API SC-16 task group for Specification 16D

Slides:



Advertisements
Similar presentations
API 17 A Winter session 2013 Report. API17A Formation of task groups WE ARE REQUEST ING VOLIUNTEERS FOR EACH TASK GROUP Task Group 1 Overview systems.
Advertisements

SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
API S64, 3 rd Edition. 18 Dec 2013 Update. API S64 Chair – Tony Hogg Co-Chair – Open Current Edition – 2nd Edition, November 2001 Listing of Meetings.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
Group 5 : Rules of Engagement and CTF Operational Standards of Conduct MNF SOP 18 After Action Review (AAR) 8 June 2015 Format.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
SC18:TG8 API Specification Q1 Guidance Document.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
San Francisco, CA. SC8 Liaison Report
Text #ICANN49 Policy & Implementation Working Group Update.
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
Task Group API 19SS Sand Screens
API SC 10, Work Group 3 Update:
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
API 17Q – Subsea Equipment Qualification
API 16F June 2017 Specification for Marine Drilling Riser Equipment
API S64 Summer Conference Update.
IMT-Advanced Opening Report
Status Update on API 16Q / 16R / 16F
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Specification on float equipment
Draft Recommendation Overview
ISO TC64/SC4/WG2 May 2011 status
RAISING PERFORMANCE. TOGETHERTM
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC 10, Work Group 3 Update:
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
API Summer Standardization Conference
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
API 16AR Specification for Drill-through Equipment Remanufacturing
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API RP 59 June 2017 Recommended Practice for Well Control Operations
API Standard 53 Update June 2017
API 16 AR Specification for Drill-through Equipment Remanufacturing
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API 16 AR Specification for Drill-through Equipment Remanufacturing
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Float Equipment API Spec 10F
API RP 16AS January 2019 Standard for BOP Systems
API 16C Choke and Kill Equipment
API RP 59 Well Control Operations Chair – Tom Proehl
API Specification 16D Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment.
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

API SC-16 task group for Specification 16D Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment

Specification 16D Chair – Brian Wright Co-Chair – Maynard Chance Currently on Second Edition published in June 2004 and reaffirmed June 2010. Specification 16D

Primary areas of change addressed for the Third Edition: Accumulator Functional Volume Requirements (FVR) will include new performance criteria. FMEA requirements for new designs. Additional specifications for secondary & emergency systems. Align the specification with the requirements of Standard 53 & Recommended Practice 64. Specification 16D

Specification 16D Open issues to be finalized for the Third Edition: New examples for sizing accumulators. Update of annexes for design input (BOP Stack data). Finalize formatting for numerous sections. Update normative references Update glossary terms (consistent with other SC16 documents) Specification 16D

Document content being finalized during Q3 2014. Target date for ballot of document is 4th quarter of 2014. Specification 16D