CHAPTER 12 Cash Flow Estimation and Risk Analysis

Slides:



Advertisements
Similar presentations
Chapter 10 Project Cash Flows and Risk
Advertisements

Copyright © 2001 by Harcourt, Inc.All rights reserved. CHAPTER 12 Cash Flow Estimation and Risk Analysis Relevant cash flows Incorporating inflation.
Cash Flow Estimation and Risk Analysis
10-1 CHAPTER 11 Cash Flow Estimation And Chapter 12 Risk  Need to be in class for this ch.  Relevant Cash Flows  New Investment  Replacement Investment.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Capital Budgeting: Estimating Cash Flows and Analyzing Risk
The Capital Budgeting Decision (Chapter 12)  Capital Budgeting: An Overview  Estimating Incremental Cash Flows  Payback Period  Net Present Value 
Capital Budgeting: To Invest or Not To Invest  Capital Budgeting Decision –usually involves long-term and high initial cost projects. –Invest if a project’s.
1 The Basics of Capital Budgeting: Evaluating and Estimating Cash Flows Corporate Finance Dr. A. DeMaskey Should we build this plant?
1 Chapter 13 Capital Budgeting: Decision Criteria.
9-1 Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
UNIT 8 Project Valuation
Estimating cash flows: Relevant cash flows Working capital treatment Inflation Risk Analysis: Sensitivity Analysis, Scenario Analysis, and Simulation.
Copyright © 1999 by the Foundation of the American College of Healthcare Executives Principles of Capital Budgeting Project classifications Role.
1 CHAPTER 13 Capital Budgeting: Estimating Cash Flows and Analyzing Risk.
Chapter 11 Cash Flow Estimation & Risk Analysis. 2 Topics Estimating cash flows: Relevant cash flows Working capital treatment Risk analysis: Sensitivity.
Chapter 11: Cash Flows & Other Topics in Capital Budgeting  2000, Prentice Hall, Inc.
Copyright © 2002 by Harcourt, Inc.All rights reserved. CHAPTER 12 Cash Flow Estimation and Risk Analysis Relevant cash flows.
Copyright (C) 2000 by Harcourt, Inc. All rights reserved.
1 Cash Flow vs. Accounting Income Project Income Statement Revenues -Depreciation (D) - All other costs EBT -Taxes Project NI (PNI) Cash flow = PNI + Noncash.
Copyright © 2002 Harcourt College Publishers.All rights reserved. Relevant cash flows Working capital treatment Inflation Risk Analysis: Sensitivity.
Chapter 9 Project Cash Flows and Risk © 2005 Thomson/South-Western.
Copyright © 2001 by Harcourt, Inc.All rights reserved. CHAPTER 12 Cash Flow Estimation and Risk Analysis Relevant cash flows Incorporating inflation.
Chapter 9 - Making Capital Investment Decisions
Relevant cash flows Working capital treatment Unequal project lives Abandonment value Inflation CHAPTER 11 Project Cash Flow Analysis.
9-1 Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Capital Budgeting: Estimating Cash Flows and Analyzing Risk
Chapter 7 Project Cash Flows and Risk © 2005 Thomson/South-Western.
Intro to Financial Management Cash Flow and Risk in Capital Budgeting.
ADAPTED FOR THE SECOND CANADIAN EDITION BY: THEORY & PRACTICE JIMMY WANG LAURENTIAN UNIVERSITY FINANCIAL MANAGEMENT.
Financial Management Liliya N. Zhilina, World Economy and Inrernational Relations Department, Vladivostok State University of Economic and Services (VSUES).
Ch 12 Cash Flow Estimation and Risk Analysis.
12-1 CHAPTER 12 Cash Flow Estimation and Risk Analysis Relevant cash flows Incorporating inflation Types of risk Risk Analysis.
11-1 CHAPTER 11 Cash Flow Estimation and Risk Analysis Relevant cash flows Incorporating inflation Types of risk Risk Analysis.
Estimating cash flows: Relevant cash flows Working capital treatment Inflation Risk Analysis: Sensitivity Analysis, Scenario Analysis, and Simulation.
1 CHAPTER 11 Cash Flow Estimation and Risk Analysis.
1 Capital Budgeting Capital budgeting - A process of evaluating and planning expenditure on assets that will provide future cash flow(s).
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
Lecture Fourteen Cash Flow Estimation and Other Topics in Capital Budgeting Relevant cash flows Working capital in capital budgeting Unequal project.
CHAPTER 12 Cash Flow Estimation and Risk Analysis Relevant cash flows Incorporating inflation Types of risk.
CHAPTER 12 Cash Flow Estimation and Risk Analysis
11-1 Cash Flow Estimation and Risk Analysis Relevant cash flows Incorporating inflation Types of risk Risk Analysis 12/4/2015Manajemen Keuangan.
Finance Chapter 11 Cash flow estimation & risk analysis.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
Copyright © 2002 by Harcourt, Inc.All rights reserved. CHAPTER 12 Cash Flow Estimation and Risk Analysis Relevant cash flows Incorporating inflation.
Cash Flow Estimation and Risk Analysis Chapter 12  Relevant Cash Flows  Incorporating Inflation  Types of Risk  Risk Analysis 12-1.
Copyright © 2001 by Harcourt, Inc.All rights reserved. CHAPTER 12 Cash Flow Estimation and Risk Analysis Relevant cash flows Incorporating inflation.
Cash Flow Estimation Byers.
Chapter 9 Lecture - Making Capital Investment Decisions Sections (9
CHAPTER 11: Cash Flow Estimation and Risk Analysis
Cash Flow Estimation and Risk Analysis
Capital Budgeting: Estimating Cash Flows and Analyzing Risk
Cash Flow Estimation and Risk Analysis
Business Finance Michael Dimond.
Cash Flow Estimation and Risk Analysis
CHAPTER 12 Cash Flow Estimation and Risk Analysis
Cash Flow Estimation and Risk Analysis
CHAPTER 11 Cash Flow Estimation and Risk Analysis
Chapter 6 Principles of Capital Investment
CASH FLOWS IN CAPITAL BUDGETING
Bus 512- Capital Budgeting | Dr. Menahem Rosenberg
Cash Flow Estimation and Risk Analysis
Cash Flow Estimation and Risk Analysis
Cash Flow Estimation and Risk Analysis
Chapter 12 Cash Flow Estimation and Risk Analysis
Intro to Financial Management
Chapter 12 Cash Flow Estimation and Risk Analysis
Cash Flow Estimation and Risk Analysis
Presentation transcript:

CHAPTER 12 Cash Flow Estimation and Risk Analysis Relevant cash flows Incorporating inflation Types of risk

Proposed Project Cost: $200,000 + $10,000 shipping + $30,000 installation. Depreciable cost: $240,000. Inventories will rise by $25,000 and payables by $5,000. Economic life = 4 years. Salvage value = $25,000. MACRS 3-year class.

Sales: 100,000 units/year @ $2. Variable cost = 60% of sales. Tax rate = 40%. WACC = 10%.

Set up, without numbers, a time line for the project’s cash flows. 1 2 3 4 Initial Costs OCF1 OCF2 OCF3 OCF4 + (CF0) Terminal CF NCF0 NCF1 NCF2 NCF3 NCF4

Investment at t = 0: Equipment -$200 Installation & Shipping -40 Increase in inventories -25 Increase in A/P 5 Net CF0 -$260 DNOWC = $25 – $5 = $20.

What’s the annual depreciation? Year Rate x Basis Depreciation 1 0.33 $240 $ 79 2 0.45 240 108 3 0.15 240 36 4 0.07 240 17 1.00 $240 Due to 1/2-year convention, a 3-year asset is depreciated over 4 years.

Operating cash flows: 1 2 3 4 Revenues $200 $200 $200 $200 Op. Cost, 60% -120 -120 -120 -120 Depreciation -79 -108 -36 -17 Oper. inc. (BT) 1 -28 44 63 Tax, 40% -- -11 18 25 Oper. inc. (AT) 1 -17 26 38 Add. Depr’n 79 108 36 17 Op. CF 80 91 62 55

Net Terminal CF at t = 4: Recovery of NOWC $20 Salvage Value 25 Tax on SV (40%) -10 Net termination CF $35 Q. Always a tax on SV? Ever a positive tax number? Q. How is NOWC recovered?

Should CFs include interest expense? Dividends? No. The cost of capital is accounted for by discounting at the 10% WACC, so deducting interest and dividends would be “double counting” financing costs.

Suppose $50,000 had been spent last year to improve the building Suppose $50,000 had been spent last year to improve the building. Should this cost be included in the analysis? No. This is a sunk cost. Analyze incremental investment.

Suppose the plant could be leased out for $25,000 a year Suppose the plant could be leased out for $25,000 a year. Would this affect the analysis? Yes. Accepting the project means foregoing the $25,000. This is an opportunity cost, and it should be charged to the project. A.T. opportunity cost = $25,000(1 – T) = $25,000(0.6) = $15,000 annual cost.

If the new product line would decrease sales of the firm’s other lines, would this affect the analysis? Yes. The effect on other projects’ CFs is an “externality.” Net CF loss per year on other lines would be a cost to this project. Externalities can be positive or negative, i.e., complements or substitutes.

Here are all the project’s net CFs (in thousands) on a time line: 1 2 3 4 k = 10% -260 79.7 91.2 62.4 54.7 Terminal CF 35.0 89.7 Enter CFs in CF register, and I = 10%. NPV = -$4.03 IRR = 9.3%

What’s the project’s MIRR? 1 2 3 4 -260 79.7 91.2 62.4 89.7 10% 68.6 10% 110.4 10% 106.1 MIRR = ? 374.8 -260 Can we solve using a calculator?

Yes. CF0 = 0 CF1 = 79.7 CF2 = 91.2 CF3 = 62.4 CF4 = 89.7 I = 10 NPV = 255.97 INPUTS 4 10 -255.97 0 TV = FV = 374.8 N I/YR PV PMT FV OUTPUT

Use the FV = TV of inputs to find MIRR 4 -260 0 374.8 9.6 N I/YR PV PMT FV OUTPUT MIRR = 9.6%. Since MIRR < k = 10%, reject the project.

What’s the payback period? 1 2 3 4 -260 79.7 91.2 62.4 89.7 Cumulative: -260 -180.3 -89.1 -26.7 63.0 Payback = 3 + 26.7/89.7 = 3.3 years.

If this were a replacement rather than a new project, would the analysis change? Yes. The old equipment would be sold, and the incremental CFs would be the changes from the old to the new situation.

The relevant depreciation would be the change with the new equipment. Also, if the firm sold the old machine now, it would not receive the SV at the end of the machine’s life. This is an opportunity cost for the replacement project.

Q. If E(INFL) = 5%, is NPV biased? A. YES. k = k* + IP + DRP + LP + MRP. Inflation is in denominator but not in numerator, so downward bias to NPV. Should build inflation into CF forecasts.

Consider project with 5% inflation. Investment remains same, $260 Consider project with 5% inflation. Investment remains same, $260. Terminal CF remains same, $35. Operating cash flows: 1 2 3 4 Revenues $210 $220 $232 $243 Op. cost 60% -126 -132 -139 -146 Depr’n -79 -108 -36 -17 Oper. inc. (BT) 5 -20 57 80 Tax, 40% 2 -8 23 32 Oper. inc. (AT) 3 -12 34 48 Add Depr’n 79 108 36 17 Op. CF 82 96 70 65

Enter CFs in CF register, and I = 10%. Here are all the project’s net CFs (in thousands) when inflation is considered. 1 2 3 4 k = 10% -260 82.1 96.1 70.0 65.0 Terminal CF 35.0 100.0 Enter CFs in CF register, and I = 10%. NPV = $15.0 IRR = 12.6% Project should be accepted.

What are the three types of project risk that are normally considered? Stand-alone risk Corporate risk Market risk

What is stand-alone risk? The project’s total risk if it were operated independently. Usually measured by standard deviation (or coefficient of variation). Though it ignores the firm’s diversification among projects and investor’s diversification among firms.

What is corporate risk? The project’s risk giving consideration to the firm’s other projects, i.e., diversification within the firm. Corporate risk is a function of the project’s NPV and standard deviation and its correlation with the returns on other projects in the firm.

What is market risk? The project’s risk to a well-diversified investor. Theoretically, it is measured by the project’s beta and it considers both corporate and stockholder diversification.

Which type of risk is most relevant? Market risk is the most relevant risk for capital projects, because management’s primary goal is shareholder wealth maximization. However, since total risk affects creditors, customers, suppliers, and employees, it should not be completely ignored.

Are the three types of risk generally highly correlated? Yes. Since most projects the firm undertakes are in its core business, stand-alone risk is likely to be highly correlated with its corporate risk, which in turn is likely to be highly correlated with its market risk.

What is sensitivity analysis? Sensitivity analysis measures the effect of changes in a variable on the project’s NPV. To perform a sensitivity analysis, all variables are fixed at their expected values, except for the variable in question which is allowed to fluctuate. The resulting changes in NPV are noted.

What are the primary advantages and disadvantages of sensitivity analysis? Sensitivity analysis identifies variables that may have the greatest potential impact on profitability. This allows management to focus on those variables that are most important.

DISADVANTAGES: Sensitivity analysis does not reflect the effects of diversification. Sensitivity analysis does not incorporate any information about the possible magnitudes of the forecast errors.

Perform a scenario analysis of the project, based on changes in the sales forecast. Assume that we are confident of all the variables that affect the cash flows, except unit sales. We expect unit sales to adhere to the following profile: Case Probability Unit sales Worst 0.25 75,000 Base 0.50 100,000 Best 0.25 125,000

If cash costs are to remain 60% of revenues, and all other factors are constant, we can solve for project NPV under each scenario. Case Probability NPV Worst 0.25 ($27.8) Base 0.50 $15.0 Best 0.25 $57.8

Use these scenarios, with their given probabilities, to find the project’s expected NPV, NPV, and CVNPV. E(NPV)=.25(-$27.8)+.5($15.0)+.25($57.8) E(NPV)= $15.0. NPV = [.25(-$27.8-$15.0)2 + .5($15.0-$15.0)2 + .25($57.8-$15.0)2]1/2 NPV = $30.3. CVNPV = $30.3 /$15.0 = 2.0.

The firm’s average projects have coefficients of variation ranging from 1.25 to 1.75. Would this project be of high, average, or low risk? The project’s CV of 2.0 would suggest that it would be classified as high risk.

Is this project likely to be correlated with the firm’s business Is this project likely to be correlated with the firm’s business? How would it contribute to the firm’s overall risk? We would expect a positive correlation with the firm’s aggregate cash flows. As long as this correlation is not perfectly positive (i.e., r  1), we would expect it to contribute to the lowering of the firm’s total risk.

If the project had a high correlation with the economy, how would corporate and market risk be affected? The project’s corporate risk would not be directly affected. However, when combined with the project’s high stand-alone risk, correlation with the economy would suggest that market risk (beta) is high.

If the firm uses a +/-3% risk adjustment for the cost of capital, should the project be accepted? Reevaluating this project at a 13% cost of capital (due to high stand-alone risk), the NPV of the project is -$2.2 .

What is Monte Carlo simulation? A risk analysis technique in which probable future events are simulated on a computer, generating estimated rates of return and risk indexes.