Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
LHC – week 48 finishing up the ioning Coordination: Gianluigi Arduini & Mike Lamont.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Sunday 28 Nov. 00h00: Stable beams # x 121 b. Peak lumi 2.0e e25 cm-2 s-1. 09h52: Dump fill # delivered 440 (mb)-1. RCBCH8.L5B1 trip.
Wednesday September 14th
Summary Week 47 + Start Week 48
Summary Friday h38: Ramp down and pre-cycle.
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Tuesday 11th September LHCb dipole presently fault off
Wednesday 5th September - morning
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Summary of ion week 48 Last beam OP summary of 2010 Week 48
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Wednesday 31 October: Morning
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Coordination by E. B. Holzer & J. Wenninger Production
Friday March 4th 08h32: Access for beam dump system.
LHC Morning Meeting - G. Arduini
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
LHC Morning Meeting - G. Arduini
Not the most productive 24 hours on record
LHC Morning Meeting - G. Arduini
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Saturday 3rd November - morning
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Another Immortal Fill….
Wednesday 26 October 2011.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
Monday 152 bunch operation summary
Presentation transcript:

Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA Ludo Mourier (VSC) and Cryo operators et al Various accesses in shadow ATLAS; ALICE; QPS: installation of measurement device for beam induced quench test in L7; BI; and RF (change of klystron filament measurement sensor). 16:30 cryogenics conditions in S34 OK ELQA team working through the afternoon 17:00 EPC finished the de-condamnation of circuits. 11-11-11 LHC status

DFBLC/DSLC Type of vacua: Beam vac, Cryo insulation vac, anti-condensation vac => They should never be mixed !!! Vac volumes separated, each pumped separately Heater electrical part protected in case of power failure and re-icing Serge Claudet 11-11-11 LHC status

Wednesday evening Revalidation of circuits via HWC powering tests. PIC2-Circuit quench via QPS and PNO.A3 were done on the following: RQS.A34B2, RQTL7.R3B1, RQTL7.R3B2, RQTL8.R3B1, RQTL8.R3B2, RQTL10.R3B1, RQTL10.R3B2, RQTL11.R3B1, RQTL11.R3B2, RQT12.R3B1, RQT12.R3B2, RQT13.R3B1, RQT13.R3B2, RQTL9.R3B1, RQTL9.R3B2, RSS.A34B1, RSS.A34B2, ROD.A34B1, ROD.A34B2, ROF.A34B1, ROF.A34B2 22:57 MP3 confirmed all circuits tested are fine. PIC 2 circuit quench via QPS and PNO.a3 have been carried out. Resistances have been measured and no relevant changes have been found! Precycle can be launched Mirko, Matteo, Sandrine 11-11-11 LHC status

Wednesday night 23:00 Pre-cycling 23:15 Etienne just called to say that MKD-B2 generator is faulty and has a problem at the level of the power trigger unit/controller. 00:25 Access starting in PM65, Etienne, Markus and Diego. Etienne changed the power trigger controller card on MKD-G (B2) which turned out to be at the origin of the generator fault. He suspects a problem with the ADC on that card. After the card change Etienne performed a series of local pulses to validate the correct functioning of that device. Problem with the automatic space allocation in the LSA database – resolved by Chris Roderik TI8 PC problem - EPC piquet power cycled the electronics 11-11-11 LHC status

Systematic offset introduced by OFB in R&S Thursday morning 03:00 Beam in 05:00 Stable beams #2334 Systematic offset introduced by OFB in R&S 11-11-11 LHC status

Today End-of-fill Re-fill for Van der Meer scans checks of luminosity scan knobs range/Software interlocks – VdM precursor, Atlas length scale calibration Re-fill for Van der Meer scans 200ns_358b_356_336_0_24bpi15inj_IONS normal "high intensity" 200ns ion batches verify satellites and ghost charge with LDM (see FIRST FILL: ALICE SECOND FILL: ATLAS & CMS (Friday) 11-11-11 LHC status

Incoming Ion Quench test MD (> 8 hours). Proposed for Mon 5/12 Aperture scan in point 2 at 3.5 TeV squeezed – proposed to skip it ADT tuning and verification tests (2 hours total)  no real need of damper excitation for Quench  proposed to skip it. ADT: physics fill with gated damping (24 bunches not damped) to assess possible coexistence damper/BBQ measurement - keep

Philippe Baudrenghien Cavity 2B1 back in action Following the intervention of the RF power team to-day, we have decided to switch cavity 2B1 back in action... Modified the functions (voltage partition) accordingly in both filling and ramp. Incorporation should be OK. Let it ON till we inject beam (whenever that is). If it trips, call Luca and, if we switch it OFF, call PB to revert the functions. Nothing changed in total voltage: capture with 8 MV, ramping to 12 MV Philippe Baudrenghien 11-11-11 LHC status

Satellite & ghosts: fill 2334 Plots from Adam Jeff Satellite & ghosts: fill 2334 Overall the situation is rather good. ~3% although we got cases down The satellites at 10 and 15 ns disappeared but we have now some more satellites at 5 ns