WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: August 19 th, 2013 – August 23 rd, 2013.

Slides:



Advertisements
Similar presentations
Homework for the week of Sept. 3rd, 2013 Monday Spelling:Spelling: Pages 7 and 8. Reading:Reading: 1 box of the IRR sheet. Use your AR book. Complete in.
Advertisements

Update on FCPS Construction/Renovation Projects June 2009.
Update on FCPS Construction/Renovation Projects July 2009.
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT September 16 th, 2013 – October 25 th, 2013.
Update on FCPS Construction/Renovation Projects May 2009.
Tam Valley School Modernization - Phase 1 Summer 2011.
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: August 5 th, 2013 – August 9 th, 2013.
A Duplex Conversion the First Time Sandra Shuffler Change Manager, Investor, Mom.
CUNY/CUCF NYCCT New Academic Building F.J. Sciame Construction Presentation August 12, 2013.
Revitalization Plan. Revitalization Plan Goals Increase homeowner value by continuing to Invest in both infrastructure and curb appeal.
CITY OF OBERLIN, OHIO _____________________________________________ FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN.
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
EU Market Situation for Poultry Management Committee 29 August 2013.
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: June 24 th, 2013 – June 28 th, 2013.
EU Market Situation for Eggs Management Committee 19 September
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Infrastructure Improvements Dependable infrastructure for CSUCI campus… Dave Chakraborty Director, Planning, Design & Construction.
Phase Difference = Phase Difference = 0.05.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Case Study – St Clair Park Village, Auckland, NZ
Montwood Street & Drainage Improvement Project Solicitation No November 26, 2012.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Dan Packer Construction Management Senior Thesis April 16, 2002
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Rain Water Collection Converting inches of rainfall into gallons of potential irrigation water.
Facilities Steering Committee Meeting 6 Welcome!
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
6.2: Slope-Intercept Form. Linear Equations  An equation whose graph is a line is a linear equation. Ex. y = 3x – 4  The y-intercept is the y-coordinate.
WEEK 1 You have 10 seconds to name…
West Kern Community College District Soil Mitigation Discussion August 2004 Kevin Cobb AIA/ARA, Principal Architect, the Addington Partnership On Man Lau,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Water Recycling. Why? Do you think water should be recycled? Why? How do you think water is recycled?
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Spiral Review Week of August Solve 2, ,327 2.Solve 12, , Write the following number in expanded and word form. 157, Solve.
SAFE ROUTES TO SCHOOL: INFRASTRUCTURE DESIGN TO CONSTRUCTION.
Building Your Future with Mountain Peak Homes Corinne T. Moritz Bella Vista Subdivision, Mountain Peak Homes1.
J OISTS S LIDE S HOW. Joists are shipped to the site and stored in lay-down areas while awaiting erection in their respective bays. They are typically.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
May 2010 Photo provided by the Trust for the National Mall U.S. Commission of Fine Arts Concept Review.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
Administrator Sodexo Performance Survey June 9, 2015.
Building for Learning Project Photo Progress Report September 2010 Project commencement 21 st September 2009.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
Photo Album ABOUT WATER & HEALTH LABORATORY.
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Bond Oversight Committee
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Santa Cruz avenue sidewalks Project
CHANNEL DISTRICT ACTION TEAM
Broward County Transit
This photo was taken in August What has changed since then?
Hopewell Valley Regional School District
Progress Report 11/10/11.
JOISTS SLIDE SHOW.
Project Background Type of building: Mixed-use residential building
Field Photos
Access Hatch Replacement Phase 4
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Facilities Committee Photos of our Facilities
Presentation transcript:

WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: August 19 th, 2013 – August 23 rd, 2013

WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT

Phase 2 precast erection

Phase 2 joist erection

Phase 1 dead man removal

Mechanical area underground plumbing

Roofing delivery

HVAC curbs extension

WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT

Irrigation sleeves

COMED primary conduits

WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT

Curb, gutter & sidewalk demo

Water Main work

NEXT WEEK ACTIVITIES NEXT WEEK ACTIVITIES