NIRANTHARA JYOTHI SCHEME

Slides:



Advertisements
Similar presentations
Partnerships in Power Franchisees
Advertisements

Load Management System
Sistan & Balouchestan Electric Power Distribution Company
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
M.KUMARASAMY COLLEGE OF ENGINEERING PRESENTED BY M.AMUTHAM.RENUGA EIE DEPARTMENT.
Bangalore Metropolitan Region
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
1 RESTRUCTURED APDRP-II IN XI PLAN Scope of Part - B :  Strengthening of Distribution System. Fund Allocation of Part - B:  Proposed fund allocation.
Reactive Power Management - Case study -- Nandan Pathak (AE)
Power Sector SCENARIO in Rajasthan Presented By: Deepak Saxena CUTS Centre for Consumer Action, Research & Training (CART)
DEMAND SIDE MANAGEMENT IN UGVCL A K Verma IFS Managing Director.
KERALA STATE BENCHMARK PARAMETERS BENCHMARK PARAMETERSOF.
PRESENTATION PREPARED & PRESENTED BY ER. PRAKASH NAKATE. D.E.E., D.C.O.  JUNIOR ENGINEER ( Maha Discom ), Section Office, Kandgaon, Tq.Karaveer,Dist.
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
Presented by PROF. A.H. RAJASAB Vice Chancellor Tumkur University, Tumakuru, Karnataka Mobile : , Presented by PROF.
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
1 A. Lipsky, N. Miteva, E. Lokshin Department of Electrical and Electronic Engineering Ariel University Center of Samaria Israel Electric Power Quality.
Electricity Reforms and Regulations in Nepal Navin Dahal South Asia Watch on Trade, Economics & Environment (SAWTEE)
1 R-APDRP Part -A Karnataka June 2015.
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Adaptive Protection of Distribution Feeders Alexander Apostolov, Benton Vandiver.
Page 1 Akshay Prakash Yojana… Driven by Consumer Participation.
10-11-November, 2010 Organised by
Akshay Prakash Yojana A Voluntary DSM Initiative November 2005 
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Oct-2013 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
NIRANTHARA JYOTHI SCHEME
Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.
Page No. 1. Page No. 2 PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT KARACHI PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT.
1 1/118 Welcome to Group Presentation 1/ /118 HPL Group – At a glance HPL Group established in 1956 with product range as: LT Switchgear & Electrical.
1 Mid Day Meal Scheme Ministry of HRD Government of India MDM-PAB Meeting – Karnataka On
PRESENTATION ON AN ORGANIZATION STUDY AT BESCOM
PRESENTATION ON 5 YEARS INFRASTRUCTURE PLAN December 30, 2005.
Water Supply Project (WSP) Eastern and Midlands Region Dublin City Council Environment SPC: Briefing 24 th June 2015.
DHOs REVIEW MEETING 27/04/2015. CRITERIA FIXED BY GOI, MOHFW FOR STAR RATING OF CHC BASED ON HMIS DATA Presented by MOHFW in NPCC APRIL 2014 – DEC 2014.
Water Conservation Update Seaneen M Wilson Division of Water & Audits September 17, 2008.
Extends A WARM WELCOME. Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV PRESENT.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Water Energy Technology (WET) Program Laurie ten Hope Deputy Director Energy Research and Development.
Optimizing Power Availability -- Action Plan for Next Decade Challenges of Distribution -- Investment and Reforms 1.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA April-2014 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 09-June-2014 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
BANGALORE TRANSMISSION PLANNING
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
5 th ERRA Annual Meeting Country News – The Russian Federation Krasnodar Territory Sergei Milovanov Regional Energy Commission – Prices and Tariffs Department.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE Commercial & Industrial Lighting Market Map Debbie Driscoll NEEA.
Issues and Intervention required - Karnataka
RELATIONSHIP BETWEEN A T&C LOSSES And TRANSFORMER FAILURE.
MELD- Maharashtra V. Giriraj
Demand Control Field Trials
UNIVERSAL HOUSEHOLD ELECTRIFICATION SPECIAL DRIVE
SMART GRID 1 1.
Summer Plan: 2013 (1st March – 31st May)
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
MT Division BMAZ Bangalore
Yangon Region Rural electrification plan
Accidents and analysis August 2015
CMPLDWG Composite Model with Distributed Generation Approval
Mid Day Meal Scheme MDM-PAB Meeting – KARNATAKA on
MID DAY MEAL SCHEME Welcome to the presentation on
Responses to issues raised: report as submitted on 4 April 2018
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA
APNIC August 2008 Christchurch, New Zealand
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA
Accidents and analysis January 2015
FINANCIAL HIGHLIGHTS FOR THE 3RD QUARTER & NINE MONTHS ENDED
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 27-Oct-2014
CMPLDWG Composite Model with Distributed Generation Approval
RAPDRP PART A IN KARNATAKA 25th Aug 2014
Presentation transcript:

NIRANTHARA JYOTHI SCHEME Niranthara Jyothi Project is a prestigious scheme of Government of Karnataka, to provide 24 hrs 3 phase power supply to non-agricultural loads like domestic, commercial, water supply, street light, rural industries, milk dairies etc., in rural areas by segregating the agricultural loads, which is a boon to the rural economy. Objectives : This will enable BESCOM to give 24X7 supply to Non-Agricultural loads in Rural areas Reduction in transformer failure Increase in metered sales Reduction in technical losses Improved load management The plan of implementation and progress is shown separately. 1

STAGES OF IMPLEMENTATION Phase I 25 Lots, 260 feeders, 19 taluks. Project cost :Rs 355.85 cr. Expected completion : June-2013. Phase II 24 lots, 289 feeders, 22 taluks. Project cost :Rs 385.71 cr. Work Award issued for 6 Lots, 86 feeders , DWA issued in Nov 2011, Jan-2012 ,works under progress. Work Award issued for 10 Lots ,96 feeders , DWA issued in Oct, Nov 2012,Works under progress. For the 93 feeders, LOI is issued and works under progress.

PHYSICAL STATUS – PHASE -I as on 24.06.2013 269 * No of feeders Note: * All works relating to 11KV Distribution network is completed in respect of 260 feeders and for the balance feeders to be commissioned requires, segregation and realignment of LT lines.

STATUS OF NIRANTHARA JYOTHI PHASE-I IN BESCOM Sl. NO Name of the Circle Name of the Division Lot No Total No of NJ feeders (Actual) STATUS OF NJ FEEDERS AS ON 24.06.13 No. Feeders Completed No. Feeders Commissioned No. of feeders work under progress 1 2 3 4 5 6 7 8 KOLAR Chikkaballapura 8 : Bagepalli 11 SUB TOTAL   Chintamani 9 : Shidlagatta 14 13 TOTAL (A) 25 24 TUMKUR Tumkur 13 : Tumkur-1 16 15 14 : Tumkur-2 9 16 : Gubbi-1 17 : Kunigal-1 18 : Kunigal-2 52 49 Tiptur 11: Tiptur-1 12: Tiptur-2 12 Madhugiri 24: Madhugiri-1 10 25: Madhugiri-2 & Sira-1 26: Sira-2 35 34 TOTAL(B) 99 95

STATUS OF NIRANTHARA JYOTHI PHASE-I IN BESCOM Sl. NO Name of the Circle Name of the Division Lot No Total No of NJ feeders (Actual) STATUS OF NJ FEEDERS AS ON 24.06.13 No. Feeders Completed No. Feeders Commissioned No. of feeders work under progress 1 2 3 4 5 6 7 8 DAVANGERE Chirtadurga 1: Hosadurga 13 Sub Total   Davangere 2: Channagiri 18 15 3: Jagalur 9 27 24 Harihara 4: Harapanahalli 10 5: Honnali 11 21 20 Hiriyur 20: Hiriyur-1 21: Hiriyur-2 16 TOTAL(C) 77 68 BANGALORE RURAL Chandapura 7: Anekal Ramanagara 22: Kanakapura-1 23: Kanakapura-2 19 Yelahanka 19: Hosakote-2 20(A) :Hosakote-1 10: Devanahalli 17 35 33 TOTAL(D) 59 53 GRAND TOTAL (A+B+C+D) 260 240

STATUS OF NIRANTHARA JYOTHI PHASE-II IN BESCOM Sl No Name of the Circle Name of the Division Lot No./Taluk Total No. of NJ feeders proposed Total No. of NJ feeders Completed Total No. of NJ feeders Commissioned Status 1 2 3 4 5 6 7 8 Bangalore Rural Nelamangala 1:Doddaballapura 17 _ DWA issued on 10.11.11 work under progress. Tumkur Madhugiri 9:Koratagere 11 DWA issued on 21.01.12 work under progress Tiptur 8:Chikkanayakanahalli (part-2) WUP Kolar KGF 10:Bangarpet/ 16 Chintamani 13:Chintamani 15 Chiikaballapura 16:Gowribidanur 19 Total 86