Compliance Item 4.2 Compliance Doc. ASA/TE/743-rev1

Slides:



Advertisements
Similar presentations
1 Owner-Occupied Housing Summary of the pilot Item 5 of the Agenda D4 – Price Statistics HICP Working Group Luxembourg October 2007.
Advertisements

Training on occupational classifications. Name of the presentation Introduction ISCO 08 has started to be implemented in the EU countries in several social.
EDIT validation tool item 8 of the agenda Structural Business Statistics Working Group 14 April 2015, Luxembourg Arlind Dobërdolani.
Eurostat Ag.no "Annex 2" supplement to Eurostat Annual Report, October 2015 Working Group on Article 64 and Article 65 of the Staff Regulations Meeting.
Eurojust cases involving crimes against children
Weighting issues in EU-LFS
Update on the UOE 2012 data collection
5. Areas under organic farming
Eggs for consumption Item 8.1
Ag.no. 15 Lessons from the 2015 A65 exercise
Ag.no. 16 Supplement to Eurostat Annual Report, October 2014
No document Ag 08 ESA2010 (SNA 2008)
2.1. ESS Agreement on Learning Mobility (IVET & Youth)
LAMAS Working Group January 2016
Item 1 Eurostat pensions expert group meeting
Data review MILK VALIDATION
ESS Security and Secure exchange of information Expert Group (E4SEG) DIME/ITDG Item 8 ESS Security Assurance Pascal Jacques ESTAT B2 Local Security Officer.
State of legal transposition (1)
Ag.no.16 A65 country manuals and country assessments
SBS Compliance report item 3 of the agenda
3C. Update of Summary of WISE electronic delivery
State of play Article 5 reports
Education and Training Statistics Working Group
LAMAS October 2017 Agenda Item 3.2 Labour Cost Indices state of play Daniel Iscru Hubertus Vreeswijk.
Agenda Item 2.1 SES 2014: follow-up
LAMAS October 2016 Agenda Item 3.2 SDMX tests and revision policies for LCI Hubertus Vreeswijk Daniel Iscru.
1.
LAMAS October 2016 Agenda Item 2.1
Marine Strategy Framework Directive: Transposition and Implementation
Marine Strategy Framework Directive: Status of reporting
LAMAS Working Group October 2014
LAMAS Working Group 29 June-1 July 2016
Progress Report on Annual Financial Accounts
LAMAS October 2016 Agenda Item 3.1 Labour Cost Indices state of play Hubertus Vreeswijk Daniel Iscru.
Update on legal issues Strategic Coordination Group
Item 8.1 Implementation of the 2016 Adult Education Survey
Programme adoptions Cohesion Policy:
Ag.no. 15 Lessons from the 2016 A65 exercise
Item 7.1 – Overview of 2012 UOE data collection
SBS Quality reporting item 4 of the agenda
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
State of play: data transmission, validation and dissemination
Proposal for granting access to HOUSEHOLD BUDGET SURVEYS (HBS)
Item 7.1 – Overview of 2013 UOE data collection
Update on legal issues Strategic Coordination Group
LAMAS Working Group 7 – 8 December 2016
Item 4.3 – Repeal of CVTS legal acts
Education and Training Statistics Working Group Meeting 5/6 June 2012 Item 4.2 Progress report on education survey data and metadata Sylvain Jouhette.
3.6. Impact of population and housing census results on population stocks and on LFS and SILC–follow-up DSS Meeting September 2012.
Quality reporting under Regulation (EC) No 1165/2008
Update on legal issues Strategic Co-ordination Group 7-8 May 2009
Meeting of Water Directors State of transposition and implementation
Water scarcity & droughts
Item 4 Overview of the 2016 AES & 2015 CVTS data collection
FISIM State of play Agenda Item 3.
Update on implementation WG F 27 April 2010 Maria Brättemark
European Statistical Training Programme (ESTP)
Update on legal issues Strategic Coordination Group 23 February 2010
Update on legal issues Strategic Coordination Group
Monthly other slaughtering
Item 3 Observed consistency and revisions
Actions on Data validation
LAMAS October 2018 Agenda Item 4.1 LMI Review – main scenarios
Doc.A6465/16/03 Ag.no.16 A65 country manuals
LAMAS Working Group 7-8 December 2016
IT security assurance – 2018 and beyond Item 2 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
LAMAS Working Group 5-6 October 2016
Transposition and implementation of WFD
Compliance for statistics
EDAMIS3: CURRENT STATUS
Presentation transcript:

Compliance Item 4.2 Compliance Doc. ASA/TE/743-rev1 WP on Animal Production Statistics 13-14 March 2014 Item 4.2 Compliance Doc. ASA/TE/743-rev1

WP on Animal Production Statistics compliance Purpose Agree on Eurostat expectations Watched results Identify Eventual issues In the MSs: changes, questions, needs, etc. In Eurostat: methods, procedures, questions, etc. Priorities for action Conclude Action plans Thank to everyone for the efforts WP on Animal Production Statistics compliance

WP on Animal Production Statistics compliance Methods Comparison of some results Data transmission Drivers: punctuality and completeness Discussions Interpretation of legislation Procedures for particular cases Measurements themselves Outcome Scoreboards Improvements (or not) Limits Working Party room for action WP on Animal Production Statistics compliance

Legislation and commitments Three legal basis for the Member States Livestock and meat (including poultry meat) Milk and dairy Eggs (for hatching, chicks placed and laying) Enlarged to EEA countries (IS, LI, NO) Switzerland (covering also livestock and meat) Candidate and other IPA countries Further commitments Monthly other slaughtering Early delivery of monthly milk statistics (Eggs for consumption) WP on Animal Production Statistics compliance

Availability of statistics (files) Three legal basis for the Member States WP on Animal Production Statistics compliance

WP on Animal Production Statistics compliance Punctuality Combination of factors Design of the national process Adapted to the time table for data transmission National priority and resources Impact of staff issues on the result Medium term effort Feedback from Eurostat (reference exercise + reporting  18 months) + reactivity on the national system A legal issue nevertheless Infringement procedure for 8-day delay would not be cost-effective Repeated non-compliance is considered Action plan and progress measurement EU punctuality Eurostat process to be included EU punctuality = MAX (28 punctuality) WP on Animal Production Statistics compliance

WP on Animal Production Statistics compliance Punctuality Comparison CZ, LT, LU and SK delivered all files in time Average delay summarises worrying cases CY, BE and SK improved by more than 5 days BG, DK, MT, NL, SI and UK more than 10-day later Regulation (EC) No 617/2008 more concerned Impact of structure of dairies Early monthly milk statistics EE, ES, LU, HU, NL, PL, RO and SK met the deadlines ES delivers at 28-38 days ES and PT committed for progressive improvement PT, BG and DE don’t meet Contrasts WP on Animal Production Statistics compliance

Availability of statistics (cells) Completeness Delivered cells / expected cells For a given cell Availability of EU-28 totals  availability of 28 national cells Except confidentiality issues 28 Member States at 97%  EU-28 between 16% and 97% Data user feedback A complex issue Clarity of methodology Maturity of the assessment method Clarity of procedure for particular cases Actual implementation in the individual questionnaires Actual implementation in the process Actual priority for the Member State Improvable Completeness for a reference period may be improved with revisions WP on Animal Production Statistics compliance

Availability of statistics (cells) Results on completeness Corrected assessment of Table B LU and NL provided only full Tables 100% appear in the Table Impact of agreement on trade of chicks Direct for those having agreed Indirect with efforts to provide complete tables Still systematic missing data Livestock categories Milk annual results Reminder Either significant and surveyed/collected Or non significant and zero WP on Animal Production Statistics compliance

WP on Animal Production Statistics compliance Next steps Next steps Action plan where needed CY, EL Regulation (EC) No 617/2008 NO and CH; IS to be assessed CPSA assessment in April: updated assessment Quality report Tables to be provided by Eurostat after the final livestock results for 2013 (15 May 2014) Priorities: critical points Early delivery of monthly milk statistics BG and DE Table C Meeting the deadline with consolidation of Tables B-H GIP forecast Eurostat WP on Animal Production Statistics compliance

WP on Animal Production Statistics compliance Conclusion Some worries Regulation (EC) No 617/2008 DK and IT AGRI CY and milk statistics EL and punctuality Systematic delays or completeness issues Some objectives met Completeness can be reached Punctuality is feasible Efforts pay Improving the weakest points WP on Animal Production Statistics compliance

Thanks for your efforts! Thanks for your attention! Thanks for your efforts! WP on Animal Production Statistics compliance