1952 and #1953 #1952 #1953 17/07/2011 LHC 8:30 meeting

Conclusions: UFOs 16/7/2011 from Ruediger Three fills dumped by UFOs were analysed In all cases the UFO came from the same area, for B1 close to the MKI in IR2 The loss patterns are nearly identical for all three events The losses UFO for fill dumped at 0552 were very high, and even in point 5 at the TCT the threshold of BLMs was exceeded. The UFO at 0100 was much slower, and had the maximum before the dump (dump on longer running sums). For both other UFOs an increase of the threshold by a factor of 2 might have prevented a beam dump. In case of further UFOs dumping the beam, it is proposed to increase the threshold by a factor of 2 for the monitors indicated in YELLOW in the EXCEL table. However, the storm now seems to be over, conditioned away

Saturated at the TCT !

UFO record The UFO dump today at 05:52:34 was the largest UFO ever seen. With a saturated signal at the TCT and an extrapolated amplitude of up to 148 Gy/s at the TCT The temporal width was 338us. Tobias Baer 17/07/2011 LHC 8:30 meeting

Next 840 fill was better Emittances up to 3 um at inj., 3.7 um at collisions Lower bunch intensities – 1.15e11 Wait one hour before ramping 17/07/2011 LHC 8:30 meeting

..but lower lumi Lumi of 600e30 cm-2s-1 with 807 colliding bunches corresponds to a normalised emittance of 3.7 um! ALICE is also optimized. They are at about 0.07 Hz/ub - while the published target is 0.3 Hz/ub. What we optimized to is in good agreement with the luminosities we have for ATLAS/CMS, scaled by number of bunches, beta star and assuming a population for the satellites of about 0.1% (the scaling gives 0.09). 17/07/2011 LHC 8:30 meeting

Vacuum fill #1952 #1953 #1952 #1953 17/07/2011 LHC 8:30 meeting

Fill # 1953 Waited one hour at injection, but not many UFOs Normalised emittance when going into physics 3.2 urad Compared to 3.7 urad for previous fill 17/07/2011 LHC 8:30 meeting

Sunday 10:15 Dump fill #1953 - access system fault Found indeed an ‘internal door’ half open – YCP03=US450 Same kind of problem in same zone happened before 14:30 Injecting probe beams 16:00 Dumped beam at inj., RQTL9.L3B2 QPS trip - OK to continue 17:41 Finished injecting and wait one hour before ramping 19:34 Stable beams fill #1954 - 1092 bunches -lumi's 1.16e33: back in production! 22:58 Beam dump due to RF HOM temperature … most likely a glitch XPOC error on BLM at TCDQs, both beams: just above threshold Refill 1092 bunches, fill #1955 03:42 Stable beamsLower lumi’s, due to larger bunches, presently in 18/07/2011 LHC 8:30 meeting

Vacuum second 840b and 1092 bunches Vacuum not any worse: conditioned 18/07/2011 LHC 8:30 meeting

UFOs 1092b fill Some larger UFOs at injection, Not only at the MKI Burned off 3x MKI at injection ramp 18/07/2011 LHC 8:30 meeting

Fill #1954 1092 bunches, 1042b in collisions, only 1.12e11 p+/b need normalised emittance of 2.4 urad to get to the instant. lumi! Back in business! 18/07/2011 LHC 8:30 meeting

Some smaller lumi’s, bunches a bit larger Present fill #1955 Some smaller lumi’s, bunches a bit larger 18/07/2011 LHC 8:30 meeting

Conclusions Back at production It was tough getting back after the TS and Power Cut on Sunday one week ago Many accesses Spent quite some time on verifying systems touched by either the TS or the Power Cut Once the system was back the ramp in the number of bunches got stopped by UFOs at 840 bunches Got around this by conditioning with two fills with 840 bunches: Larger emittances, around 3.0 um at injection, 3.2 - 3.7 at collision Smaller bunch intensities of around 1.15e11 Wait for the UFO storms at injection for about one hour Next fill with with 1092 bunches producing 1.2e33 lumi Still small bunch intensities of 1.15e11 But emittance at collision of only 2.4 urad Vacuum also recovered – ‘together’ with the UFOs Back at production Integrated lumi inching up again 18/07/2011 LHC 8:30 meeting

Next coordinators: Barbara and Mike (again) Plan Keep: 50ns_1092b+1small_1042_35_1008_108bpi  Back to bunch – bunch collisions in Alice Again 1.15e11 per bunch Back to nominal emittances (fill #1954) Dump this fill during the afternoon Next fill: 50ns_1380b_1331_0_1320_144bpi12inj.txt (luminosity production) Check MKI kick length Following Mini-Chamonix and UFO experience Stepwise decrease of emittance and increase of bunch intensity Next coordinators: Barbara and Mike (again) 14/07/2011 LHC 8:30 meeting