MAX IV Beamlines Maintenance

Slides:



Advertisements
Similar presentations
Commissioning Approach Integrated Service Solutions
Advertisements

Utility Management Providence Health System - Oregon Environment of Care.
André Augustinus 16 June 2003 DCS Workshop Safety.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Medical Gas Alarm Panels
Crane Operations Objective
Temporary Configuration Change Mike Hayes Exelon Nuclear.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
1 Chapter 2 Socio-technical Systems (Computer-based System Engineering)
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Assessment Outcomes 2 and 3 Russell Taylor. Assessment Outcome 2 Set-up an operational computer system with a range of computer hardware Practical & Theoretical.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Unit 201: Health and safety in building services engineering
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
MICE hydrogen review Approval process. Process Working group Document pack PPD Director & ISIS Director Prerequisite testing Completed action list Approval.
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
Installation of the T600 at Fermilab CSN2, September 22,
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
NFPA 99 – 2012 Building a better medical gas maintenance program.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Electrical system : Operator station PLC display Engine under operation - Operating the unit is carried out from the Operator Station. - Two rotary switch.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Global Clinical Engineering Success Stories Establishment of National Health Technology Management System for Public Hospitals Name: Bilal BECEREN Affiliation:
With. Project Overview  Introduction to Factory Automation Numerical Control  Build an autonomous robotic solution  Testing an autonomous robot build.
Crab Cavity Technical Coordination meeting:
IBBelle: Status & Plans
Helicopter B1 and B2 Technician Continuation Training
World Health Organization
IT-4189 Supply and installation of a cryogenic distribution system
protoDUNE – single-phase Instrumentation - Gas Analyzers
Chapter 18 Maintaining Information Systems
PLC-based control systems at SOLEIL - ICALEPCS 2017
How SCADA Systems Work?.
Clinical engineering Lecture (7).
CRYOGENICS OPERATIONS 2008 Organized by CERN
Status of the cryogenic system for B180
IBBelle: Status Commissioning at MPP Transport to KEK
The Fermi National Accelerator Laboratory is a U. S
Mathew C. Wright January 26, 2009
Preventative Maintenance & Service
Chapter 13 Quality Management
Charge 2. Equipment Protection 3. Definition and Documentation
Overarching Commissioning Plan
HAZOP Guidewords Base Set
Chapter 8 Software Evolution.
Workshop commissioning Installation Coordination at ESS
PSS verification and validation
The Survival Plan.
Ola Ingemansson Electrical & Instrumentation Engineer
Parker domnick hunter. Safety of Electrical and
Operation of Target Safety System (TSS)
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
COMPUTER MAINTENANCE AND TROUBLESHOOTING 1 COMPUTER SCIENCE / ENGINEERING DIPLOMA II.
Presentation transcript:

MAX IV Beamlines Maintenance Giulia Orlando, Beamline Project Office October 25th 2017

Overiew April 2017  start of the work to set up Beamlines Maintenance plans, i.e. individuate and establish a process to get an overview of the maintenance activities that are needed at MAX IV beamlines. In scope:”beamline specific” components (from the Insertion Device down to the Experimental station) + sub-systems components serving the beamlines (such as Electricity, Cooling Water etc.) Types of Maintenance: Preventive maintenance Condition based Maintenance (Inspection or signal) Corrective Maintenance External Requirements • Preventive Maintenance: activities carried out at predetermined intervals aimed at reducing the failure risk or degradation of the equipment. Also calibration to be included. • Condition based Maintenance: Maintenance based on specific situation that pops up after ad hoc inspection or analysis of signals in real-time. • Corrective Maintenance: Repair • External requirements (authorities, certifications, quality…)

Main steps Who is the ”owner” of a specific component and is therefore responsible to make sure that maintenance is carried out? How does maintenance activity look like? Who performs it? Do we need spares in storage? Eventually, how much does it costs? A. mapping system and sub-systems B. collecting information in a standardized way C. making it available to everyone at MAX IV D. input for a maintenance software

A. Mapping system and sub-systems Cryogenics Compressed Air Ventilation Gas system Building Lyfting devices PLC Electricity Cooling water Vacuum

A. Mapping system and sub-systems Beamline Cryogenics Gas nitrogen Compressed air Ventilation Lifting devices Building Gas system Insertion device Front end Optics Experimental Setup Cooling water Electrical System Vacuum PLC automation Controls & IT First challenge. Define limits List of components and identifying owners trying to be as detailed as possible so that nothing falls between the stools (ex cryogenics) . We wanted to reflect the complexity of a beamline still giving structure to the whole process Safety Building Services BM/BO Engineering KITS Safety

B. Collecting information in a standardized way The template  Excel sheet, trying to standardize it as much as possible for different systems. One sheet for every beamline + a sheet for every sub system (valid for all the beamlines) FinEstBeAMS is acting as a pilot for beamlines, modified Control Hardware List, to include Mainteance Plan. Frequently updated document, early design phase. Sub-systems sheet  almost all of them have been started and have different state of progress. Every sheet is under responsibility of the system or sub-system owner These sheets do not represent a schedule, they are just a descritpion of Maintenance. On the left list of components, plus criticality of component. On the right description of maintenance

C. Making it available for everyone at MAX IV Power Point Presentation, available on Alfresco Alfresco link to Beamline Control Hardware List, Alfresco link to ”X” sub system Maintenance plan Plus some qualitative information, hard to include in a .xls sheet We will soon present the work we have done for other beamlines to agree with them about the procedure and start the process at facility level

C. Making it available for everyone at MAX IV/example Cryogenics 1 Sub system owner: Anders Månsson +46-709 32 33 44; Anders.Mansson@maxiv.lu.se OBS Marcin Bielawski is responsible for gas monitoring (see Nitrogen gas slide) System limits: the Liquid Nitrogen system is completely “owned” by the sub-system owner except cryo-coolers and the circuit between the cryo-coolers and the beamline components which are on the Beamline Manager side. OBS: Cryo-robots is on Biomax Beamline manager. Helium system is on FinEstBeaMS Beamline manager (not connected to central PLC)

C. Making it available for everyone at MAX IV/example Cryogenics 2 Maintenance: Link to Excel file Building services is looking into buying a service (Maybe with Cryoterm) that once a year takes care of checking/changing safety valves etc.. it’s for the whole system. Maintenance activities on the central system: some interferences with the beamline operation could occur but biggest activities are performed during shutdown. In addition, there is redundancy on most components. Budget mostly paid by Building services Also, the maintenance of components outside the building is under the responsibility of BS but a contractor performs maint

C. Making it available for everyone at MAX IV/example Cryogenics 3 Maintenance (…continues): Running a script to check if valves work should be done quarterly There is an overview in PLC that will raise an alarm if limit switches for valves does not act in a correct way that’s why they are not in the Excel file to be checked Piping and hoses once every quarter visual inspections to check if vacuum is still OK (problems if you see water or ice) CUFS control unit filling station are controlled locally, Anders Månsson performs yearly functionality test without PLC group Issues/Repair: “Tickets” still the best way it to mail Anders Månsson Documentation: