Intensive Cooling Installation Including air cooler and shower
Intensive Cooling Installation Constant core temperatures regardless of product diameter Direct packaging after cooling process Safe process control Reduction of process time Decreasing weight loss Fast cooling for less contamination Objectives
Processes Showering Cold air cooling (approx. +1 °C air temperature) Cooking facility (as an option) Products Natural casing Packed product Standard Air cooler made of stainless steel core tubes with epoxy-coated aluminium fins Option Cleaning system (air cooler made of stainless steel core tubes and stainless steel fins) Intensive Cooling Installation Including air cooler and shower Machine unit
Intensive Cooling Installation Silicone gasket between the wall, floor and chamber elements Insulated elements with PU-foam The base of the chamber is shaped like a tray Chamber construction
Intensive Cooling Installation Entrance options
Width of 1920 mm (single row) (1750 mm, option) Width of 3300 mm (double row) Intensive Cooling Installation Available sizes 14 kW cooling power per trolley
Intensive Cooling Installation Fresh air Exhaust air Cold water 4 bar Cooling agent Air cooler Process scheme
Intensive Cooling Installation Air Flow Principle Function of air change flap Higher flow rate on the product Higher flexibility when changing products
Intensive Cooling Installation Cold water recycling system
Intensive Cooling Installation Cold water recycling system Processes Showering with cold water +1 °C Cold air cooling (approx. +1 °C air temperature) as an option Products Packed product Presstower Big caliber products Double-layer products or trolleys with many layers Standard width of 1920 mm (single row) Energy saving system due to recycling process
Intensive Cooling Installation Cold water recycling system Presstower or big caliber products
Intensive Cooling Installation Cold water recycling system Double-layer products or trolleys with many layers
Intensive Cooling Installation Cold water recycling system Cleaning Pipework (rinsing) Tank (manual cleaning, lance) Chamber (automatic cleaning possible, foam/water drainage
The system is not suitable for: Cooking processes (intensive cooling area) Open products or products which need to be flushed Using low drains Intensive Cooling Installation Cold water recycling system
Transit door, lifting door or roller door Side shower for many layers or big caliber Automatic door opener Cooking facility with steam (not in combination with a roller shutter) Automatic cleaning system Cold water recycling system for special products 10 display Intensive Cooling Installation Basic options