CVE 4070 Construction Engineering

Slides:



Advertisements
Similar presentations
Global Congress Global Leadership Vision for Project Management.
Advertisements

CMGC Contracting at UDOT Program, Projects & Lessons Learned
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Educo Workshop autobiography and action learning.
CPD-aalborg Bente Nørgaard 1 The FWBL process can be described in 5 continuously phases: Contact phase Defining/specifying learning objectives Elaborate.
Team Contracts. Purpose of Team Contract Clarifies team goals & strategies used to meet them Clarifies team goals & strategies used to meet them Increases.
Why Student Perceptions Matter Rob Ramsdell, Co-founder April 2015.
Peru c o n s u l t i n g Sourcing Capability. © Peru Consulting 2013 Peru Sourcing Proposition Peru recognises that there are many drivers which act as.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Six Sigma Black Belt Project Information Prepared: July 20, 2004.
1.Define zoning. 2.Define building codes. 3.List the key players in implementing CPTED. 4.List the two thresholds of review for new construction or redevelopment.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
YOUR LOGO January 13, 2014 ALL Site Coaching Session.
Evidence based research in education Cathy Gunn University of Auckland.
Better Return to Work Outcomes –case studies. 2 BETTER RETURN TO WORK OUTCOMES THREE ELEMENTS >Technical Skills >Resources >Communication Skills.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Partnering & Team building. Litigation – not having teamwork or partnering.
CVE 4070 Construction Engineering Civil Engineering Jobs Prof. Ralph V. Locurcio, PE.
Masterful Facilitation Model. Facilitation Cycle Designing Intervention Facilitating &Evaluating Results Initial Contact & Clarify Objectives.
CON 2001-CVE 4070 Construction Engineering Project Organization & Stakeholders Prof. Ralph V. Locurcio, PE.
Important Idea, Skill or Attitude I learned from this course which I can use in my job: The advance facilitation processes (only stage 2: Clarify desired.
Team Charters Tools & Techniques.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
Social Roles and Relationships.
1/7/2016Prof. Ralph V. Locurcio, PE1 CVE 4074/5074 Leading Construction Operations Class Introduction.
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Project Organization Test #1 review Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
National ITS Architecture Deployment Support October 27, 2009 T3 Webinars are brought to you by the ITS Professional Capacity Building Program (ITS PCB)
2/25/2016Prof. Ralph V. Locurcio, PE1 CVE 4074/5074 Leading Construction Operations Class Introduction.
Dialogue Facility – Bridging Phase November 2015 Workshop DIRCO.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
CIT 341: IT Project Management. Objectives Understand the main concepts of project management Understand how Projects are Delivered within Budget Learn.
Copyright © 2009 South-Western, a part of Cengage Learning All rights reserved. Power Point Presentation by Dr. Leslie A. Korb Georgian Court University.
1 Different Development methodologies Waterfall Spiral Structured systems analysis and design methodology(SSADM) Rapid Application Development (RAD) Prototyping.
HPD_TAS COPA 26 March 2014 H Gumede. Discussion Points 2 1.Mining Charter and Culture Transformation 2.PoE Significance 3.PoE Discussion.
“Outside the Box” Conference Straus Institute for Dispute Resolution
Class #1 Contract Delivery Systems
Preparations for REF 2020: MDS College Assembly
Invest in Training and Professional Development
HEALTH IN POLICIES TRAINING
Denise Elliott Interim Head of Commissioning Adult & Health Services
Chapter 3 Managing the Information Systems Project
Customer Relationship Management
Customer Relationship Management
How to Talk to Families about the 3 Global Outcomes and the EI Program
3-Day Information Workshop A Foundation Course in Human Values & Professional Ethics Presenting a universal approach to value education -through self.
Skills Workshop Mentors & Mentees
THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS
CVE-1000 Intro to Civil Engineering & Construction Topic:
CE362 Technical Communication & Documentation
The Practice of Generalist Social Work (2nd ed.)
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
CVE 4070 Construction Engineering Class #9: Project Tour
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
How to Talk to Families about the 3 Global Outcomes and the EI Program
Poole Grammar School Accommodation of Yr 7 Children
ACSM in 2010: Overview of SG Achievements
ESF Evaluation Plan England
Getting to Know the Curriculum-Planning Process
The Best Contact Center Indonesia 2019
Business contribution
The Best Contact Center Indonesia 2019
Bilateral Relations under The Active Citizens Fund Slovakia
Director, CPF Financial Services Limited
Framing Grants for policy Research
Field Instructor Workshop
Presentation transcript:

CVE 4070 Construction Engineering Project Delivery & Organization Review Prof. Ralph V. Locurcio, PE

Project Delivery Process… Programming Process Design Process Construction Process

Constructon Organizations…

Project Organization-design

Project Organization-const mgt…

Project Organization-const opns

Project Organization…

The Partnering Process… The purpose: establish working relationships early in the project to facilitate work progress Implement via workshop @ NTP Clarify roles & responsibilities Issue resolution process Measurement & evaluation process All sign partnering “charter” Key elements: trust, equity, strategy Requires commitment of all players Measurement & periodic follow-up essential

Concepts to Remember… Government vs. private contracting Different selection process Documentation is key All contracts differ; read your contract Design-build is faster but more difficult & risky Only Resident Engineer issues directives Only Project Manager can make changes Professional CM firm must be independent One-to-One concept; single point of contact