RO-HU-AT - a pilot project for incremental capacity

Slides:



Advertisements
Similar presentations
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Advertisements

Early implementation of CAM : PRISMA initiative GRI South – SG Meeting Madrid, 30 April 2013.
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Market integration in the CEE countries
GRI SSE Work Plan Project proposal of HEA
29th November 2016 Teleconference
GRI North-West Meeting
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Example for 1:n bundling with three TSOs
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
EU Tariffs Code Update Based on Refined Draft as of 30th October
GRI-S : Infrastructures The Union list of projects of common interest
RO-HU-AT - a pilot project for incremental capacity
Self-evaluation template for GTM Alessandro Ischia, E-Control
26th IG meeting 23th January 2014
Gas Regional Initiative South South-East CAM Implementation Group
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
Background and Process
ERGEG GRI South South East – , Maribor
18th July 2016 Teleconference
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
In depth analysis of TYNDP issues
GRI North-West Meeting
6th Gas Advisory Council Vienna, 29 January Work Program for WS2 Walter Boltz – Andrey Konoplyanik.
In depth analysis of TYNDP issues
Market integration in the CEE countries
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
26th February 2015 Teleconference
RO-HU-AT - a pilot project for incremental capacity
GRI SSE Work Plan Project proposal of HEA
The Incremental Proposal
EWRC-RAE MUTUAL PROJECTS
Self-evaluation template for GTM Alessandro Ischia, E-Control
29th April 2014 Teleconference
Market integration in the CEE countries
RO-HU-AT - a pilot project for incremental capacity
18th July 2016 Teleconference
Gas Quality & TSO – LSO Coordination
GIE Annual Conference Bratislava, September 2006
Market integration in the CEE countries
Questionnaire for the assessment of the main features of
Market integration in the CEE countries
GRI North-West Meeting
In depth analysis of TYNDP issues
29th November 2016 Teleconference
26th February 2015 Teleconference
RO-HU-AT - a pilot project for incremental capacity
Proposer: Malcolm Montgomery Panel Date: 20/10/16
EWRC-RAE MUTUAL PROJECTS
EWRC-RAE MUTUAL PROJECTS
Gas Regional Initiative South South-East CAM Implementation Group
GRI SSE Work Plan Project proposal of HEA
Market integration in the CEE countries
Market integration Security of supply Competition
Presentation transcript:

RO-HU-AT - a pilot project for incremental capacity GRI SEE 08 July 2016, Budapest RO-HU-AT - a pilot project for incremental capacity How to develop functioning markets? Infrastructure needs and initiatives for Europe RO-HU-AT - a key project for Central and South-East Europe

Starting Point 2014 Network users indicated non-binding demand for long term transportation services potential natural gas supplies originating from an upstream project initiative in the Black Sea from Romania (RO) via/to Hungary (HU) and further on to Austria (AT)

Physical gas flows in the region

Capacity at the IPs

PCI 6.24 - ROHUAT Expansion and refurbishment of the existing gas transportation systems

New gas route - ROHUAT

Interconnection points Relevant interconnection points (IP) RO/HU border @ Csanádpalota (IP1) in both directions HU/AT border @ Mosonmagyaróvár (IP2) just in Austrian direction

Incremental capacity process To coordinate the process and to find suitable solutions in the framework of the incremental capacity Regulatory Authorities To express the need for new infrastructure To support the initiative to give valuable inputs Network users TSOs To prepare the open season/ incremental process To plan the necessary construction works

Incremental process time line Execution of the open season Definition of the „rule book“ of the open season Market survey on different capacity allocation methods was conducted by the TSOs in February 2016, Project development TSO coordination PCI 6.24 capacity of 4,4 bcm is expected to be available at latest in 2022 Upstream project initiative 2015 Q1 2016 Q4 2016 Q1-Q2 2017 2014 Timeline

The following 3 allocation methods have been consulted Market survey A market survey on different capacity allocation methods was conducted by the TSOs in February 2016, 13 responses were received. The following 3 allocation methods have been consulted 13 responses form market participants

Method 1 Market integration Ascending clock auction algorithm according to Art. 17 of the CAM NC Bundled capacity offered as single years in the auctions

Allocation rule core logic: Market integration Method 2 3 allocation rounds foreseen Allocation rule core logic: Round 1: 15 year commitment for both IPs Round 2: 1 year commitments for both IPs Round 3: 1 year commitments for single IPs (same as Mechanism 1) Round 1 Round 2

preferred option according to outcome of market survey Market integration Method 3 Bundled capacity offered as single years in the auctions (same as Mechanism 1) If demand > offer, capacities shall be allocated on the basis of the highest individual bidder commitment in all auctions conducted throughout the period of 15 years at IP Csanádpalota and IP Mosonmagyaróvár Allocation rule core logic: NU contribution = price IP1 * demanded capacity IP1 * number of years + price IP2 * demanded capacity IP2 * number of years Method 3 preferred option according to outcome of market survey

Next steps to provide tariffs applying the new methodology acc. to TAR NC by March 2017 “Rule book” prepared by TSOs Open season to be carried out in 2017 in parallel to the yearly auction in accordance with the CAM-auction calendar put into operation 2nd phase (4.4 bcm/y) depending on when the FID will be taken, latest for 2022

 alessandro.ischia@e-control.at  www.e-control.at  + 43 1 24 7 24 810  alessandro.ischia@e-control.at  www.e-control.at Contact

Open season platform?

RO-HU-AT – PCI 6.24 TRA-N-423 (GCA Mosonmagyarovar CS) TRA-N-061 (Ercsi-Százhalombatta pipeline) TRA-N-123 (Városföld CS) TRA-N-018 (Városföld – Ercsi – Györ pipeline)

RO-HU-AT – PCI 6.24 TRA-N-126 (RF – Romanian section, 1st stage) (Podisor– Horia pipeline; CS expansion Jupa, Bibesti, Podisor; phase 1 and 2) TRA-N-377 (RF – Hungarian section, 2nd stage) TRA-N-362 (Black Sea-Shore – Podisor pipeline)

Open issues Platform to be used?