questions for cern – doyle rev 7/09/07 1/5

Slides:



Advertisements
Similar presentations
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Advertisements

Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
1 Integration of collimators in the dispersion suppressors Status of 11 T cryo- assembly integration Dec 17, 2013
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
“Fix Tube Sheet” Heat Exchanger
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
Alice overview New detector and chamber ALICE TC.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
Status of Activities at CERN
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Kapton module ass. Spacers for pins 3.6 m m 1.25 mm.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
Pre-LHCb week / CALO meeting, CERN SBBeam plugs for in 1 
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
7/8/08 John Amann LC Mechanical Engineering LC 18M W Beam Dump Mechanical Engineering Design Updates.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
News and Introduction from CERN June 15th, 2005
L. Gentini, A. Bertarelli, F. Carra
new straw end plug: D=10.6 mm straws support frame Levan option
Preliminary results for electron lens with beam current of 20 A
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Crab Cavity HOM Coupler Specification Drawings & Tolerances
LARP Phase II Secondary Collimator RC1
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
Four OTR Tasks.
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Changes to SiD since the DBD
Injection direction This area is OK , because the pin into the tube have a supporting point in this area . The injection force push the pin to the other.
Beam Wire Scanners (PS prototype and LIU series)
Challenges for FCC-ee MDI mechanical design
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
Recommendations of 12/16/05 review committee & SLAC response
LARP Collimation – Engineering & Analysis
23 April 2012 Tom Markiewicz/SLAC
Beam Finder Wire Assembly Undulator System
Current Design and Short Status
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Lithium lens and window tests
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
US LHC Accelerator Research Program
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
Single Detector Design
BGC Collaboration Meeting –
After service guide for changing PCB
Results on RF-Measurements on 3-Convolution HL-LHC fingers
Presentation transcript:

2007-07-10 questions for cern – doyle rev 7/09/07 1/5 E. Doyle July 10, 2007 2007-07-10 questions for cern – doyle rev 7/09/07 1/5

Outstanding Questions (reminder) 1. Part numbers, descriptions, specifications, etc a. Steppers b. Resolvers c. Linear bearings 2. Pin assignments (also connector part numbers, wiring harness drawings, etc) pertaining to plug-in assembly 3. May we have some Cu/Ni tubing for evaluation? 2007-07-10 questions for cern – doyle rev 7/09/07 2/5

2007-07-10 questions for cern – doyle rev 7/09/07 3/5 New Requests 1. Water connections – in/out locations on plug-in assembly 2. Tolerance on 224 mm beam-beam spacing 3. adjacent beam pipe stay-clear 4. For discussion – use of gasketed flange tank cover on RC2 beam test prototype a. may preclude operation in some orientations gasketed flange 2007-07-10 questions for cern – doyle rev 7/09/07 3/5

New Requests - continued 5. What is “two-in-one” vacuum chamber you mentioned at 01/07 meeting? Is it applicable here? 6. Do we need the fifth stepper (+/- 10mm translation stage)? a. may we permanently offset stage ~10mm to gain space for our enlarged tank without shortening the bellows? 7. The damaged collimator that we’re buying a. what water pressure was intended/applied? b. is every unit tested? 2007-07-10 questions for cern – doyle rev 7/09/07 4/5

New Requests - continued 8. Confirm interpretation of bellows data? Lc = compressed length? Le = max extended length? Y-displacement of 20mm OK between 86 & 114 mm? Between Lc & Lcy transverse motion possible but reduced? 2007-07-10 questions for cern – doyle rev 7/09/07 5/5