PHASE I NEW SANCTUARY BUILDING COMPLETE WORSHIP SPACE FOR 350

Slides:



Advertisements
Similar presentations
Cathedral of the Immaculate Conception Project Information Session.
Advertisements

Oakwood Presbyterian Church Feasibility Study 10/02/2012Copyright Hoffman Architecture The Trellis and the Vine Oakwood Presbyterian Church.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Mission: Helping each other follow Jesus’ way. (John 14:6) Vision: That through Him all might be saved. (John 3:17) MARCH 2014 Miracle Sunday May 18, 2014.
Welcome! Purpose of this meeting: basic information and feedback session Goal – why we are all here Background/Facts Some ideas under consideration Feedback.
St. Charles Parish Strategic Pastoral Plan for Facility Development
2012 Town Hall Meeting. Parish History Master Plan Phase 1 Costs Next Steps Parish Survey 2012 Town Hall Meeting Questions + Answers Agenda.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
Smoke Alarm Placement Example #1 Single story house Laundry Garage Living Dining Kitchen Bedroom Bathroom.
2309 S 6 th St A Pictorial Tour. For sale Classic 100 year old home Estate Sale Over 1700 square feet Three + bedrooms Two baths Two car garage on extra.
 Today, the church has 82 members plus a growing number of children and offers 5 Sunday school classes each week for children and adults, as well as.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
The Kingdom Center Healing Streams Church & PAC Multi-Service Center.
ECCC Growth Strategy. Average Sunday Attendance ,006 1,120.
Church Renovation/ Expansion Proposals Willowdale.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
House Plans and Home Design. House Plan Symbols Wall: Window: Door: Shower: Tub: Toilet:
My House. Bedroom I sleep in my bedroom. What do you do in your bedroom? What kind of furniture do you have in your bedroom?
Church Building History Built in 1974 CBS Construction Total Footage: 5,800 Major & minor Remodel in 1994 and 2004: Sanctuary Dinner Hall 3 Classroom,
Please note that the architectural renderings that follow lack detail and accurate use of color. They are conceptual illustrations – not necessarily precise.
GROWING THE DREAM. Approximately fifteen years ago, our church leadership had a God-inspired dream to reach thousands of children, teens & families in.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
ADDITION & REMODEL Eugene Field Elementary School.
Please note that the architectural renderings that follow lack detail and accurate use of color. They are conceptual illustrations – not necessarily precise.
A LL D ULLES A REA M USLIM S OCIETY. ADAMS CORE VALUES.
IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly.
Mooresville Consolidated School Corporation School Board Presentation Central Office Renovation April 11, 2011 Administration Center Renovation Franklin.
Technology at Home. Just what is Technology? Technology is a way of accomplishing a task OR Something you use when doing a job.
We’re glad you’re here! Welcome!
Church Salaries Study Provided by Neal Farrand January 2003.
We’re glad you’re here! Welcome!
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
Grade 5 Lesson 12 This Is a Living Room. An apartment.
BRANDON BAPTIST CHURCH MASTER PLAN 8/31/2015 BRANDON BAPTIST MASTER PLAN BRANDON BAPTIST CHURCH MASTER PLAN 1.
EDWARDS CONGREGATIONAL UNITED CHURCH OF CHRIST CONGREGATIONAL MEETING July 10, 2011 SCHOLTZ GOWEY GERE MAROLF A R C H I T E C T S & I N T E R I O R D E.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
Operations 101 Staffing, Class 14. Chris Gunnare Grew up in Beresford, South Dakota Accounting degree from Arizona State University Married (Denise) with.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
A sustainable house By Ashleigh Towler. Down stairs garage Living room Bedroom 1 Laundry Kitchen/ dining room Bath entry.
Lighthouse Inn New London, Connecticut Lighthouse Inn Investors, LLC.
MIDDLE SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
Features of Proposed Homes for Haiti City of God Villages International.
A typical Croatian family Culture. A typical British family They live in a house with a garden. In a typical home there is a kitchen, a living room and.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
R.E. Subcommittee on Growth – Jan workshop What are the triggers points where changes are needed to the program / class configurations? Sanctuary.
Bethany Room Pre-K Sunday School and general storage. Room is very long and has access from each end and from parlor. No closets. INVENTORY – CURRENT USEIMMEDIATE.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
A HOUSE.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Town House located at the suburb Taftalidze II , Skopje
Building Committee April 20th, 2016.
Space Planning Objective 5.01.
Mary Queen of Apostles Facilities Master Plan Update
My home.
Education Building.
Programming.
Demmer Library Mission Statement
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
Space Planning Objective 5.01.
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
Recent Bond Accomplishments
WES Renovation Update Photo Gallery
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
Park Place Wesleyan Gala 2019
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
Presentation transcript:

PHASE I NEW SANCTUARY BUILDING COMPLETE WORSHIP SPACE FOR 350 ADA RESTROOMS TWO LOBBIES FOR ACCESS FROM MULTIPLE SITE AREAS A/V BOOTH

PHASE II NEW CHILDREN’S EDUCATION BUILDING PROPOSED 6,400 sq. ft. LOBBY WITH CHECK-IN/MONITOR DESK OFFICE & RESOURCE ROOM NURSERY SPACES FOR BABIES INCLUDING: INFANTS & CRAWLERS ROOM STEADY WALKERS ROOM SEPARATE SLEEPING ROOM NURSING ROOM CLASSROOMS FOR 2 YEAR-OLDS TO 6TH GRADE KITCHENETTE LAUNDRY ROOM ALSO INCLUDES A SACRISTY ROOM

PHASE II EXISTING BUILDINGS RENOVATIONS PROPOSED MANSE - CHURCH OFFICES: ADMINISTRATOR SENIOR PASTOR ASSOCIATE PASTOR ONE ADULT CLASSROOM EXISTING KITCHEN REMODELED ADA RESTROOM WHITE HOUSE – MULTI-FUNCTION BUILDING FOUR ADULT CLASSROOMS MULTIPLE GATHERING SPACES MULTIPLE BATHROOMS KITCHEN AND WORK SPACE. WILL ALSO BE USED FOR VISITING MISSIONARIES AND RETREATS CARRIAGE HOUSE (UPSTAIRS & DOWNSTAIRS) – YOUTH BUILDING YOUTH CLASSROOM AND SOCIAL AREA GARAGE RENOVATED FOR TWO-LEVEL RECREATION SPACE FUTURE RENOVATIONS INCLUDE: COVERED STAGE PAVED ACTIVITY AREA ADDITIONAL CLASSROOM IN WORKROOM SPACE HISTORIC SANCTUARY ROOMS (UPSTAIRS & DOWNSTAIRS) CLASSROOMS AND OFFICES (4 ROOMS)