TEC Services Status 30/12/2018 Nick Lumb.

Slides:



Advertisements
Similar presentations
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Advertisements

Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
TIB cables and optical fibers ______________________________________________________ 13/7/06 CMS-Pisa group.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
LINEAR MEASUREMENT.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Cosmic Test Rig  Mechanical structure to hold 4 PCBs  Minimise inter-sensor spacing  Rigid during ~weeks test run  Mounting for scintillators above/below.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
VOLUME Lesson Objective By the end of the lesson I should be able to Find the volume of a rectangular prism.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
The HCAL barrel absorber structure
Service channels between Tracker and PP1 TK-PP1 Cable Channel Review 14 September 2007, Antti Onnela, CERN Installation order and Component status Mock-up.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
DETECTOR PIXEL CHIP MCM PIXEL BUS COOLING TUBE PIXEL BUS AND PILOT MCM CONNECTIONS (1) SDM comp LASER DIODE Space reserved (15mm) for connections.
V. Bobillier1 Cable installation status.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
EC: 7 DISK concept Preliminary considerations
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
IFR mechanics status of the detector & tooling development
Status and plans for the pigtails
STRAW TRACKER SYSTEM CAD STATUS :
Service channels between Tracker and PP1
Service channels between Tracker and PP1
Update of MVD services and requests
End-cap Mechanics FDR Overview of the Project
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Mechanics: (Tim).
Services Layout – Update
Chamber Design and Integration RE3/1 and RE4/1
First of all we will remind some numbers:
Work packages status in Torino and perspectives
HCAL Modules -First Ideas
Work flow Lyon Karlshrue 14/11/2018 Nick Lumb Preparation (no TEC)
Services mock-up Full-scale mock-up of one half end-cap.
SPACE FOLDING TABLE PRODUCT SHEET FURNITURE INSERT YOUR PRICE HERE
HERD Tracker Layout Considerations
Scintillator HCAL: LOI issues
General wiring procedure for a new instrument
TEC assembly and commissioning at Lyon
Компания Reichle & De-Massari (R&M)
Flex studies status. Module flexes: 4 types; M4, M2, M1plane, M1mountain. constraint: components and bondings on the same side. Constraining for the wing.
Rack Placement Chopper Workshop
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Proposal to modify the TEC control loop schema
Presentation transcript:

TEC Services Status 30/12/2018 Nick Lumb

Services Optical fiber ribbons Cooling loops Read-out ribbon routing and lengths fixed from mockup study: tables with F. Vasey Control ribbons (small percentage of total) depend on choice for control loop scheme – see next talk Mechanics to hold MU connectors at prototype stage Cooling loops 316 stainless steel Flexible sections for connections to petals and beyond TEC Call for tender out: will receive prototype soon Multi-service cables and connectors 30/12/2018 Nick Lumb

General layout 30/12/2018 Nick Lumb

Routing to petals (1) 30/12/2018 Nick Lumb

Routing to petals (2) A 2 3 B 1 30/12/2018 Nick Lumb

Lengths A to B (mm) Disk Conn. 1 Conn. 2 Conn. 3 1 335 317 327 2 321 291 309 3 290 272 284 4 254 265 5 286 262 6 289 277 7 - 263 269 8 287 292 9 160 195 N.B. Table is for front petals 30/12/2018 Nick Lumb

MSC layout on cooling tubes 30/12/2018 Nick Lumb

Bulkhead: available space 12 and 6 o’clock: pixel services 3 and 9 o’clock: closed sectors for rigidity Available depth: 89mm 30/12/2018 Nick Lumb

Routing to PP1 30/12/2018 Nick Lumb

10°- 45° degree sector 30/12/2018 Nick Lumb

45°- 80° sector 30/12/2018 Nick Lumb

Interference with pixel services 30/12/2018 Nick Lumb

135°-170° sector (6x4) 30/12/2018 Nick Lumb

Space taken in Z 30/12/2018 Nick Lumb

Organisation of other services 30/12/2018 Nick Lumb

The MSC connector Robust connector for MSC at bulkhead and PP1 Compact encapsulation performed in industry (W. Karpinski) Width (male+fem.) = 45mm Thickness = 15mm Height = 85mm 30/12/2018 Nick Lumb

6 x 4 30/12/2018 Nick Lumb

Final scheme: 2 x 12! 30/12/2018 Nick Lumb

Conclusions Optical fiber lengths finalised Awaiting prototype for cooling loops Routing worked out for cable paths from inside TEC to bulkhead connections (final cable lengths within 2 weeks) Optimal scheme for distribution of connectors at bulkhead determined 30/12/2018 Nick Lumb

Possible connection schemes 5 x 5 6 x 4 355 mm 310 mm 8 x 3 30/12/2018 Nick Lumb

Top view 5 x 5 6 x 4 65mm 8 x 3 30/12/2018 Nick Lumb